Cumberland County, Maine
South Portland is a city in Cumberland County, Maine. South Portland adopts its own zoning, so inside its limits South Portland’s rules apply, not the county’s. 8 rules below are quoted from official sources and independently re-checked, most recently on November 3, 2026. Rules for unincorporated land are on the Cumberland County page.
New construction and alterations inside South Portland city limits
“the city of south portland adopts, and thereby administers and enforces the provisions of the maine uniform building and energy code”
Land inside South Portland city limits, under the city's own zoning chapter (Chapter 27 Zoning of the South Portland Code)
“south portland code table 1 space and bulk regulations in residential districts”
Zoning districts in South Portland city, shown on the official zoning map
“which neighborhoods are shown on the official zoning map of the city of south portland”
Residential AA and Residential A districts in South Portland city, with the minimum varying by neighborhood
“the minimum lot area depends on the neighborhood in which the parcel is located, which neighborhoods are shown on the official zoning map of the city of south portland.”
Single-family dwellings in South Portland city residential districts (Table 1, Article IV)
minimum side yard for single-family dwelling 30 ft or less in height: 6 feet (principal buildings higher than 30 feet require 50% of building height)
“however, a single-family dwelling thirty (30) feet or less in height may have a minimum side yard of six (6) feet.”
Buildings inside South Portland city limits that abut a street, alley or right-of-way where a public domestic or combined sewer is located
“is hereby required at his expense to install suitable toilet facilities therein, and to connect such facilities directly with the proper public sewer”
Land divisions inside South Portland city limits
“division 2. minor subdivision division 3. major subdivision-preliminary plan division 4. major subdivision-final plan”
Building permit application process in South Portland city
“the building inspector shall issue a building permit upon the applicant's: (1) completing the building permit application.”
We looked and could not find an official answer yet. Silence is not permission; ask South Portland or Cumberland County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that South Portland publishes no rule on the point, not that none exists. Cumberland County’s page lists the county offices to call.