Town of Farmingdale is a town in Kennebec County, Maine. Septic permits inside Town of Farmingdale come from Town of Farmingdale. 6 rules below are quoted from official sources and independently re-checked, most recently on November 3, 2026. Rules for unincorporated land are on the Kennebec County page.

Answers from the rulebook for Town of Farmingdale

Town of Farmingdale’s own rules

  • Who permits septicLocal (with conditions)

    Wastewater disposal review for new building inside Farmingdale town limits

    • The town permit form routes the HHE-200 sign-off to the licensed plumbing inspector, so the local inspector issues the permit under state subsurface rules; the underlying state rule was not opened.
    “the above-named applicant has submitted an hee 200 form to me and the required permit has been issued.”
  • Septic permitRequired

    New building with wastewater disposal inside Farmingdale town limits, per the town building permit application

    • The town form requires an HHE-200 form to be submitted and a licensed plumbing inspector to issue the required permit before work proceeds.
    • Applies to the wastewater disposal system; the state subsurface wastewater rule itself was not opened.
    “the above-named applicant has submitted an hee 200 form to me and the required permit has been issued.”
  • Mandatory utility hookupConditional

    New building inside Farmingdale town limits where public sewer is involved

    • If the sewer will be public, the applicant needs a sign-off from the town official who issues sewer permits. The distance or availability rule requiring connection was not found; public water connection is not addressed in the opened form.
    “if the sewer will be public, the applicant is required to get a sign-off from the town official who issues sewer permits.”
  • Subdividing landRegulated (with conditions)

    Development and subdivision applications inside Farmingdale town limits, reviewed by the town Planning Board

    • The Planning Board reviews and approves applications for developments including subdivisions; the threshold and standards are in the town's ordinance, which was not opened.
    “this board is responsible for reviewing and approving several types of applications for developments, including subdivisions.”
  • Driveway accessLimited

    Road entrance on a town road serving a new building in Farmingdale town

    • A road entrance permit applies only if required; the form also lists a culvert permit. The entrance standards are not in the opened text.
    “if a road entrance permit is required, has the ceo conferred with the public works director regarding the requirements of the road entrance?”
  • Permit processPartial

    Building permit application submitted to the town of Farmingdale

    • The published form lists required attachments; the review steps, timing and fees were not found in the opened pages.
    “this application must be accompanied by the following: a site plan dimensioned, floor plan dimensioned, wastewater design”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Town of Farmingdale or Kennebec County directly.

  • Owner-builder exemption — Owner-builder exemption from permits in Farmingdale town
  • Building code adopted — Whether the Maine Uniform Building and Energy Code is adopted and enforced in Farmingdale town
  • Inspections — Building inspections for new construction inside Farmingdale town
  • Certificate of occupancy — Certificate of occupancy for new dwellings inside Farmingdale town
  • Local zoning — Whether Farmingdale town administers its own zoning ordinance inside town limits
18 more unanswered
  • Zoning districts
  • Minimum dwelling size
  • Minimum lot size
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Agricultural exemption
  • Building in a floodplain
  • Short-term rentals
  • Permit fees

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Town of Farmingdale publishes no rule on the point, not that none exists. Kennebec County’s page lists the county offices to call.

← All of Kennebec County: county rules, score and offices