Hancock County, Maine
Town of Trenton is a town in Hancock County, Maine. Town of Trenton adopts its own zoning, so inside its limits Town of Trenton’s rules apply, not the county’s. 13 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Hancock County page.
Activities, land uses, and structures inside Trenton that require a permit in their zoning district, including expansion, change, or replacement of an existing use or structure.
“After the effective date of this Ordinance no person shall, without first obtaining a permit, engage in any activity or use of land or structure requiring a permit in the district in which such activity or use would occur; or expand, change, or replace an existing use or structure; or renew a discontinued nonconforming use.”
Land inside Trenton town limits.
“To implement the provisions of this Ordinance, the Town of Trenton is hereby divided into the following Districts:”
Land inside Trenton town limits.
“Said Districts are located and bounded as shown on the Official Land Use Map, entitled "Land Use Map of Trenton, Maine" and on file in the office of the municipal clerk.”
Residential development in the Residential Rural District inside Trenton town limits.
minimum lot size: 40000 square feet (Residential Rural District example in the ordinance)
“the required minimum lot size for the Residential RR District of 40,000 square feet”
Structures inside Trenton town limits, by applicable land-use district.
“Lot size, front, rear, and side yard setbacks, maximum lot coverage, and maximum residential density for structures in each of the districts shall conform to the table on lot standards and the following:”
Structures inside Trenton town limits, by applicable land-use district.
“Lot size, front, rear, and side yard setbacks, maximum lot coverage, and maximum residential density for structures in each of the districts shall conform to the table on lot standards and the following:”
Buildings and structures in all Trenton land-use districts.
maximum building or structure height: 35 feet (Except steeples, silos, detached barns, windmills, water towers, and similar structures having no floor area)
“The building or structure height limitations for all districts shall be 35 feet, except for steeples, silos, detached barns, windmills, and water towers and similar structures having no floor area.”
A proposed Trenton structure not served by public sewer that requires installation of a subsurface sewage disposal system.
“If the property is not served by a public sewer, a valid plumbing permit or a completed application for a plumbing permit, including the site evaluation approved by the Plumbing Inspector, shall be submitted whenever the nature of the proposed structure would require the installation of a subsurface sewage disposal system.”
Subsurface sewage disposal systems for land uses inside Trenton town limits.
“All subsurface sewage disposal systems shall be installed in conformance with the State of Maine Subsurface Wastewater Disposal Rules.”
Installation of public-utility water, sanitary-district, or other utility services to a new structure inside Trenton town limits.
“No public utility water district, sanitary district or any utility company of any kind may install services to any new structure unless written authorization attesting to the validity and currency of all local permits required under this or any previous Ordinance, has been issued by the appropriate municipal officials.”
Permitted and conditional uses in all Trenton land-use districts.
“In all districts, permitted and conditional uses shall provide for safe access to and from public and private roads.”
Conditional-use permit applications inside Trenton town limits.
“An application for a conditional use permit shall be submitted to the Town Office, accompanied by a fee to be established by the Board of Selectmen.”
Land-use and conditional-use permit applications inside Trenton town limits.
scheduling period: <= 30 days (From receipt of written conditional-use application and fee)
“Every applicant for a permit shall submit a written application, including a scaled site plan, on a form provided by the municipality, to the appropriate official as indicated in Article III.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Trenton or Hancock County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Trenton publishes no rule on the point, not that none exists. Hancock County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Trenton means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.