Worcester County, Massachusetts
Gardner is a city in Worcester County, Massachusetts. Gardner adopts its own zoning, so inside its limits Gardner’s rules apply, not the county’s. 5 rules below are quoted from official sources and independently re-checked, most recently on October 23, 2026. Rules for unincorporated land are on the Worcester County page.
Land inside Gardner city limits: the City of Gardner's own Chapter 675 (Zoning) applies.
“chapter 675 zoning (§ 675-110 – § 675-1180)”
Zoning districts inside Gardner city limits; the full district list and map were not retrieved.
“only lots in the gr3, com1 and sfr1 districts shall be considered for infill development.”
Residential lots inside Gardner city limits; numeric minimum lot area by district (including SFR1, RR2 and GR3) is in the Chapter 675 table not retrieved in this run.
lot area exception threshold: > 5000 square feet (§ 675-610(b) exception for pre-existing recorded residential lots) · lot frontage exception threshold: >= 50 feet (§ 675-610(b) exception for pre-existing recorded residential lots)
“a dwelling, building or any structure hereafter erected in any district shall not be located on a lot having less than the minimum requirements.”
Yard (setback) requirements for buildings inside Gardner city limits, by district; the numeric yard values are in the § 675-620 schedule not retrieved in this run.
“all minimum yard dimensions required in the following schedule are to be measured from the relevant lot line.”
Building height limits inside Gardner city limits, by district; numeric heights are in the § 675-620 schedule not retrieved in this run.
“the limitation of height of buildings and structures in the following schedule shall not apply in any district to chimneys, ventilators, towers, spires, or other ornamental features of buildings, which features are in no way used for living purposes.”
We looked and could not find an official answer yet. Silence is not permission; ask Gardner or Worcester County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Gardner publishes no rule on the point, not that none exists. Worcester County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Gardner means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.