Calhoun County, Michigan
Marshall Township is a township in Calhoun County, Michigan. Marshall Township adopts its own zoning, so inside its limits Marshall Township’s rules apply, not the county’s. 25 rules below are quoted from official sources and independently re-checked, most recently on October 30, 2026. Rules for unincorporated land are on the Calhoun County page.
Construction, enlargement, alteration, conversion or moving of any building or structure inside Marshall township, issued by the township building inspector
first inspection deadline: <= 180 days
“a building permit is required for and shall be obtained from the building inspector prior to the construction, enlargement, alteration, conversion, or moving of any building or structure except under the following circumstances:”
Permitted construction inside Marshall township
“the building inspector shall inspect the lot and building and structure which is the subject of an application for a building permit at the time of the staking out of the building foundation, at the completion of the work authorized by the permit and at such other times as are required by the state construction code (act 230)”
Buildings and lots inside Marshall township that required a building, special use or other permit
“no lot, building, or structure for which a building, special use, or other permit was or should have been obtained under this ordinance or other law, shall be occupied or used until an occupancy permit shall have been issued by the building inspector.”
All land inside Marshall township's limits (Calhoun County, Michigan), not the county's unincorporated area
“zoning ordinance fire department organizational ordinance 1987-2”
Zoning districts inside Marshall township
“article 2 zoning districts and map section 2-1 zoning districts section 2-2 zoning map”
Principal dwellings in the AG agricultural district of Marshall township
minimum gross floor area: >= 800 sq ft
“principal building size max. height (ft.) 403 35 35 35 max. stories 3 2½ 2½ 3 min. gfa (s.f.) 800 800 800 600”
“principal building size max. height (ft.) 403 35 35 35 max. stories 3 2½ 2½ 3 min. gfa (s.f.) 800 800 800 600”
Lots in the R-1 low density residential district of Marshall township
minimum lot area: >= 30000 sq ft (sewer or septic service) · minimum lot width: >= 150 ft (sewer or septic service)
“table 3.3 spatial requirements: agricultural and residential districts requirement ag r-1 r-2 r-3 lots 1 min. area (s.f.) sewer 2 ac 30,000 15,000 septic 2 ac 30,000 30,000”
“table 3.3 spatial requirements: agricultural and residential districts requirement ag r-1 r-2 r-3 lots 1 min. area (s.f.) sewer 2 ac 30,000 15,000 septic 2 ac 30,000 30,000”
Principal buildings in the R-1 low density residential district of Marshall township
minimum front setback: >= 50 ft · minimum least side setback: >= 20 ft · minimum total side setback: >= 40 ft · minimum rear setback: >= 50 ft
“principal building setbacks min. front (ft.) 60 50 30 35 min. least side (ft.) 50 20 10 505 min. total side (ft.) 100 40 25 100 min. rear (ft.) 50 50 35 502”
“principal building setbacks min. front (ft.) 60 50 30 35 min. least side (ft.) 50 20 10 505 min. total side (ft.) 100 40 25 100 min. rear (ft.) 50 50 35 502”
Lots in the AG agricultural district of Marshall township
maximum lot coverage: <= 15 %
“max. lot coverage 15% 20% 30% 35% principal building setbacks min. front (ft.) 60 50 30 35”
“max. lot coverage 15% 20% 30% 35% principal building setbacks min. front (ft.) 60 50 30 35”
Principal buildings in the R-1 low density residential district of Marshall township
maximum building height: <= 35 ft · maximum stories: <= 2.5 stories
“principal building size max. height (ft.) 403 35 35 35 max. stories 3 2½ 2½ 3 min. gfa (s.f.) 800 800 800 600”
Recreational vehicles parked on residential lots inside Marshall township
temporary living stay: <= 21 days (per occasion, no more than two occasions per calendar year)
“recreational vehicles may be parked temporarily in driveways for temporary living purposes up to 21 days, no more than two (2) times per calendar year, with no less than 30 days between each occasion.”
Accessory dwellings on residential lots inside Marshall township
attached accessory dwelling units per lot: <= 1 units
“detached accessory dwellings prohibited. no detached accessory building shall be used for dwelling purposes.”
Buildings meant for human occupancy inside Marshall township without an approved water source and sanitary disposal system
“no building meant for human occupancy may be used without an approved water source and sanitary disposal system.”
New buildings for human occupancy inside Marshall township
“water, sewer, and septic zoning and building permits shall not be issued for any structure required to have water and sanitary facilities unless well and septic permits are issued by the calhoun county health department or are proposed to be connected to public water and sewer systems.”
Structures necessary to an agricultural operation inside Marshall township (exempt from building permit only)
“the erection of any structure necessary to an agricultural operation so long as the placement of the building or structure shall conform to the site development regulations of the district in which it is located.”
Division or subdivision of land inside Marshall township
“no parcel of land shall be divided in a manner that conflicts with any provisions of this ordinance or the michigan land division act.”
Development inside mapped floodplains in Marshall township
“storage of materials and equipment is prohibited unless such elements would not cause any significant obstruction to the flow, or reduction in the impoundment capacity of the floodplain.”
Zoning, building, electrical, mechanical, plumbing and sign permits issued by Marshall township
“zoning fee schedule permit fee schedule mechanical permit electrical permit zoning permit building and plan examination permit plumbing permit sign permit”
Permit applications for work inside Marshall township
permit validity if work not begun: 6 months
“any permit issued shall become invalid if the work is not begun within six (6) months after issuance of the permit or if the work is suspended or abandoned for a period of six (6) months after time of commencing the work.”
Marshall Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Septic systems for buildings meant for human occupancy inside Marshall township, where the building is not connected to public sewer
“certified permit from the county health department stating that the proposed on-site water and sewer system is in conformance with the county sanitary code.”
Private wells serving structures inside Marshall township that are not connected to public water
“water, sewer, and septic zoning and building permits shall not be issued for any structure required to have water and sanitary facilities unless well and septic permits are issued by the calhoun county health department or are proposed to be connected to public water and sewer systems.”
We looked and could not find an official answer yet. Silence is not permission; ask Marshall Township or Calhoun County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Marshall Township publishes no rule on the point, not that none exists. Calhoun County’s page lists the county offices to call.