Gratiot County, Michigan
Pine River Township is a township in Gratiot County, Michigan. Pine River Township adopts its own zoning, so inside its limits Pine River Township’s rules apply, not the county’s. Septic permits inside Pine River Township come from Pine River Township. 19 rules below are quoted from official sources and independently re-checked, most recently on October 30, 2026. Rules for unincorporated land are on the Gratiot County page.
Land inside Pine River township limits, except public rights-of-way, under the Pine River Township Zoning Ordinance (revised 6/16/2025)
“all land within pine river township except public rights-of-ways is divided into the following zoning districts”
All land inside Pine River township limits except public rights-of-way
“all land within pine river township except public rights-of-ways is divided into the following zoning districts”
Single-family dwellings in every district of Pine River township, under the ordinance definition of 'dwelling, single family' (definitions chapter, sec. 1802)
minimum floor area: >= 1000 square feet (two-story design: first story minimum 720 square feet)
“it contains a minimum floor area of one thousand (1000) square feet. if of a two (2) story design, it shall contain a minimum first story floor area of seven hundred twenty (720) square feet.”
“dwelling unit, minimum – one thousand (1000) square feet for a one story dwelling and seven hundred twenty (720) s.f. on the ground floor for two stories.”
AG (agricultural) district in Pine River township, section 304 dimensional regulations
lot area, minimum: >= 43560 square feet (1 acre; see the AG lot-frontage conditions)
“lot area, minimum – forty-three thousand, five hundred and sixty (43,560) square feet. lot width, minimum – one hundred and fifty (150’) feet.”
“lot area, minimum – thirty thousand (30,000) square feet.”
AG (agricultural) district in Pine River township, section 304
front yard, minimum: >= 80 feet (measured from the centerline of the roadway) · rear yard, minimum: >= 50 feet · side yard each, minimum: >= 15 feet (80 feet from the roadway centerline where abutting a right-of-way)
“front yard, minimum – eighty (80’) feet from the centerline of the roadway. rear yard, minimum – fifty (50’) feet. side yard, each, minimum – fifteen (15’) feet, except where abutting a right-of-way, the minimum is eighty (80’) feet as measured from the centerline of the roadway.”
AG (agricultural) district in Pine River township, section 304 dimensional regulations
“height, maximum – thirty-five (35’) feet. lot coverage, maximum percent- none.”
AG (agricultural) district in Pine River township, section 304 dimensional regulations
height, maximum: <= 35 feet (accessory-structure and appurtenance exceptions in the general provisions)
“height, maximum – thirty-five (35’) feet.”
Use of a manufactured home as a dwelling in Pine River township, as a temporary dwelling under the temporary-dwelling section (sec. 1523)
“use of a manufactured home for a temporary dwelling may be authorized by a temporary use permit only under the following circumstances.”
Single-family dwellings with private (non-public) water and sewer in Pine River township
“the dwelling is connected to a public sewer and water supply or to such private facilities approved by all applicable health departments.”
Single-family dwellings in Pine River township, under the ordinance definition of 'dwelling, single family'
“the dwelling is connected to a public sewer and water supply or to such private facilities approved by all applicable health departments.”
Pine River Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
New residential construction on land inside Pine River township, under the Gratiot County building permit process. The county guidance does not say whether Pine River township issues its own building permits; the county annual report that would say so was not confirmed for this township.
“township zoning permit (a copy of zoning permit or letter of township approval is required before a building permit can be issued.)”
Building work on land inside Pine River township, under the Gratiot County inspection process. Whether the township or the county performs the inspections was not confirmed.
“the permit holder is responsible for any and all inspections necessary.”
New or altered buildings on land inside Pine River township, under the Gratiot County certificate-of-occupancy process
“a new building or altered building shall not be used/occupied until a certificate of occupancy is issued by the code official.”
Septic systems on land inside Pine River township, through the Mid-Michigan Health Department
“contact the mid-michigan health department at (989) 875-3681 or visit their office located at 151 commerce dr., ithaca, mi 48847.”
Septic systems for new construction on land inside Pine River township, through the Mid-Michigan Health Department
“a copy of the well and septic permit is required. existing well and septic systems may be used, however, a copy of the well or septic evaluation must be submitted if the system is older than 10 years and has not been in use.”
Private wells for new construction on land inside Pine River township, through the Mid-Michigan Health Department
“a copy of the well and septic permit is required. existing well and septic systems may be used, however, a copy of the well or septic evaluation must be submitted if the system is older than 10 years and has not been in use.”
Driveway and curb-cut permits only where the access is onto a county road; not township or state roads
“contact gratiot county road commission at (989) 875-3811 for information on these permits, curb cuts, or any activity affecting county roads.”
We looked and could not find an official answer yet. Silence is not permission; ask Pine River Township or Gratiot County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Pine River Township publishes no rule on the point, not that none exists. Gratiot County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Pine River Township means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.