Town of Cutler is a town in Washington County, Maine. Town of Cutler adopts its own zoning, so inside its limits Town of Cutler’s rules apply, not the county’s. Septic permits inside Town of Cutler come from Town of Cutler. 9 rules below are quoted from official sources and independently re-checked, most recently on November 3, 2026. Rules for unincorporated land are on the Washington County page.

Answers from the rulebook for Town of Cutler

Town of Cutler’s own rules

  • Building permitRequired

    Construction or demolition inside Cutler town limits, under the town's building permit application

    • Permit must be approved before work starts; the form says the after-the-fact fee or fine for starting without approval, at the Planning Board's discretion, is $100 - $2,500 per day.
    • Form is the 2024-dated PDF; permit exemption for non-residential structures under 100 sq ft stated on the same form.
    “construction or demolition shall not start until permit has been approved.”
  • Local zoningPresent (with conditions)

    Land inside Cutler town limits, Washington County, Maine: the town's own Land Use Ordinance

    • The town's 2024 moratorium page says the Land Use Ordinance was adopted in 2019 and is no longer consistent with state law, and that the Planning Board is rewriting it; the current text may differ from the 2019 version.
    • Full text was not opened in this research; district and dimensional provisions are unknown (see other claims).
    “the plannning board is engaged in a massive rewrite of the town's land use ordinance, which was adopted in 2019 and is no longer consistent with state law”
    One more reviewed finding on this topic
    • Present (with conditions) — Land inside Cutler town limits within the shoreland zone (land near protected waters)
      “ordinances building permit application land use ordinance shoreland zoning ordinance harbor ordinance”
  • Who permits septicLocal (with conditions)

    Subsurface wastewater (septic) systems on land inside Cutler town limits

    • The Local Plumbing Inspector administers permits under the state Subsurface Wastewater Disposal Rules (10-144 CMR Ch. 241); the state sets the standards.
    • Town page names Stephen Cox as code enforcement officer and local plumbing inspector; the 2024 permit form names Kevin Brodie in the same role. Confirm the current LPI.
    “stephen cox code enforcement officer, local plumbing inspector 207-263-6887”
  • Subdividing landRegulated (with conditions)

    Subdivisions of land inside Cutler town limits

    • The Planning Board's 2024 moratorium covered subdivisions, along with commercial solar, commercial wind and telecom towers; the moratorium page says it was extended until August 3, 2026, which is before this research date. Whether it was renewed or has lapsed is unverified.
    • Subdivision ordinance text was not read.
    “the planning board deems the town's commercial development review ordinance and subdivision ordinance to be inadequate”
  • Permit feesPublished (with conditions)

    Building permits for construction inside Cutler town limits

    • Fee schedule is from the 2024-dated town permit form; the town site also hosts an unversioned permit application that was not opened, so the current schedule is unconfirmed.
    • Change of use: flat $50 fee; demolition: no fee; permit extension within 30 days after expiration: 50% of original fee.

    residential structures permit fee: 0.25 USD per square foot · commercial structures permit fee: 0.35 USD per square foot · accessory or non-residential structures over 100 sq ft permit fee: 0.2 USD per square foot

    “residential structures: $.25 per sq ft commercial structures: $.35 per sq ft accessory / non-residential structures over 100 sq ft: $.20 per sq ft”
  • Permit processPublished (with conditions)

    Building permit applications for construction inside Cutler town limits

    • Application must include tax map and lot number, proof of ownership, site plan, fee, and septic design or plumbing application where applicable; the Planning Board approves permits.
    • Permits expire two years after approval unless extended is a term I did not verify in the 2024 form text opened; treat as unconfirmed.
    “all building permit applications must be submitted to the cutler town office. incomplete applications will be tabled until all information is received.”

Rules another office applies inside Town of Cutler

Town of Cutler does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Septic permitRequired

    Installing a new, expanded, or replacement subsurface wastewater disposal system inside Cutler town limits (state rule administered by the town's Local Plumbing Inspector)

    • Normal maintenance and repair is excepted.
    • Owner or agent must obtain a valid permit before beginning construction of the system; permit valid for work begun within 24 months after issuance (30-a M.R.S. §4215).
    “installing a new, expanded, or replacement subsurface wastewater disposal system, or any individual components, requires a permit, except normal maintenance and repair.”
  • Septic inspectionRequired

    Subsurface wastewater disposal systems installed inside Cutler town limits

    • Two inspections: one site prep before installation and one before final backfilling.
    “the system must pass two inspections, one site prep before installation and one prior to final backfilling.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Town of Cutler or Washington County directly.

  • Owner-builder exemption — Owner-builders inside Cutler town limits
  • Building code adopted — New construction inside Cutler town limits
  • Inspections — Building construction inside Cutler town limits
  • Certificate of occupancy — Completed buildings inside Cutler town limits
  • Zoning districts — Zoning districts inside Cutler town limits
17 more unanswered
  • Minimum dwelling size
  • Minimum lot size
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Driveway access
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Town of Cutler publishes no rule on the point, not that none exists. Washington County’s page lists the county offices to call.