Waldo County, Maine
Town of Belmont is a town in Waldo County, Maine. Town of Belmont adopts its own zoning, so inside its limits Town of Belmont’s rules apply, not the county’s. 7 rules below are quoted from official sources and independently re-checked, most recently on November 3, 2026. Rules for unincorporated land are on the Waldo County page.
Land use and structure activities inside Belmont town that require a permit under the Land Use Ordinance (2021), issued by the code enforcement officer
“a building permit shall be obtained from the code enforcement officer for 41 uses which are li”
All land inside Belmont town's limits, under the Town of Belmont Land Use Ordinance (2021). Not the unincorporated county area.
“the areas to which this ordinance is applicable are divided into the following districts as shown on the official land use district map”
Land inside Belmont town's limits, by district named in the Land Use Ordinance (2021)
“1. commercial c 2. rural residential rr 3. rural r 4. shoreland districts sd 5. landfill protection overlay po”
Single-family dwellings on lots in Belmont town's commercial and rural areas. Which figure applies to which district is not confirmed; the flattened PDF table does not map columns reliably.
minimum lot area, single-family dwelling: 1 acre, 2 acres, 3 acres (by district, mapping unconfirmed) (additional area may be required by other provisions of this ordinance)
“1. minimum lot area single family dwellings 1 acre 2 acres 3 acres”
Manufactured housing used as a dwelling on private land inside Belmont town, in the districts where the land use table marks it permitted (column-to-district mapping unconfirmed)
“key: y = yes, permitted; building permit only. n = no, not permitted.”
All land and buildings proposed for subdivision inside Belmont town
“the provisions of this ordinance shall pertain to all land and buildings proposed for subdivision within the boundaries of the town of belmont”
Building and site plan permits for land inside Belmont town
site plan action deadline: 60 days (from receipt of a completed application)
“within sixty (60) days of the receipt of a completed application, as determined by the planning board, the board shall act to approve or disapprove the site plan as submitted or amended.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Belmont or Waldo County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Belmont publishes no rule on the point, not that none exists. Waldo County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Belmont means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.