Bay County, Michigan
Hampton Township is a charter township in Bay County, Michigan. Hampton Township adopts its own zoning, so inside its limits Hampton Township’s rules apply, not the county’s. Septic permits inside Hampton Township come from Bay County (Bay County Health Department (Environmental Health Division) · (989) 895-4009). 19 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Bay County page.
Land inside Hampton charter township limits, under the township's own zoning ordinance (Ordinance 36A)
“section 6.04 area regulations all single-family homes shall conform to the area regulations as found in tables 3 and 4 of chapter 7 of this ordinance.”
Residential zoning districts r-1, r-2, r-3, r-3a, r-4, r-5, r-6, r-7, agriculture and cto in Hampton charter township
“r-1 40 10 40 14,500 100 11,000 85 - - r-2 40 10 35 14,500 100 10,000 80 14,400 120 r-3 35 10 30 12,000 100 10,000 80 14,000 120 r-3a 35 10 30 12,000 100 10,000 80 14,000 120 r-4 35 8 30 12,000 100 9,000 70 12,000 100 r-5 35 8 30 12,000 100 9,000 70 12,000 100 r-6 30 8 30 12,000 100 8,400 70 12,000 100 r-7 40 10 40 12,000 100 10,000 80 14,000 120 agriculture 40 10 40 30,000 120 30,000 120 - - cto 17.5 7 15 5,000 50 5,000 50 - -”
Single-family dwellings in the r-1 district of Hampton charter township
minimum floor area, one-story dwelling without basement: >= 1196 sq ft (Table 4 (r-1 row); 1,092 for one-story with basement and 884 for two-story (first floor))
“chapter 7 minimum floor area requirements for one & two family dwellings – table 4 applicable building code zone district 1 story w/out basement 1 story w/basement 1 story (1st floor) 2 story (1st floor) building width uniform standards state cosntr. code hud one family r-1 1196 1092 1092 884 24 x x”
One-family homes in the r-1 district of Hampton charter township
minimum lot area, one-family home: >= 14500 sq ft (minimum lot width 100 ft) · minimum lot area, one-family home in recorded subdivision served by public water and sanitary sewer: >= 11000 sq ft (minimum lot width 85 ft)
“r-1 40 10 40 14,500 100 11,000 85 - - r-2 40 10 35 14,500 100 10,000 80 14,400 120 r-3 35 10 30 12,000 100 10,000 80 14,000 120 r-3a 35 10 30 12,000 100 10,000 80 14,000 120 r-4 35 8 30 12,000 100 9,000 70 12,000 100 r-5 35 8 30 12,000 100 9,000 70 12,000 100 r-6 30 8 30 12,000 100 8,400 70 12,000 100 r-7 40 10 40 12,000 100 10,000 80 14,000 120 agriculture 40 10 40 30,000 120 30,000 120 - - cto 17.5 7 15 5,000 50 5,000 50 - - * any side or rear yard adjacent to a street must satisfy the minimum requirement for a front yard.”
“agriculture 40 10 40 30,000 120 30,000 120 - -”
Principal one-family dwellings in the agriculture district of Hampton charter township
front yard setback: >= 40 ft · side yard setback: >= 10 ft · rear yard setback: >= 40 ft
“agriculture 40 10 40 30,000 120 30,000 120 - -”
“r-1 40 10 40 14,500 100 11,000 85 - - r-2 40 10 35 14,500 100 10,000 80 14,400 120 r-3 35 10 30 12,000 100 10,000 80 14,000 120 r-3a 35 10 30 12,000 100 10,000 80 14,000 120 r-4 35 8 30 12,000 100 9,000 70 12,000 100 r-5 35 8 30 12,000 100 9,000 70 12,000 100 r-6 30 8 30 12,000 100 8,400 70 12,000 100 r-7 40 10 40 12,000 100 10,000 80 14,000 120 agriculture 40 10 40 30,000 120 30,000 120 - - cto 17.5 7 15 5,000 50 5,000 50 - - * any side or rear yard adjacent to a street must satisfy the minimum requirement for a front yard.”
One- and two-family homes in the residential districts listed in Table 3 of Hampton charter township (r-1 through r-7, agriculture, cto)
maximum combined building coverage: <= 25 percent of total lot area
“** the total area occupied by all buildings, including accessory buildings and other structures shall not exceed a combined total of twenty-five (25) percent of the total lot area.”
Two-story detached garages accessory to a dwelling in Hampton charter township
maximum peak height, two-story detached garage: <= 24 ft (text reads '24 at the peak'; unit inferred as feet) · maximum sidewall height, two-story detached garage: <= 20 ft (text reads 'sidewalls shall not exceed 20'; unit inferred as feet)
“the height of a two-story detached garage shall not exceed 24 at the peak’. sidewalls shall not exceed 20’.”
Recreational vehicles (campers, travel trailers, motor homes) parked or stored on residential lots in Hampton charter township, when used as living quarters
“recreational equipment parked or stored shall not have fixed connections to electricity, water, gas or sanitary sewer facilities, and at no time shall this equipment be used for living or housekeeping purposes.”
Mobile home condominium developments and mobile home parks inside Hampton charter township, in the zoning districts where they are allowed
“mobile home condominium development shall be allowed under the same terms and conditions as any other mobile home park within the applicable zoning districts.”
Sleeping quarters in a detached garage on a residential lot in Hampton charter township
“under no conditions shall any part of a detached garage be used for sleeping quarters.”
One- and two-family homes built inside Hampton charter township
“it shall be connected to public water and sewer service, if available, and/or a well or septic system approved by the bay county health department as required by the township plumbing code.”
Building permit fees for new construction and alterations inside Hampton charter township
building permit fee, total valuation $25,001 to $50,000: 516.09 USD (plus $13.31 for each additional $1,000.00 or fraction thereof, to and including $50,000.00)
“$25,001.00 to $50,000.00 $516.09 for the first $25,000.00 plus $13.31 for each additional $1,000.00, or fraction thereof, to and including $50,000.00”
Building, plumbing, mechanical and electrical permit and inspection process in Hampton charter township
“Inspections are scheduled by appointment.”
Hampton Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Building, plumbing, mechanical and electrical construction inside Hampton charter township; the township enforces the state codes locally
“The Township enforces the State Building, Plumbing, Mechanical and Electrical Codes as promulgated and adopted by the Bureau of Construction Codes.”
Septic system serving a home inside Hampton charter township, approved by the Bay County Health Department
“NEW SEWAGE PERMIT (Vacant Land Evaluation required for permit)”
Private well serving a home inside Hampton charter township, approved by the Bay County Health Department
“WELL PERMIT - Residential New Replacement”
We looked and could not find an official answer yet. Silence is not permission; ask Hampton Township or Bay County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Hampton Township publishes no rule on the point, not that none exists. Bay County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Hampton Township means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.