Town of Buxton is a town in York County, Maine. Town of Buxton adopts its own zoning, so inside its limits Town of Buxton’s rules apply, not the county’s. 17 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the York County page.
Construction regulated by Buxton Code Enforcement inside town limits.
“Effective beginning April 7, 2025 the Town of Buxton will be enforcing the newly amended Maine Uniform Building and Energy Code (MUBEC).”
Permitted construction inside Buxton.
“The Following Inspections are Required: - Footings inspected prior to pouring the cement.”
New buildings, additions, relocated or altered buildings, and newly established uses inside Buxton.
“No new building or addition shall be occupied after its construction, alteration or relocation, nor shall a new use be established in an existing building until a Certificate of Occupancy has been issued by the Code Enforcement Officer.”
All land and structures inside Buxton town limits.
“The provisions of this ordinance shall govern all land and structures within the boundaries of the Town of Buxton, Maine.”
Zoning districts within Buxton town limits.
“To implement the provisions of the Ordinance, the Town of Buxton is hereby divided into the following districts as defined in Article 9:”
Recreational-vehicle occupancy in a campground inside Buxton.
“A time limit is placed on the occupancy of any one camping space on a continuing basis as follows: Twelve weeks for the period May 15 to September 15 of each year and two weeks for all other time.”
Tent or camping-unit occupancy in a campground inside Buxton.
“A time limit is placed on the occupancy of any one camping space on a continuing basis as follows: Twelve weeks for the period May 15 to September 15 of each year and two weeks for all other time.”
Accessory dwelling units in zoning districts where residential uses are permitted inside Buxton.
ADUs per qualifying lot: <= 1 (Lot contains one or more single-family dwelling units)
“The ADU must be located in a zoning district where residential uses are permitted. No more than one ADU shall be permitted on a lot containing one or more single family dwelling units.”
External wastewater disposal systems associated with construction inside Buxton.
“External Wastewater Disposal Systems, Two inspections are required: Pre-bed inspection Final inspection (prior to backfilling)”
Land and buildings proposed for subdivision, as defined by the ordinance, inside Buxton.
“The provisions of these standards shall pertain to all the land and buildings proposed for subdivision, as defined under Article 2, within the boundaries of the Town of Buxton.”
Code Enforcement and Planning Board applications inside Buxton.
minimum building-permit fee: 50 USD · new residential living finished floor area fee: per 1 USD per square foot
“Effective October 8, 2025 BUILDING PERMIT APPLICATION FEES Minimum Fee .............................................................................................................................. $50.00”
Building-permit applications inside Buxton.
CEO decision period after complete application: <= 10 working days
“The Code Enforcement Officer shall approve or deny an application for a permit within ten working days of receipt of a complete application.”
Town of Buxton does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Single-family dwellings in Buxton Residential (Res) District.
minimum single-family lot size: >= 120000 square feet (Per dwelling unit; ADU exception in Table A footnote)
“Single Family 80,000(2) 120,000(2) 200,000(2) n/a 80,000(2)”
“Single Family 80,000(2) 120,000(2) 200,000(2) n/a 80,000(2)”
Structures in Buxton Residential (Res) District.
front yard: >= 40 feet · side yard: >= 30 feet · rear yard: >= 30 feet
“Front Yard(ft) 40 40 50 40 40 Side Yard(ft)(3) (4) (5) 20 30 50 20 20 Rear Yard(ft)(4) (5) 20 30 50 20 20”
“Front Yard(ft) 40 40 50 40 40 Side Yard(ft)(3) (4) (5) 20 30 50 20 20 Rear Yard(ft)(4) (5) 20 30 50 20 20”
Construction or other development within Buxton’s designated special flood-hazard areas.
application fee: 25 USD (Additional expert fee may be charged under §14.4)
“Before any construction or other development (as defined in Article 2 of this ordinance), including the placement of manufactured homes, begins within any areas of special flood hazard established in Section 14.1, a Flood Hazard Development Permit shall be obtained from the Code Enforcement Officer.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Buxton or York County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Buxton publishes no rule on the point, not that none exists. York County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Buxton means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.