Washington County, Maine
Town of Cutler is a town in Washington County, Maine. Town of Cutler adopts its own zoning, so inside its limits Town of Cutler’s rules apply, not the county’s. Septic permits inside Town of Cutler come from Town of Cutler. 9 rules below are quoted from official sources and independently re-checked, most recently on November 3, 2026. Rules for unincorporated land are on the Washington County page.
Construction or demolition inside Cutler town limits, under the town's building permit application
“construction or demolition shall not start until permit has been approved.”
Land inside Cutler town limits, Washington County, Maine: the town's own Land Use Ordinance
“the plannning board is engaged in a massive rewrite of the town's land use ordinance, which was adopted in 2019 and is no longer consistent with state law”
“ordinances building permit application land use ordinance shoreland zoning ordinance harbor ordinance”
Subsurface wastewater (septic) systems on land inside Cutler town limits
“stephen cox code enforcement officer, local plumbing inspector 207-263-6887”
Subdivisions of land inside Cutler town limits
“the planning board deems the town's commercial development review ordinance and subdivision ordinance to be inadequate”
Building permits for construction inside Cutler town limits
residential structures permit fee: 0.25 USD per square foot · commercial structures permit fee: 0.35 USD per square foot · accessory or non-residential structures over 100 sq ft permit fee: 0.2 USD per square foot
“residential structures: $.25 per sq ft commercial structures: $.35 per sq ft accessory / non-residential structures over 100 sq ft: $.20 per sq ft”
Building permit applications for construction inside Cutler town limits
“all building permit applications must be submitted to the cutler town office. incomplete applications will be tabled until all information is received.”
Town of Cutler does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Installing a new, expanded, or replacement subsurface wastewater disposal system inside Cutler town limits (state rule administered by the town's Local Plumbing Inspector)
“installing a new, expanded, or replacement subsurface wastewater disposal system, or any individual components, requires a permit, except normal maintenance and repair.”
Subsurface wastewater disposal systems installed inside Cutler town limits
“the system must pass two inspections, one site prep before installation and one prior to final backfilling.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Cutler or Washington County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Cutler publishes no rule on the point, not that none exists. Washington County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Cutler means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.