Worcester County, Massachusetts
Town of New Braintree is a town in Worcester County, Massachusetts. Town of New Braintree adopts its own zoning, so inside its limits Town of New Braintree’s rules apply, not the county’s. 11 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Worcester County page.
Construction, reconstruction, alteration, repair, moving, demolition, specified equipment work, and changes of use or occupancy inside New Braintree town limits.
“Applicability: Building permits are required for any construction, reconstruction, alteration, repair, moving or demolition of a building or structure; or change of use and occupancy; or for the installation or alteration of any equipment which is regulated under the provisions of the Massachusetts State Building Code.”
Work under a New Braintree building permit.
inspection-notice: >= 48 business hours
“Required Inspections: The building permit will indicate specific points in the construction process at which inspections must be made. No work should proceed until each of these phases has been inspected and approved.”
New construction or a change of use inside New Braintree town limits.
“Occupancy: Upon completion of work for new construction or change of use, a Certificate of Use and Occupancy must be obtained by the applicant before the building can be occupied.”
Land inside New Braintree town limits.
“This Zoning By-Law is adopted by the Town of New Braintree to promote the health, safety, convenience and general welfare of its inhabitants, to protect the community, to encourage the most appropriate use of land and to promote sound growth.”
All land inside New Braintree town limits.
district: Agricultural and Rural - Residential District (entire Town of New Braintree)
“The entire Town of New Braintree is hereby designated as the Agricultural and Rural - Residential District.”
Camper-unit or trailer occupancy in a commercial camping or recreation area inside New Braintree town limits.
minimum area: >= 75 acres (commercial camping or recreation area under single ownership) · maximum recreational occupancy: <= 180 days per 12-month period (supervisory or maintenance personnel)
“Commercial camping or recreation area of 75 acres or more, under single ownership, for cabins, tents, camper units or trailers, for seasonal or part-time occupancy only.”
Commercial camping or recreation areas inside New Braintree town limits.
minimum area: >= 75 acres (commercial camping or recreation area under single ownership) · maximum recreational occupancy: <= 180 days per 12-month period (supervisory or maintenance personnel)
“Under the provisions of this section the sites, facilities or buildings which are used or occupied for a maximum of 180 days during any 12-month period for recreational purposes shall not be subject to the lot area and yard requirements which pertain to other residential use.”
Subdivision of land inside New Braintree town limits.
“The New Braintree Planning Board are elected officials responsible for issuing Gravel (Earth Removal) Permits; Subdivisions of Land; Approval Not Required Plans; Adult Marijuana Establishment Special Permits; Solar Energy Facilities; and long range planning for the Town.”
Building-permit applications inside New Braintree town limits.
building-official review: <= 30 days (after filing; application is not filed until required department approvals and documents are returned to Inspections)
“The Massachusetts State Building Code (780 CMR) provides that the building official shall review an application within 30 days of filing. For purpose of this section, the application is not considered to have been filed until other departments have approved it, if required, and it is returned to the Inspections Department for plan review with all required documents.”
Town of New Braintree does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Building work inside New Braintree town limits regulated by the Massachusetts State Building Code.
code: 780 CMR
“Applicability: Building permits are required for any construction, reconstruction, alteration, repair, moving or demolition of a building or structure; or change of use and occupancy; or for the installation or alteration of any equipment which is regulated under the provisions of the Massachusetts State Building Code.”
Agricultural and Rural-Residential District, which covers the entire Town of New Braintree.
front yard: >= 50 feet (measured from street line) · side yard: >= 30 feet (fences excepted) · rear yard: >= 30 feet (fences excepted)
“The front yard shall be at least 50 feet measured from the street line and there shall be side and rear yards of at least 30 feet between any building or structure except fences and the lot line.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of New Braintree or Worcester County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of New Braintree publishes no rule on the point, not that none exists. Worcester County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of New Braintree means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.