Oxford County, Maine
Town of Sweden is a town in Oxford County, Maine. Town of Sweden adopts its own zoning, so inside its limits Town of Sweden’s rules apply, not the county’s. 11 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Oxford County page.
New dwellings and listed structures inside Sweden town; additions and structural changes to existing buildings.
structure footprint threshold: > 150 square feet (A permit is also required for listed structures or structures requiring foundations, footings, or excavation.)
“any buildings or structures where any of the following apply: • requiring foundations and/or footings; • requiring excavation; • have a footprint in excess of 150 square feet. household antennas, including satellite dishes, are exempted. all new structures within the shoreland zone, whether permanently or temporarily located, shall require a permit, regardless of size, except for docks and piers 4’ wide by 10’ long or smaller.”
Permitted development inside Sweden town, Maine.
“the code enforcement officer shall conduct on-site inspections to ensure compliance with all applicable laws and conditions attached to permit approvals.”
All land areas inside Sweden town, Maine.
“This Ordinance applies to all land areas within the Town of Sweden, including but not limited to areas within 250 feet, horizontal distance, of the normal high-water line of any great pond or river, upland edge of a freshwater wetland, and all land areas within 75 feet, horizontal distance, of the normal high-water line of a stream.”
Residential Zone inside Sweden town.
minimum lot size: 70000 square feet (Approximately 1½ acre.)
“ix.d.6.a. minimum lot size: 70,000 square feet (approximately 1½ acre)”
Residential Zone inside Sweden town.
roadway-centerline setback: 75 feet · rear and side lot-line setback: >= 30 feet (If structure height exceeds 30 feet, setback must equal or exceed height.)
“ix.d.6.d. rear and side lot line setbacks: the required setback is a minimum of 30 feet; however if the height of the structure exceeds 30 feet, the setback shall be equal to or greater than the height of the structure.”
One recreational vehicle per lot in the Limited Residential, Residential, and Rural Preservation Zones inside Sweden town.
maximum permitted occupancy duration: <= 120 days per calendar year (Permit required for more than 30 days per year; storage adjacent to a primary residence is excepted.)
“maximum duration of the permit will be 120 days per calendar year and may be subdivided in increments of 30 consecutive days only.”
A single manufactured home in the Rural Preservation Zone inside Sweden town.
“the following uses will be permitted in the rural preservation zone with a permit from the code enforcement officer.”
Cluster subdivisions and subdivision approvals inside Sweden town.
maximum house-lot and access-road coverage in subdivision: <= 50 percent of net buildable area (Applies to subdivisions of 10 acres or more; specified unbuildable areas are excluded.)
“xi.c.2. in subdivisions of 10 acres or more, house lots and access roads shall not cover more than 50% of the parcel’s net buildable area.”
New roads and driveways in a shoreland zone inside Sweden town.
great-pond driveway setback: >= 100 feet (May be reduced only where no reasonable alternative exists; never below 50 feet.) · wetland-or-stream driveway setback: >= 75 feet (May be reduced only where no reasonable alternative exists; never below 50 feet.)
“new roads and driveways shall be set back at least 100 feet from the normal high-water line of a great pond, and 75 feet from the upland edge of a wetland or stream, unless no reasonable alternative exists as demonstrated by the applicant. if no reasonable alternative as determined by the planning board exists, the road or driveway shall be set back as far as is practicable, but no less than 50 feet.”
Applications and reviews required by the Sweden zoning ordinance.
“All applications for a permit, appeal, variance, Site Plan Review, Subdivision approval or other review required by this Ordinance shall be accompanied by a fee as established by the Municipal Officers in the Town of Sweden Fee Schedule.”
Building or Use Permits inside Sweden town.
commencement deadline: <= 1 year after permit grant · substantial-completion deadline: <= 2 years after permit grant (One-year extension may issue at minimum Building Permit Fee.)
“A Building or Use Permit secured under the provisions of this Ordinance shall expire if the work or change is not commenced within one year of the date on which the permit is granted, and if the work or change is not substantially completed within two years of the date on which the permit is granted.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Sweden or Oxford County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Sweden publishes no rule on the point, not that none exists. Oxford County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Sweden means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.