Lincoln County, Maine
Town of Whitefield is a town in Lincoln County, Maine. Town of Whitefield adopts its own zoning, so inside its limits Town of Whitefield’s rules apply, not the county’s. 17 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Lincoln County page.
New or expanded residential, commercial, industrial, and institutional construction, development, and changes in use inside Whitefield town limits.
“No new and/or expanded development, construction or change in use shall commence”
Structures undergoing the Whitefield certificate-of-occupancy process.
“upon receipt of an inspection report by a certified third party inspector”
Any new, remodeled, or relocated dwelling unit or recreational vehicle located on a lot without a dwelling unit inside Whitefield town limits.
“Certificate of Occupancy Permits shall be required and shall be obtained from the CEO.”
Land inside Whitefield town limits, including land in the Shoreland Zone.
“Notwithstanding anything to the contrary in this section, emergency dwellings shall comply with all applicable provisions of the Town of Whitefield’s Building and Development and the Shoreland Zoning Ordinances.”
The Shoreland Zone inside Whitefield town limits.
“If the area of the proposed project is located in the Shoreland Zone”
Manufactured housing on conforming residential lots inside Whitefield town limits.
minimum living space: >= 750 square feet
“The unit shall contain at least seven hundred fifty square feet of living space.”
Residential lots inside Whitefield town limits.
minimum residential lot size: >= 1.5 acres · minimum residential lot size: >= 65340 square feet
“All residential lots shall have a minimum size of 1 ½ acres (65,340 square feet).”
New or expanded residential and accessory structures inside Whitefield town limits.
road-centerline setback: >= 50 feet (70 feet from the center line of Route 17.) · non-roadway property-line setback: >= 15 feet
“shall be at least fifteen (15) feet from any non-roadway property lines.”
Recreational vehicles used as temporary residences inside Whitefield town limits.
maximum temporary RV occupancy: <= 120 days per calendar year (Exceptions stated for active permanent-dwelling construction and approved housing emergencies.)
“one hundred twenty (120) days in a calendar year”
Manufactured housing located in or moved within Whitefield town limits.
minimum horizontal dimension: >= 14 feet · minimum living space: >= 750 square feet
“Manufactured housing units and appurtenances shall meet the following standards in order to be placed on any conforming residential lot”
Lots with one existing dwelling unit inside Whitefield town limits.
maximum additional ADUs: <= 2 dwelling units (One within or attached and one detached, or one of each.) · minimum habitable floor area: >= 190 square feet · maximum habitable floor area: <= 1500 square feet
“The Town shall allow on a lot with one existing dwelling unit the addition of up to two (2) dwelling units”
Non-structural agricultural land uses inside Whitefield town limits.
“All non-structural uses of land for agriculture and/or the growing and harvesting of trees.”
All proposed subdivisions, as defined, located in Whitefield town limits.
“No utility installations, no ditching, grading, or construction of roads, no grading of land or lots, and no construction of buildings shall be done”
Proposed development sites inside Whitefield town limits.
“The proposed site layout shall give consideration to the location, number, and control of access points”
Conversion of an existing residential building or structure to a short-term rental unit inside Whitefield town limits.
“conversion of an existing residential building or structure from single family use to use as a short-term rental unit.”
Building, development, and subdivision applications inside Whitefield town limits.
building application fee: 0 USD · minor development application fee: 75 USD (300 to less than 2,500 square feet.) · major development application fee: 150 USD (2,500 square feet or more.)
“Development Application Fee (300 to less than 2500 sq ft) - Minor Dev. - $ 75.00”
Building and development applications inside Whitefield town limits.
CEO action deadline for complete Building Application: <= 14 days
“The CEO shall act upon complete Building Applications within fourteen (14) days”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Whitefield or Lincoln County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Whitefield publishes no rule on the point, not that none exists. Lincoln County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Whitefield means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.