Montgomery County, Maryland
Town of Washington Grove is a town in Montgomery County, Maryland. Town of Washington Grove adopts its own zoning, so inside its limits Town of Washington Grove’s rules apply, not the county’s. 17 rules below are quoted from official sources and independently re-checked, most recently on November 3, 2026. Rules for unincorporated land are on the Montgomery County page.
Erecting, structurally altering, moving, demolishing, enclosing a porch, or installing a pool on land inside Washington Grove town.
“every person before commencing work must obtain a building permit from the washington grove planning commission”
Land inside Washington Grove town limits. The town administers its own zoning ordinance (Article VII, Code of Ordinances).
“this article may be cited as the washington grove zoning ordinance”
Zone list for land inside Washington Grove town (RR-1, RR-2, RR-3, RR-4, C-L), with a zoning map referenced.
“9.1 standard method of development in all zones (view the current zoning map here (pdf)) rr-1 zone rr-2 zone rr-3 zone rr-4 zone c-l zone”
RR-1 zone inside Washington Grove town (first rural-residential column of the schedule; the main residential district is assumed to be RR-1 and was not confirmed against section 7.2).
minimum lot area: >= 11250 square feet
“minimum lot size area square feet 11,250 7,500 13,900 18,000 8,750 width at building line 75 50 75 85 50 width at street line 75 25 75 15 50”
“minimum lot size area square feet 11,250 7,500 13,900 18,000 8,750 width at building line 75 50 75 85 50 width at street line 75 25 75 15 50”
“ordinance 2019-18 (pdf), effective february 10, 2020, effected the following changes to the minimum lot size standards for the rr-3 zone in section 9.1: the area is reduced from 20,000 square feet to 13,900 square feet, and the width at building line is reduced from 100 feet to 75 feet.”
“minimum lot size area square feet 11,250 7,500 13,900 18,000 8,750 width at building line 75 50 75 85 50 width at street line 75 25 75 15 50”
RR-1 zone inside Washington Grove town: main building setbacks.
front setback, main building: >= 25 feet · rear setback, main building: >= 15 feet
“main building front 25 25 30 30 none side: sum of two sides 20 20 30 30 20 each side 10 10 15 15 none if side is adjacent to street 15 15 15 15 25 rear 15 10 30 30 25 accessory building front 50 60 50 50 none side if height is over 15 feet 10 4 10 10 none if height is under 15 feet 5 4 5 5 none if side is adjacent to street 15 10 15 15 none rear 7 5 7 7 25”
“main building front 25 25 30 30 none side: sum of two sides 20 20 30 30 20 each side 10 10 15 15 none if side is adjacent to street 15 15 15 15 25 rear 15 10 30 30 25”
RR-1 zone inside Washington Grove town: maximum ground covered by buildings.
maximum building ground coverage: <= 25 percent of lot
“maximum ground covered by buildings all buildings (as % of lot) 25 40 25 25 70 accessory buildings (as % of rear yard) 25 30 25 25 none”
“maximum ground covered by buildings all buildings (as % of lot) 25 40 25 25 70 accessory buildings (as % of rear yard) 25 30 25 25 none”
RR-1 zone inside Washington Grove town: main building height.
main building maximum height: <= 30 feet
“maximum height main building stories 2.5 2 2.5 2.5 2 feet 30 30 30 30 40 accessory building stories 1.5 1.5 1.5 1.5 1.5 feet 20 20 20 20 20”
“maximum height main building stories 2.5 2 2.5 2.5 2 feet 30 30 30 30 40 accessory building stories 1.5 1.5 1.5 1.5 1.5 feet 20 20 20 20 20”
Accessory dwelling units on land inside Washington Grove town.
“ordinance 2023-08 (pdf), effective april 25, 2024, updated a number of sections to permit the construction and rental of accessory dwelling units (adus).”
New buildings inside Washington Grove town: the plan must show provisions for connection to the WSSC sewer system.
“every plan for the erection of a new building must show thereon suitable provisions for connection to the washington suburban sanitary commission sewer system.”
Building permit applications for land inside Washington Grove town.
“applications for building permits must be submitted to the washington grove planning commission for approval.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Washington Grove or Montgomery County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Washington Grove publishes no rule on the point, not that none exists. Montgomery County’s page lists the county offices to call.