Bolthole Index

Gladwin County, Michigan

Zoning, building permits and septic rules in Hay Township, Michigan

Hay Township is a township in Gladwin County, Michigan. 3 rules below are quoted from official sources and independently re-checked, most recently on October 30, 2026. Rules for unincorporated land are on the Gladwin County page.

Answers from the rulebook for Hay Township

Hay Township’s own rules

  • Subdividing landRegulated (with conditions)

    Parcel splits, parcel combinations and boundary line adjustments in Hay township

    • The township charges a flat fee for these actions effective January 1, 2023.
    • The page does not state split approval standards; state and county land division rules were not checked.

    parcel split fee: 50 USD per parcel split (applies to parcel splits, parcel combinations and boundary line adjustments)

    “attention: starting january 1, 2023, all parcel splits, parcel combinations and boundary line adjustments will be $50 each.”

Rules another office applies inside Hay Township

Hay Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Building code adoptedAdopted (with conditions)

    Building, electrical, mechanical and plumbing construction on land inside Hay township; the county construction codes department enforces the state codes for the county

    • The cited county page states the department enforces the state of michigan codes; it does not name Hay township expressly.
    • Enforcing authority is Gladwin County Construction Codes, not the township.
    “our goal is to provide accurate and efficient service to the public while enforcing the state of michigan codes.”
  • Permit processPartial

    County permit validity and extension policy for work in Hay township (inferred from countywide service)

    • Only the permit validity and extension policy is stated on the page; application, plan review and inspection steps are not fully described.
    • Applies only to permits issued by the county Construction Codes department.

    permit validity: 18 months (after which a progress letter is sent)

    “all permits are good for 18 months. after the 18 months a letter will be sent requesting the progress of your project. if an extension is required, you will be charged $50.00. each extension is good for 6 months.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Hay Township or Gladwin County directly.

  • Owner-builder exemption — Owner-builder exemption for construction in Hay township
  • Local zoning — Whether Hay township adopts and administers its own zoning ordinance
  • Zoning districts — Zoning district map or schedule applicable to Hay township
  • Minimum dwelling size — Minimum dwelling size in the main single-family residential district of Hay township (district name not verified)
  • Minimum lot size — Minimum lot size in the main single-family residential district of Hay township (district name not verified)
18 more unanswered
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Driveway access
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Hay Township publishes no rule on the point, not that none exists. Gladwin County’s page lists the county offices to call.

← All of Gladwin County: county rules, score and offices