Berrien County, Michigan
New Buffalo is a city in Berrien County, Michigan. New Buffalo adopts its own zoning, so inside its limits New Buffalo’s rules apply, not the county’s. Septic permits inside New Buffalo come from the county and state together. 8 rules below are quoted from official sources and independently re-checked, most recently on October 23, 2026. Rules for unincorporated land are on the Berrien County page.
Land inside New Buffalo city limits; the city's own Chapter ZO Zoning Ordinance governs land use and dimensional rules there
“adopted by the city council of the city of new buffalo 8-19-2024 by ord. no. 266.”
Land inside New Buffalo city limits
“article 2 establishment of districts section z2-01 districts established. section z2-02 purpose and intent of districts.”
Accessory dwelling units only, inside New Buffalo city limits. This is not a general minimum for principal dwellings.
minimum accessory dwelling unit size: >= 220 square feet
“the minimum size of an accessory dwelling unit shall be 220 square feet.”
One accessory dwelling unit on a lot inside New Buffalo city limits, under section z4-11(b) of the city Zoning Ordinance
accessory dwelling units per lot: 1 unit (detached, attached, or internal ADU) · minimum ADU size: >= 220 square feet · internal ADU maximum share of principal building floor area: <= 25 percent
“one detached, attached, or internal accessory dwelling unit shall be allowed per lot.”
Private on-site sewage disposal inside New Buffalo city limits where public sewer is not available
“where a public sanitary or combined sewer is not available under the provisions of section 16-9, the building sewer shall be connected to a private sewage disposal system complying with the regulations of the city and of the berrien county health department.”
A property inside New Buffalo city limits where a public sanitary or combined sewer is available
“as such time as a public sewer becomes available to a property served by a private sewage disposal system, as provided in section 16-9, a direct connection shall be made to the public sewer in compliance with this chapter, and any septic tanks, cesspools, and similar private sewage disposal facilities shall be abandoned and filled with suitable material.”
Accessory dwelling units inside New Buffalo city limits only; general short-term rental rules are in Chapter 11 (not opened)
“no accessory dwelling unit shall be used as a short-term rental as defined in this ordinance.”
We looked and could not find an official answer yet. Silence is not permission; ask New Buffalo or Berrien County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that New Buffalo publishes no rule on the point, not that none exists. Berrien County’s page lists the county offices to call.
Off-grid gear
Going off-grid in New Buffalo means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.