East Jordan, Michigan requires zoning approval before a building permit for covered construction; the city accepts zoning applications, and building applications go to Charlevoix County.12 East Jordan sets district-specific land-use rules, while the Health Department of Northwest Michigan handles septic site evaluations and permits where public sanitary sewer is unavailable.34
At a glance
- Building permits
- Required for covered construction; apply at Charlevoix County12
- Zoning approval
- City approval before the building permit15
- Septic permits
- HDNW site evaluation and permit where public sewer is unavailable4
- Visitor RV occupancy
- Temporary permit; maximum 30 days per calendar year, no extensions6
- Minimum dwelling size
- RA and R-1: 960 sq ft for a one-story dwelling; different first-floor rule for two-story homes78
- Accessory dwelling
- R-3 allows qualifying ADUs up to 800 sq ft, no larger than the principal home9
Who to call
Zoning
City of East Jordan Planning & Zoning
City zoning applications and zoning administrator inquiries
201 Main Street, PO Box 499, East Jordan, MI 49727
Building permits
City of East Jordan online zoning application portal
Zoning applications and referral to the county for building applications
Building permits
Charlevoix County Department of Building Safety
Building, electrical, plumbing, mechanical, soil-erosion and storm-water permits, application review, and inspections
13513 Division St. Charlevoix, MI 49720
Septic permits
Health Department of Northwest Michigan, Charlevoix office
Septic and well permits for sites without municipal sewer or water
220 W. Garfield St., Charlevoix MI, 49720
Contact details are copied from each office’s official page and were checked against it on October 11, 2026.
Off-grid gear
Going off-grid in East Jordan means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in East Jordan, MI?
East Jordan requires zoning approval before a building permit for construction, enlargement, alteration or moving of covered buildings and structures.1 East Jordan’s online portal accepts zoning applications and expressly directs all building-permit applications to Charlevoix County.2 The practical sequence is city zoning approval, then the county building application, rather than treating the city zoning permit as permission to begin construction.12
Minor repairs or alterations that do not change use, occupancy, area, structural strength, fire hazard, fire protection, exits, light or ventilation do not require a city zoning permit; that exception does not establish an exemption from construction-code permits.1
Who handles East Jordan zoning and building applications?
East Jordan Planning & Zoning accepts zoning applications through BS&A Online; reach the city/zoning administrator at 231-536-3381 ext.3023 or [email protected].5 For building applications, the city directs applicants to Charlevoix County Department of Building Safety, reachable at 231-547-7236 or [email protected].210 Charlevoix County reviews applications before issuing building permits.10
Keep the health approval separate: the Health Department of Northwest Michigan evaluates septic sites and issues septic permits, rather than the city zoning counter.4 Ask the city for the current zoning fee schedule and the county for the construction-permit charges for your project.
Does East Jordan have zoning, minimum lot sizes and home-size rules?
East Jordan has zoning districts with different use and dimensional rules, so identify the parcel’s district before choosing a house plan.3 With public sewer and water accessible, minimum lot area per dwelling is 12,500 square feet in RA, 9,420 square feet in R-1 and 7,500 square feet in R-2A.111213
In East Jordan’s RA and R-1 districts, a one-story dwelling needs at least 960 square feet on the first floor; a two-story dwelling needs at least 700 square feet on the first floor and 960 square feet total.78 Ask the city zoning administrator to confirm setbacks and the current district map for the specific parcel; the city cautions that zoning-code updates are not posted regularly.5
How do septic permits and sewer connections work in East Jordan?
For East Jordan property without public sanitary sewer, the city requires a written district-health-department permit, and the Health Department of Northwest Michigan evaluates the site and issues the septic permit before installation.4 HDNW also performs a final review of the sewage system.4 Reach the health department’s Charlevoix office at (231) 547-6523.14
East Jordan requires covered occupied buildings abutting a street, alley or right-of-way with public sewer to connect at the owner’s expense within 90 days of official notice when the sewer is within 200 feet of the property line.15 Determine sewer availability before budgeting for septic: a private system is the alternative where public sanitary sewer is unavailable, not an automatic choice for every city lot.15
Can you live in an RV or tiny home in East Jordan?
East Jordan’s visitor RV rule allows temporary occupancy without charge in a dwelling owner’s or lessee’s side or rear yard, with an application or temporary zoning permit and approved sanitary facilities.6 Apply within 7 days after arrival; only 1 RV is permitted at a location at a time, for no more than 30 days in a calendar year, with no extensions.6 That visitor provision does not establish permission to live in an RV on a vacant lot while building.6
We could not confirm a separate tiny-home occupancy rule; ask the city zoning administrator about your proposed structure. East Jordan’s conventional and manufactured single-family dwelling requirements generally include a 24-foot cross-section, a 24-by-24-foot ground-floor portion and perimeter foundations, except in state-licensed mobile-home parks and R-2A.16 In R-3, qualifying accessory dwellings may be up to 800 square feet, cannot exceed the principal dwelling’s size, and require an owner of record to occupy either unit.9
Building a home in East Jordan: what are the steps?
Start with East Jordan Planning & Zoning to establish the district and obtain zoning approval before the building permit.31 Confirm public sewer availability; if unavailable, arrange the septic site evaluation and permit with HDNW before installation.154 Submit the building application to Charlevoix County and allow for application review before issuance.210
Notify the city zoning administrator when construction is ready for the zoning inspections at staking out and completion; construction must stop if identified defects or noncompliance remain uncorrected.17 Michigan’s enforcing agency also periodically inspects work undertaken under its building permit.18 For land outside city limits, use the Charlevoix County guide and confirm the applicable local zoning administrator; zoning administration varies across the county’s cities and townships.19
Watch-outs
- East Jordan’s temporary visitor RV permit does not establish permission for year-round RV occupancy or occupancy on vacant land while building.6
- We could not confirm East Jordan’s certificate-of-occupancy procedure; ask Charlevoix County Building Safety what approval is required before moving in.2
- Michigan prohibits new residential construction in the regulated floodway; ask the city zoning administrator and EGLE about the parcel before choosing a building site.20
Sources
- Sec. 46-38. Zoning permit (East Jordan), quoted and re-checked
- City of East Jordan online zoning application portal (bsaonline.com)
- Sec. 46-233. Dimensional requirements (East Jordan), quoted and re-checked
- Sewage Systems – Health Department of Northwest Michigan (East Jordan), quoted and re-checked
- City of East Jordan Planning & Zoning (eastjordancity.org)
- Sec. 46-725. Use of recreation vehicles as temporary dwellings by visitors (East Jordan), quoted and re-checked
- Sec. 46-233. Dimensional requirements (East Jordan), quoted and re-checked
- Sec. 46-265. Dimensional requirements (East Jordan), quoted and re-checked
- Sec. 46-355. Permitted accessory uses (East Jordan), quoted and re-checked
- Charlevoix County Department of Building Safety (charlevoixcounty.org)
- library.municode.com (East Jordan), quoted and re-checked
- library.municode.com (East Jordan), quoted and re-checked
- library.municode.com (East Jordan), quoted and re-checked
- Health Department of Northwest Michigan, Charlevoix office (charlevoixcounty.org)
- Sec. 44-141. Use of public sewers required (East Jordan), quoted and re-checked
- Sec. 46-730. Conventional dwelling unit requirements (East Jordan), quoted and re-checked
- Sec. 46-38. Zoning permit (East Jordan), quoted and re-checked
- MCL 125.1512, Inspection of construction (Michigan statewide rule), quoted and re-checked
- Charlevoix County Directory, quoted and re-checked
- Floodplains (Michigan statewide rule), quoted and re-checked
Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.