Franklin County, Maine
Town of Jay is a town in Franklin County, Maine. Septic permits inside Town of Jay come from Town of Jay. 17 rules below are quoted from official sources and independently re-checked, most recently on November 3, 2026. Rules for unincorporated land are on the Franklin County page.
General residential and commercial construction inside Jay town outside the shoreland zone and floodplain.
“in june 2012 it was determined, by the citizens of the town, that building permits would not be required and that inspections for compliance with the mubec will not be conducted by the town.”
“please note that permits are still required for buildings located within the shoreland zone and floodplain.”
New construction and renovation subject to MUBEC inside Jay town.
“it will be the property owner's responsibility to contract with a licensed third party inspector to conduct all necessary inspections required under the code.”
New buildings, additions and renovations subject to MUBEC inside Jay town.
“before a certificate of occupancy may be issued for any new building, addition, renovation, etc. that is subject to compliance with the mubec, an inspection report must be submitted to the code officer verifying that compliance with the mubec has been achieved.”
Lots inside Jay town that are not in a subdivision and are served by a private septic system.
minimum lot area (private septic system): >= 20000 square feet (lots not in a subdivision; lots on town sewer have no minimum)
“private septic system: minimum lot size is 20,000 square feet per state plumbing rules.”
“town sewer: there is no minimum lot size.”
Structures inside Jay town relative to town roads.
setback from roadway centerline: >= 25 feet (or beyond the established right of way)
“structures shall be setback 25 feet from the center line of a roadway, or beyond the established right of way.”
“the town does not have a setback requirement for side boundaries.”
The portion of a lot inside the Jay shoreland zone.
maximum non-vegetated surface share of lot inside shoreland zone: <= 20 percent (general development district adjacent to rivers that do not flow to great ponds: 70 percent)
“with the exception of the general development district where located adjacent to rivers that do not flow to great ponds, non-vegetated surfaces shall not exceed a total of twenty (20) percent of the portion of the lot located within the shoreland zone.”
Principal and accessory structures in the Jay shoreland zone resource protection, limited residential and stream protection districts.
maximum structure height: <= 35 feet (applies in resource protection, limited residential and stream protection districts; excludes towers, windmills, antennas, cupolas, domes, widow's walks and similar structures with no floor area)
“principal or accessory structures and expansions to existing structures which are permitted in the resource protection, limited residential, and stream protection districts, shall not exceed thirty-five (35) feet in height.”
Septic (subsurface wastewater) systems on lots inside Jay town.
“the local plumbing inspector (hereafter, lpi) shall enforce all the provisions of this rule as a sworn agent of the municipal jurisdiction.”
Creating three or more lots or dwelling units inside Jay town within a five-year period.
lots or dwelling units triggering subdivision review: >= 3 count (within a five (5) year period)
“the subdivision regulations are part of the environmental ordinance and are triggered by the creation of three (3) or more lots or dwelling units within a five (5) year period.”
Work in floodplain areas around the Androscoggin River, Seven Mile Stream and Parker Pond inside Jay town.
“any work done in a floodplain area requires a permit from the town.”
Plumbing and general permit contacts inside Jay town.
“plumbing permits are required from the town of jay's plumbing inspector.”
Town of Jay does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
New buildings and renovations inside Jay town, enforced by the town under the state building code.
“the state has adopted a building and energy code (mubec) that requires all buildings in jay to be constructed in compliance with the code.”
New structures in Jay town that need a subsurface wastewater (septic) disposal system.
“the lpi shall receive applications for disposal system permits, issue permits for the installation of systems, inspect the premises for which such disposal system permits have been issued, and enforce compliance with the provisions of this rule.”
Septic systems permitted inside Jay town.
“the lpi shall receive applications for disposal system permits, issue permits for the installation of systems, inspect the premises for which such disposal system permits have been issued, and enforce compliance with the provisions of this rule.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Jay or Franklin County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Jay publishes no rule on the point, not that none exists. Franklin County’s page lists the county offices to call.