Norfolk County, Massachusetts
Town of Wellesley is a town in Norfolk County, Massachusetts. Town of Wellesley adopts its own zoning, so inside its limits Town of Wellesley’s rules apply, not the county’s. 9 rules below are quoted from official sources and independently re-checked, most recently on November 3, 2026. Rules for unincorporated land are on the Norfolk County page.
Construction inside Wellesley town limits, issued by the Wellesley building department
“most, but not all construction projects will require a building permit”
Land inside Wellesley town limits (Norfolk County, MA): the town's own Zoning Bylaw adopted under M.G.L. c. 40A
“the zoning bylaw of the town of wellesley, massachusetts, is enacted in accordance with the provisions of the zoning act”
Zoning districts and zoning map for land inside Wellesley town
“this page provides the town of wellesley zoning bylaw and zoning map.”
Lots in the 10,000 square foot area regulation district inside Wellesley town (main single-family residential district), lots recorded after April 8, 1997
front yard depth (street setback): 30 ft (asterisk footnote applies) · side yard width (side line setback): 20 ft · rear yard depth (rear line setback): 18 ft
“minimum side yard width (side line setback) 20 ft. 20 ft. 20 ft. 30 ft. 40 ft. minimum rear yard depth (rear line setback) 18 ft. 20 ft. 20 ft. 30 ft 40 ft.”
“minimum side yard width (side line setback) 20 ft. 20 ft. 20 ft. 30 ft. 40 ft. minimum rear yard depth (rear line setback) 18 ft. 20 ft. 20 ft. 30 ft 40 ft.”
Accessory dwelling units on residential lots inside Wellesley town under Zoning Bylaw section 5.13
owner occupancy: >= 184 days per calendar year
“accessory dwelling units are an allowed accessory use when they meet the requirements of section 5.13 of the zoning bylaw.”
Building permit fees inside Wellesley town
“building permit application forms building permit fee schedule (pdf) building permit faqs (pdf) list of required inspections (pdf)”
Building permit applications for new construction inside Wellesley town
new construction permit review time: 10 to 14 days (generally)
“for new construction, review of a permit application generally takes ten (10) to fourteen (14) days.”
Town of Wellesley does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Building construction inside Wellesley town, administered by the Wellesley building department under the Massachusetts state building code
“all building and construction activity in the commonwealth is regulated by the ma state building code (780 cmr).”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Wellesley or Norfolk County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Wellesley publishes no rule on the point, not that none exists. Norfolk County’s page lists the county offices to call.