Bolthole Index

Franklin County, Maine

Zoning, building permits and septic rules in Town of New Sharon, Maine

Town of New Sharon is a town in Franklin County, Maine. 4 rules below are quoted from official sources and independently re-checked, most recently on November 3, 2026. Rules for unincorporated land are on the Franklin County page.

Answers from the rulebook for Town of New Sharon

Town of New Sharon’s own rules

  • Building permitLimited

    Building in or moving structures to New Sharon town (a building notification, not a full building permit)

    • A building notification form must be filed with the code enforcement officer with a $25.00 fee.
    • Building, construction, or tree cutting within 250 feet of any body of water or wetlands requires contacting the planning board for additional requirements.
    • The town's page does not state that a full building permit is required; the separate building-permit requirement is unverified.
    “if you are planning to build in or move structures to new sharon, a building notification form is required to be filed with the code enforcement officer along with a fee of $25.00.”
  • Subdividing landRegulated (with conditions)

    Subdivision of land inside New Sharon town, reviewed by the town's planning board

    • The subdivision ordinance text was not opened; the ordinance's thresholds and standards are unverified.
    • Subdivision requires a planning board application on the town's form.
    “subdivision ordinance forms: subdivision application, site plan application checklist to review for completeness, review of esthetics”
  • Permit feesPublished (with conditions)

    Building notification fee for building in or moving structures to New Sharon town

    • Fee applies to the building notification form only; other permit fees were not found.

    building notification fee: 25 USD

    “if you are planning to build in or move structures to new sharon, a building notification form is required to be filed with the code enforcement officer along with a fee of $25.00.”
  • Permit processPartial

    Process for building in or moving structures in New Sharon town

    • Only the building notification step is published; the ordinance steps after notification were not located.
    “if you are planning to build in or move structures to new sharon, a building notification form is required to be filed with the code enforcement officer along with a fee of $25.00.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Town of New Sharon or Franklin County directly.

  • Owner-builder exemption — Owner-builder exemption for New Sharon town
  • Building code adopted — Which building code, if any, New Sharon town has adopted inside its limits
  • Inspections — Building inspections for construction inside New Sharon town
  • Certificate of occupancy — Certificate of occupancy for new dwellings inside New Sharon town
  • Local zoning — Whether New Sharon town administers a general zoning ordinance for land inside the town
21 more unanswered
  • Zoning districts
  • Minimum dwelling size
  • Minimum lot size
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Driveway access
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Town of New Sharon publishes no rule on the point, not that none exists. Franklin County’s page lists the county offices to call.

← All of Franklin County: county rules, score and offices