Somerset County, Maine
Town of Jackman is a town in Somerset County, Maine. Septic permits inside Town of Jackman come from Town of Jackman. 11 rules below are quoted from official sources and independently re-checked, most recently on November 3, 2026. Rules for unincorporated land are on the Somerset County page.
New construction, modification, additions, and pre-built structures in the Town of Jackman
building permit fee: 25 USD (payable at time of application)
“no person, firm, corporation, or other legal entity shall construct new, modify, add to an existing structure, or add a pre-built structure in the town which will increase the building structures on the property by 100 square feet or greater without a permit issued in advance by the town office for the town of jackman.”
Shoreland zoning districts in Jackman town; no general zoning district map found
“b. limited residential district 13 c. limited commercial district 13 d. general development i district 13 e. general development ii district 14 f. stream protection district 14”
Residential lots inside Jackman town's shoreland zone (general minimum lot standard, section 15(a)(1)(a), one claim for residential per-dwelling-unit lots); not verified for land outside the shoreland zone or for individual districts
minimum lot area, residential per dwelling unit: 40000 sq ft (shoreland zone only) · minimum shore frontage, residential per dwelling unit: 200 ft (shoreland zone only)
“minimum lot area (sq. ft.) minimum shore frontage (ft.) (1) (a) residential per dwelling unit 40,000 200”
New principal and accessory structures inside Jackman town's shoreland zone, measured from the normal high-water line of a water body or the upland edge of a wetland
setback from great pond or river flowing to great pond: 100 ft (horizontal distance from normal high-water line; 250 ft in resource protection district, 25 ft in general development I district) · setback from other water bodies, tributary streams, or wetland edge: 75 ft (horizontal distance from normal high-water line or upland edge of wetland)
“all new principal and accessory structures shall be set back at least one hundred (100) feet, horizontal distance, from the normal high-water line of great ponds classified gpa and rivers that flow to great ponds classified gpa, and seventyfive (75) feet, horizontal distance, from the normal high-water line of other water bodies, tributary streams, or the upland edge of a wetland”
Individual private campsites inside Jackman town's shoreland zone, not associated with campgrounds
campsites per lot: 1 count (or 30,000 square feet of lot area, whichever is less)
“individual private campsites not associated with campgrounds are allowed provided the following conditions are met: (1) one campsite per lot existing on the effective date of this ordinance, or thirty thousand (30,000) square feet of lot area within the shoreland zone, whichever is less, may be permitted.”
Plumbing and septic system permits for property inside Jackman town, administered by the town's code enforcement and plumbing inspector
“jackman now requires a building permit we do require a plumbing permit. you must get the permit before work on your system begins.”
Outhouses and privies in Jackman town
“note: this does not include outhouses or privies, as they require a permit from a licensed plumbing inspector.”
Land divisions inside Jackman town
“subdivision regulations subdivision application forms town limits for hunting”
Development inside mapped flood areas covered by the shoreland zoning ordinance in Jackman town
minimum elevation above 100-year floodplain: >= 1 ft (all buildings, including basements, in the flood provisions)
“the lowest floor elevation or openings of all buildings and structures, including basements, shall be elevated at least one foot above the elevation of the 100 year flood, the flood of record, or in the absence of these, the flood as defined by soil types identified as recent flood-plain soils.”
Building, shoreland zoning, and plumbing permits in Jackman town
building permit fee: 25 USD (payable at application; selectmen may revise after public hearing) · shoreland zoning permit fee: 50 USD (per the code enforcement page)
“building permit: $25 shoreland zoning permit: $50 plumbing permit: $vary cmp permit approval: $10”
Building permit applications in Jackman town
decision period: 45 days (from receipt of a complete, written application)
“town office officials shall decide whether to issue a permit within 45 days of receipt of a complete, written application and make a positive finding that all existing and applicable town ordinances are complied with.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Jackman or Somerset County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Jackman publishes no rule on the point, not that none exists. Somerset County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Jackman means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.