Franklin County, Maine
Town of Kingfield is a town in Franklin County, Maine. Town of Kingfield adopts its own zoning, so inside its limits Town of Kingfield’s rules apply, not the county’s. Septic permits inside Town of Kingfield come from the county and state together. 25 rules below are quoted from official sources and independently re-checked, most recently on November 3, 2026. Rules for unincorporated land are on the Franklin County page.
Buildings, structures and uses inside Kingfield town that the zoning ordinance makes subject to a permit
“any person required and entitled by any provision of the ordinance to obtain a permit for any building, structure, or use, shall file a written application with the permitting authority as designated in section 5.g district uses.”
All land inside Kingfield town limits (Franklin County, Maine), administered by the town under its own zoning ordinance
“all buildings or structures hereinafter erected, reconstructed, expanded or moved, and uses of premises in the town of kingfield shall be in conformity with the provisions of this ordinance.”
Zoning districts of Kingfield town (Village, Growth, Rural 1, Rural 2, roadway approach overlay, contract zoning)
“land uses are permitted in each district as shown in the following table in conformance with the performance standards of section 6”
Growth district, single-family and other lots inside Kingfield town
minimum lot size with public sewer: 10000 sq ft (growth district) · minimum lot size without public sewer: 40000 sq ft (growth district)
“minimum size (square feet) zoning district w/public sewer village growth rural 1 rural 2 10,000 10,000 na na w/o public sewer road frontage shore frontage 20,000 40,000 40,000 200,000 75 ft. 100 ft. 200 ft. 200 ft.”
“minimum size (square feet) zoning district w/public sewer village growth rural 1 rural 2 10,000 10,000 na na w/o public sewer road frontage shore frontage 20,000 40,000 40,000 200,000 75 ft. 100 ft. 200 ft. 200 ft.”
“minimum size (square feet) zoning district w/public sewer village growth rural 1 rural 2 10,000 10,000 na na w/o public sewer road frontage shore frontage 20,000 40,000 40,000 200,000 75 ft. 100 ft. 200 ft. 200 ft.”
“minimum size (square feet) zoning district w/public sewer village growth rural 1 rural 2 10,000 10,000 na na w/o public sewer road frontage shore frontage 20,000 40,000 40,000 200,000 75 ft. 100 ft. 200 ft. 200 ft.”
Village district inside Kingfield town
road setback: 35 ft (village district; measured from centerline) · side yard setback: 10 ft (village district)
“minimum setback 1. and maximum lot coverage zoning district road/ street village growth rural 1 rural 2 35 feet 40 feet 50 feet 100 feet side yard 10 feet 15 feet 50 feet 50 feet”
“minimum setback 1. and maximum lot coverage zoning district road/ street village growth rural 1 rural 2 35 feet 40 feet 50 feet 100 feet side yard 10 feet 15 feet 50 feet 50 feet”
“minimum setback 1. and maximum lot coverage zoning district road/ street village growth rural 1 rural 2 35 feet 40 feet 50 feet 100 feet side yard 10 feet 15 feet 50 feet 50 feet”
“minimum setback 1. and maximum lot coverage zoning district road/ street village growth rural 1 rural 2 35 feet 40 feet 50 feet 100 feet side yard 10 feet 15 feet 50 feet 50 feet”
Growth district inside Kingfield town
maximum lot coverage: <= 50 percent (growth district)
“lot coverage 75 percent 50 percent 50 percent 15 percent”
“lot coverage 75 percent 50 percent 50 percent 15 percent”
“lot coverage 75 percent 50 percent 50 percent 15 percent”
“lot coverage 75 percent 50 percent 50 percent 15 percent”
Residential buildings inside Kingfield town (general limit outside the rural exception)
maximum residential building height: <= 35 ft (except rural district (see separate claim))
“no residential building shall exceed thirty five (35) feet in height; except that in the rural district, the height limit may be increased to forty five (45) feet with planning board approval.”
“no residential building shall exceed thirty five (35) feet in height; except that in the rural district, the height limit may be increased to forty five (45) feet with planning board approval.”
Storage of recreational vehicles on a lot inside Kingfield town; the ordinance addresses storage, not living occupancy
“storage of one (1) or more recreational vehicles per lot is permitted providing that the following conditions are met: 1. the placement of the recreation vehicle on any lot shall meet all setback requirements.”
Campgrounds (commercial overnight RV and tent sites with a fee) inside Kingfield town in all districts listed in the land use table
minimum area per RV site: >= 5000 sq ft (not including roads and driveways; 5,000 sq ft per tent site is 2,500 sq ft)
“campgrounds shall contain a minimum of five thousand (5,000) square feet (not including roads and driveways) for each recreational vehicle site, and a minimum of two thousand five hundred (2,500) square feet (not including roads and driveways) for each tent site.”
Mobile homes used as a dwelling inside Kingfield town
“a mobile home used as a dwelling shall have plumbing and a sewage disposal system which shall be in conformity with the maine state internal plumbing code and the maine state subsurface wastewater disposal rules.”
A second dwelling structure on one lot inside Kingfield town (not a general accessory dwelling unit allowance)
“a second dwelling structure may be provided for persons who are dependent due to age or physical disability upon occupants of the principal dwelling structure: and”
Sewage disposal on lots inside Kingfield town: the town septic system where one serves the lot, otherwise the state subsurface wastewater rules
“1) sewage disposal must be provided either through the town septic system or in conformance with subsurface wastewater rules”
Subdivision and mobile home park development inside Kingfield town
“mobile home parks shall be subject to requirements contained in the town of kingfield subdivision ordinance and such minimum lot requirements as may be contained in section 5.g. of this ordinance.”
Use or building permit applications inside Kingfield town
“any application for a permit described in section 3.b.1 above shall be accompanied by a fee based on the schedule of fees adopted by the board of selectmen after notice and public hearing.”
Zoning use permit process inside Kingfield town
“such application shall be made on a form provided for that purpose.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Kingfield or Franklin County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Kingfield publishes no rule on the point, not that none exists. Franklin County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Kingfield means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.