Piscataquis County, Maine
Town of Shirley is a town in Piscataquis County, Maine. Town of Shirley adopts its own zoning, so inside its limits Town of Shirley’s rules apply, not the county’s. 13 rules below are quoted from official sources and independently re-checked, most recently on November 3, 2026. Rules for unincorporated land are on the Piscataquis County page.
Construction, addition, relocation or replacement of any building in Shirley town
“before the construction, addition, relocation or replacement of any building or part thereof shall be commenced, the owner or lessee, or the architect, contractor or builder employed by such owner or lessee shall obtain from the ceo a permit covering such proposed work.”
Electrical wiring in Shirley town dwellings before it is covered or concealed
“no electric wiring shall be covered or concealed until it has been inspected and permission to conceal it has been given by the licensed electrician.”
Land inside Shirley town within 250 feet, horizontal distance, of the normal high water of any pond or river (shoreland zone). The town's Shoreland Zoning Ordinance is the only zoning ordinance located in the town's documents; the Land Use Ordinance regulates construction and has no zoning district map.
“the ordinance applies to all land areas within 250 feet, horizontal distance, of the normal high water of any pond, or river as defined.”
Year-round dwellings in Shirley town
minimum ground-floor living space: >= 400 sq ft (seasonal dwellings with planning board approval)
“no dwelling shall be constructed that will have an enclosed area of less than four hundred (400) sq. ft. of living space on the ground floor.”
Any lot in Shirley town on which a building is constructed or moved; the Land Use Ordinance sets no separate districts
minimum lot area: >= 80000 sq ft · minimum road frontage: >= 100 ft
“no building shall be constructed upon or moved to a lot with an area less than eighty, thousand (80,000) sq. ft with a frontage width facing any street, not less than one hundred (100 feet).”
Buildings and dwellings on any lot in Shirley town (road and side-yard setbacks)
road setback, town road: >= 50 ft (measured from center of road) · road setback, state road: >= 75 ft (measured from center of road) · side yard from adjoining lot line (dwelling): >= 20 ft
“no building, addition, alteration, replacement or relocation shall be erected or placed on a lot unless it shall be set back fifty (50) feet from center of the road for town roads and seventy-five (75) feet from the center of the road for state roads.”
Small dwellings (tiny homes) used as year-round residences in Shirley town
“a smaller size will be permitted for seasonal dwellings: it will require a building plan and special approval of the planning board.”
Manufactured (mobile) homes placed as dwellings in Shirley town
“manufactured housing, regardless of its date of manufactured, shall have a pitched roof, a foundation or a minimum of 6 inches reinforced slab, and exterior residential siding same as all regular houses under this ordinance and state building codes.”
New residential dwellings in Shirley town
“site evaluation and plumbino permits required on all new residential dwellings. copies should accompany this application.”
Privies (outhouses) for seasonal dwellings in Shirley town
“permission for construction of privies for seasonal dwellings must be obtained from the ceo or the plumbing inspector.”
New driveways and entrances onto town roads in Shirley town
minimum driveway width: >= 10 ft · minimum culvert diameter: >= 15 in
“driveways: each lot shall be provided with a driveway of not less than ten (10) feet in width. a road access permit must be obtained from the shirley road commissioner. driveways must have a 20foot length culvert with a minimum of a 15 inch diameter.”
Building permit fees for dwellings in Shirley town
habitable finished structure fee: 0.2 USD per sq ft (houses, camps and miscellaneous livable structures) · non-habitable unfinished structure fee: 0.15 USD per sq ft (accessory structures, stairwells, woodsheds, decks, garages, foundations)
“habitable finished structures fee $.20 per square foot this includes houses, camps and miscellaneous livable structures.”
Building permit process in Shirley town
decision period: <= 30 days
“the ceo after the proper examination of the application shall either issue the requested permit or transmit notice of refusal within thirty (30) days.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Shirley or Piscataquis County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Shirley publishes no rule on the point, not that none exists. Piscataquis County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Shirley means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
← All of Piscataquis County: county rules, score and offices