Charlevoix County, Michigan
Peaine Township is a township in Charlevoix County, Michigan. Peaine Township adopts its own zoning, so inside its limits Peaine Township’s rules apply, not the county’s. 23 rules below are quoted from official sources and independently re-checked, most recently on October 30, 2026. Rules for unincorporated land are on the Charlevoix County page.
Structures altered, extended or erected inside Peaine township under the township zoning ordinance.
“it shall be unlawful to use or permit the use of any structure or premises hereafter altered, extended or erected, until the building inspector has made an inspection of the premises and shall have approved the same for occupancy in writing.”
Land inside Peaine township limits. Peaine Township adopts and administers its own zoning ordinance, the Peaine Township Zoning Ordinance, so county zoning does not apply inside the township.
“zoning permits are necessary for certain types of construction and normally must be obtained before a building permit can be issued at the charlevoix county department of building safety.”
Zoning districts of Peaine township
“the zones are: r-1, r-2, a, c-1, c-2, cd, and i.”
R-2 single family residential district (section 6.2) inside Peaine township
minimum principal dwelling floor area: >= 600 square feet (excludes porches, garages, basements and utility areas)
“each principal dwelling shall have a minimum of 600 square feet of floor area, exclusive of porches, garages, basements and utility areas, with a multistory building having a minimum of 600 square feet on the first floor.”
“each dwelling unit in this zoning district shall have a minimum floor area of 600 square feet of usable floor area on the first floor, exclusive of porches, garages, basements and utility areas. accessory dwellings and cabins shall have a minimum floor area of 400 square feet.”
R-1 single-family residential district (section 6.1) inside Peaine township
minimum lot area: >= 100000 square feet (smaller splits allowed under section 6.1 exceptions) · minimum lot width at building line: >= 200 feet
“the minimum lot area for uses in this zoning district shall be one hundred thousand (100,000) square feet and have a minimum width of two hundred (200) feet at the building line.”
“the minimum lot area for use in this zoning district shall be fifteen thousand (15,000) square feet and a minimum width of one hundred (100) feet at the building line.”
“the minimum lot area for use in this zoning district shall be ten (10) acres with a minimum lot width of two hundred (200) feet.”
Agriculture "A" district (section 6.8) inside Peaine township
front yard setback: >= 50 feet · side yard setback (residential): >= 25 feet (60 feet for non-residential buildings) · rear yard setback: >= 100 feet
“1) front yard - there shall be a front yard setback of not less than fifty (50) feet. 2) side yard - for residential buildings, there shall be a side yard setback of not less than twenty-five (25) feet. for all other buildings, there shall be a minimum side yard setback of sixty (60) feet.”
“there shall be a rear yard setback of not less than thirty-five (35) feet, except in the case of lake lots.”
Occupying a travel trailer, motor home, pick-up or pop-up camper as a dwelling on private land inside Peaine township
maximum occupancy term: <= 12 months (may be extended up to 6 additional months by the zoning administrator)
“the term of said occupancy shall be not longer than twelve (12) months; provided that such term may be extended for up to six (6) additional months by the zoning administrator if progress is being made toward completion of the construction of the permanent residence”
Overnight camping with a travel trailer or pop-up camper on public streets, alleys, highways or other public places inside Peaine township
“it shall be unlawful for any person to park, or cause to be parked, any travel trailer, utility trailer, motor home, pick-up or pop-up camper on any street, alley, highway, or other public place in the township for storage, use as a dwelling, either temporarily or permanently, or for overnight stops, outside a licensed manufactured home park, a forest campground, a state park, or a township park.”
R-1 single-family residential district (section 6.1) inside Peaine township
maximum accessory dwelling floor area: <= 1500 square feet (or 50 percent of the principal dwelling floor area, whichever is less)
“one accessory dwelling per lot subject to the provisions of section 4.5 of this ordinance and further provided the accessory dwelling shall not exceed the lesser of 1,500 square feet or 50 % of the floor area of the principal dwelling”
“one accessory dwelling per lot subject to the provisions of section 4.5 of this ordinance and further provided the lot or parcel shall have a minimum area of 30,000 square feet and the accessory dwelling shall not exceed the lesser of 1,000 square feet or 50 % of the floor area of the principal dwelling”
Dwellings and buildings inside Peaine township that have no public sanitary connection
“the written approval of such facilities by the northwest michigan community health agency shall be filed with an application for a zoning permit.”
Land divisions and condominium subdivisions inside Peaine township
“article xvii subdivision and condominium subdivision regulations section 17.1 purpose section 17.2 general requirements”
R-1 single-family residential district (section 6.1) inside Peaine township; general flood-hazard duty only, no floodplain permit located
“the developer or builder shall be required to ensure that new or altered structures in this zoning district will not be damaged by flooding or flood hazards”
Zoning permit and related zoning application fees for Peaine township
“the township board may from time to time adopt by resolution a fee schedule establishing basic zoning fees related to the following: 1) zoning permits.”
Zoning and building permit sequence for construction inside Peaine township
“the charlevoix county building department will not issue a permit, without an approved zoning permit obtained from the beaver island zoning administrator.”
Peaine Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
New residential and other construction inside Peaine township; building permits are issued by the Charlevoix County Department of Building Safety, not by the township.
“building permits are issued by the charlevoix county building safety department.”
Building permits and inspections in Peaine township are run under the state building code as enforced by the Charlevoix County Building Safety Department.
“section 109 of the state building code requires the permit holder to notify this office when any portion of the work is ready for inspection.”
Residences inside Peaine township that need a private water well
“if the construction is for a residence, you need to apply for well and septic permits at health department northwest michigan.”
Road or driveway access for construction inside Peaine township; the Charlevoix County Road Commission issues the access permit.
“driveway culverts: please call the charlevoix county road commission.”
We looked and could not find an official answer yet. Silence is not permission; ask Peaine Township or Charlevoix County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Peaine Township publishes no rule on the point, not that none exists. Charlevoix County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Peaine Township means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.