Bolthole Index

Penobscot County, Maine

Zoning, building permits and septic rules in Town of Holden, Maine

Town of Holden is a town in Penobscot County, Maine. Town of Holden adopts its own zoning, so inside its limits Town of Holden’s rules apply, not the county’s. 6 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Penobscot County page.

Answers from the rulebook for Town of Holden

Town of Holden’s own rules

  • Building permitRequired

    New construction, alterations, moving or demolition, and change of use inside Holden town limits

    • Building permit covers new construction of buildings and structures; alteration of existing buildings, structures, or land, or parts thereof, including changes to windows or doors, foundation repair, interior renovations for change in use, enclosing porches and decks, and construction of porches, decks, roads or driveways.
    • Applications must be written, on town forms, with a plan drawn to scale, and fees per article 10 of the zoning ordinance.
    • The Code Enforcement Officer must decide within 30 days; failure to act within 30 days constitutes denial.
    • Work must commence within 12 months of issuance and be substantially completed within 24 months, or the permit is void (extension of up to 12 months possible).
    • No building permit may be issued for an activity that is part of a site or project already approved by the Planning Board, except as provided in zoning ordinance sections 701.6 and 701.8.
    “a permit from the code enforcement officer shall be required before beginning or undertaking any of the following activities:”
  • Local zoningPresent (with conditions)

    Land inside Holden town limits: the town administers its own zoning ordinance through its Code Enforcement Officer and Planning Board

    • The zoning ordinance text itself (Articles 4, 5, 6, 8, 10 cited on the permits page) was not opened; district-level standards are not recorded here.
    • Zoning map and district boundaries were linked from the Planning Board page but not opened.
    “the planning board is responsible for the administration of the town's subdivision ordinance and zoning ordinance”
  • Septic permitRequired

    Installation or construction of septic treatment tanks, holding tanks, alternative toilets, primitive disposal systems and disposal areas inside Holden town limits

    • The town permits page lists these under the plumbing permit, not under a separate septic heading; the word 'septic' does not appear in the quoted passage.
    • Permit applications must show, where applicable, soils test pits and the subsurface sewage disposal system location.
    • State subsurface wastewater rules may also apply; not verified on an official page here.
    “the installation of or construction of treatment tanks, holding tanks, alternative toilets; including primitive disposal systems, disposal area and separate laundry disposal systems.”
  • Subdividing landRegulated (with conditions)

    Subdivision of land inside Holden town limits, administered by the Planning Board

    • Subdivision ordinance text was not opened; review thresholds and procedure are not recorded here.
    “the planning board is responsible for the administration of the town's subdivision ordinance and zoning ordinance”
  • Driveway accessRequired

    Creating a driveway entrance onto a Holden town road inside town limits

    • Permit comes from the Code Enforcement Officer; application form is on the town site (driveway entrance application).
    • Driveway standards in the zoning ordinance were not opened.
    “driveway entrance permit - application for a driveway entrance all construction or earth moving activities or other improvements connecting private property to the public right of way.”
  • Permit processPublished (with conditions)

    Permit application process for permits from the Holden Code Enforcement Officer

    • Applications are written, on the town's forms, with a plan; the officer decides within 30 days; silence after 30 days is a denial.
    • The officer may issue the permit, refer the applicant to the Planning Board for site plan review, or deny it.
    • Appeals go under article 12 of the zoning ordinance.

    decision deadline: 30 days

    “the code enforcement officer shall, within thirty (30) days of receipt of an application, issue the permit, if all proposed construction and uses meet the provisions of the zoning ordinance, refer the applicant to the planning board for site plan review, or deny the application.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Town of Holden or Penobscot County directly.

  • Owner-builder exemption — Owner-builder exemption from permits inside Holden town limits
  • Building code adopted — Which building code, if any, Holden town has adopted
  • Zoning districts — Published zoning district map and district list for Holden town
  • Minimum dwelling size — Minimum dwelling size inside Holden town limits
  • Minimum lot size — Minimum lot size in the main single-family residential district inside Holden town limits, and in any agricultural or rural-residential district
15 more unanswered
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Town of Holden publishes no rule on the point, not that none exists. Penobscot County’s page lists the county offices to call.

Off-grid gear

Going off-grid in Town of Holden means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

← All of Penobscot County: county rules, score and offices