Montgomery County, Maryland
Town of Brookeville is a town in Montgomery County, Maryland. Town of Brookeville adopts its own zoning, so inside its limits Town of Brookeville’s rules apply, not the county’s. 13 rules below are quoted from official sources and independently re-checked, most recently on November 3, 2026. Rules for unincorporated land are on the Montgomery County page.
All land inside Brookeville town limits; the town administers its own zoning ordinance
“this ordinance applies to all real property in the town of brookeville, maryland.”
Land inside Brookeville town limits
“the town is hereby divided into the following zones: hvr - historic village residential hvc - historic village commercial”
HVR (Historic Village Residential) district only, single-family detached dwellings inside Brookeville town
minimum lot area: >= 10000 square feet
“1. minimum lot area:10,000 square feet 2. maximum building height”
HVR (Historic Village Residential) district only, main buildings inside Brookeville town
side yard setback: 8 feet · front yard setback: 15 feet · rear yard setback: 40 feet
“3. setbacks: a. main buildings: i. side yard - eight (8) feet. ii. front yard - fifteen (15) feet. iii. rear yard - forty (40) feet.”
“(2)setbacks: all setbacks must demonstrate a compatible relationship to adjacent existing and proposed development.”
HVR (Historic Village Residential) district only, inside Brookeville town
maximum building height, single-family dwelling: <= 35 feet · maximum building height, accessory building: <= 35 feet (or not taller than the primary structure)
“2. maximum building height: a) single-family dwelling: 35 feet b) accessory building: 35 feet, or not taller than the primary structure.”
“(1)building height: normally, 25 feet. at the time of site plan review, this may be increased to 35 feet.”
Accessory dwelling units on lots in Brookeville town with an existing single-family detached dwelling
adult occupants limit: <= 2 persons
“an accessory dwelling unit is permitted on any lot with an existing single-family detached dwelling unit, provided it meets all other standards for accessory structures.”
New residential development inside Brookeville town
“all applications for new residential development must be submitted for subdivision and site plan review and approval by the planning commission on forms provided by the town.”
Building permit applications to the Town of Brookeville
permit fee, new buildings or additions: 0.5 USD per gross square foot (minimum filing fee $75; excludes unfinished basements and unfinished attic space) · minimum filing fee, new buildings or additions: >= 75 USD · fee, other items: 25 USD (non-refundable; not for new buildings or additions)
“for all new buildings or additions, the permit fee is based on a rate of $.50 per gross square foot of the building (not including unfinished basements and unfinished attic space) with a $75 minimum filing fee.”
Building permit applications to the Town of Brookeville, reviewed by the Brookeville Planning Commission (BPC)
permit validity: 24 months (from BPC approval)
“the deadline to submit a building permit application for approval by the brookeville planning commission is ten (10) business days before a bpc meeting.”
Town of Brookeville does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Construction inside Brookeville town, as stated in the town's building permit application (Montgomery County codes apply)
“construction methods must conform to all montgomery county codes and are subject to inspection by the county.”
Construction inside Brookeville town, per the town's building permit application
“construction methods must conform to all montgomery county codes and are subject to inspection by the county.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Brookeville or Montgomery County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Brookeville publishes no rule on the point, not that none exists. Montgomery County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Brookeville means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.