Town of Shirley is a town in Middlesex County, Massachusetts. Town of Shirley adopts its own zoning, so inside its limits Town of Shirley’s rules apply, not the county’s. Septic permits inside Town of Shirley come from Town of Shirley. 12 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Middlesex County page.
Buildings and structures inside Shirley town limits.
“No building or structure shall be used, constructed, relocated, added to or demolished without a permit having been issued by the Building Inspector.”
Land inside Shirley town limits.
“This Bylaw is adopted in accordance with and pursuant to the provisions of M.G.L., c.40A, as amended. This Bylaw shall be known and may be cited as the Zoning Bylaw of the Town of Shirley, Massachusetts.”
Structures inside Shirley zoning districts.
“Minimum Yard Setbacks: 1. Front: 40 feet 2. Side: 17 feet 3. Opposite Side: 23 feet 4. Rear: 50 feet”
Lots inside Shirley zoning districts.
“Where the following terms appear in the dimensional regulations for any district, they shall be interpreted according to the following standards.”
Structures inside Shirley zoning districts.
“Height shall be measured as the vertical distance from the average ground elevation around the exterior walls of the structure to the highest point of the top story in the case of a flat roof, and to the mean height between the plate and the ridge in the case of a pitched roof, provided that the ridge of a pitched roof shall not be higher than 130% of the maximum height for the district.”
Protected-use accessory dwelling units in Rural Residential, R-1, R-2, R-3, North Shirley Village Business, Mixed-Use, and Great Road Mixed-Use districts.
maximum gross floor area: <= 900 square feet (Or one-half of the principal dwelling gross floor area, whichever is smaller.)
“Protected Use Accessory Dwelling Units are allowed by right, subject to the provisions of this section, in the following Zoning Districts in the Town of Shirley: Rural Residential, R-1, R-2, R-3, North Shirley Village Business District, Mixed-Use District, and the Great Road Mixed-Use District.”
Private on-site sanitation for buildings in the Shirley Sewer Service Area.
“may elect to connect the building to the Sewer System or to maintain a private on-site subsurface sewage disposal or septic system which complies with the requirements of Title 5 of the State Environmental Code and the requirements of the Board of Health, but only for so long as the system continues to comply with such requirements.”
Buildings within the Shirley Sewer Service Area inside Shirley town limits.
connection deadline after availability: 2 years (Except as provided in Article XXVI § 5(A)(ii).) · optional-connection distance: > 300 feet (Measured from the sideline of a street or right-of-way in which the sewer system is constructed.)
“Except as provided in Subparagraph ii, connect said building to the Sewer System within two (2) years of the date when said Sewer System is available for such connection.”
Agriculture in all Shirley zoning districts.
land area: > 5 acres (Agriculture as defined in M.G.L. c. 128, § 1A.)
“Agriculture as defined in M.G.L. c.128, Section 1A, is allowed as a matter of right on more than five acres of land.”
Subdivision and low-impact development inside Shirley town limits.
“Approval of a LID Definitive Plan by the Planning Board is required following approval of the LID Concept Special Permit.”
All structural and non-structural development in Shirley's Flood Plain District.
“All development in the district, including structural and non-structural activities, whether permitted by right or by special permit, must be in compliance with Chapter 131, Section 40 of the Massachusetts General Laws and with the following:”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Shirley or Middlesex County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Shirley publishes no rule on the point, not that none exists. Middlesex County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Shirley means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.