Aroostook County, Maine
Town of Mapleton is a town in Aroostook County, Maine. Town of Mapleton adopts its own zoning, so inside its limits Town of Mapleton’s rules apply, not the county’s. 8 rules below are quoted from official sources and independently re-checked, most recently on November 3, 2026. Rules for unincorporated land are on the Aroostook County page.
All land and structures inside Mapleton town limits (Aroostook County, Maine)
“the provisions of this ordinance shall govern all land and all structures within the boundaries of the town of mapleton.”
All of Mapleton town
“for the purposes of this ordinance, mapleton is hereby divided into the following zoning districts: 1. single-family residential district r”
Individual lots inside a mobile home park in Mapleton town (not single-family lots)
minimum lot area, lots served by public wastewater disposal: >= 6500 sf · minimum lot width, lots served by public wastewater disposal: >= 50 feet · minimum lot area, lots served by individual subsurface wastewater systems: >= 20000 sf · minimum lot width, lots served by individual subsurface wastewater systems: >= 100 feet · minimum lot area, lots served by central subsurface system: >= 12000 sf · minimum lot width, lots served by central subsurface system: >= 75 feet
“lots served by a central subsurface waste water disposal system approved by the maine department of human resources. a. minimum lot area: 12,000 sf b. minimum lot width: 75 feet c. the overall density of the mobile home park served by a centralized system shall not exceed one dwelling unit per 20,000 square feet of total park area.”
Mobile home park individual lots inside Mapleton town (not single-family lots)
minimum setback from mobile home park individual lot line: >= 15 feet
“structures shall not be located less than 15 feet from any mobile home park individual lot line.”
Relocation of pre-1976 manufactured housing units inside Mapleton town
“units constructed prior to june 15, 1976 that were legally sited in town as of august 4, 1988 may be relocated provided that they meet all other design requirements.”
Temporary elder cottage (ECHO) unit on a lot that already has a single-family dwelling, inside Mapleton town except resource protection districts
“the construction or placement of a temporary "echo" unit on a lot which a single-family dwelling is located may be allowed by a permit granted by the code enforcement officer regardless of a non-conforming lot size and frontage if the following are met:”
Land divisions inside Mapleton town that meet the ordinance definition of subdivision
“the planning board shall review all requests for subdivision approval.”
Zoning and land use permits and applications inside Mapleton town
“each application for a permit shall be accompanied by a non-refundable fee of: a. $5 per thousand-dollar valuation (minimum $300) for each new or relocated commercial structure”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Mapleton or Aroostook County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Mapleton publishes no rule on the point, not that none exists. Aroostook County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Mapleton means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.