York County, Maine
Biddeford is a city in York County, Maine. Biddeford adopts its own zoning, so inside its limits Biddeford’s rules apply, not the county’s. 7 rules below are quoted from official sources and independently re-checked, most recently on October 23, 2026. Rules for unincorporated land are on the York County page.
Buildings, structures, land uses and sanitary facilities inside Biddeford city, under the Land Development Regulations.
“a plumbing permit, building permit, and/or certificate of occupancy shall be required for all buildings or structures, uses of land and buildings, and sanitary facilities, according to the provisions of this ordinance.”
Buildings, structures, land uses and sanitary facilities inside Biddeford city, under the Land Development Regulations.
“a plumbing permit, building permit, and/or certificate of occupancy shall be required for all buildings or structures, uses of land and buildings, and sanitary facilities, according to the provisions of this ordinance.”
All land inside Biddeford city limits. Biddeford adopts and administers its own zoning under Part III Land Development Regulations, Article V (Establishment of Zones).
“for the purpose of this ordinance, the city is hereby divided into the following classes of zones:”
Zone classes inside Biddeford city limits under the Land Development Regulations, Article V.
“rural-farm zones to be known as r-f zones. limited rural-farm zones to be known as lr-f zones.”
Inside Biddeford city, coastal residential (CR) district only: single-family use lot area.
minimum lot area, CR zone: 20000-80000 sq ft (varies by soil profile and soil condition per Table C chart 9b1)
“table c lot size requirements for coastal residential (cr) district the minimum area in square feet required for single-family residential use as permitted in this zone shall be according to the following”
Land divisions inside Biddeford city under Chapter 66 Subdivisions of the code.
“chapter 66 subdivisions (sec. 66-1 – sec. 66-111)”
Land development permits and charges inside Biddeford city.
“ldr attachment a fees and charges (1 – 12)”
We looked and could not find an official answer yet. Silence is not permission; ask Biddeford or York County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Biddeford publishes no rule on the point, not that none exists. York County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Biddeford means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.