Middlesex County, Massachusetts
Town of Holliston is a town in Middlesex County, Massachusetts. Town of Holliston adopts its own zoning, so inside its limits Town of Holliston’s rules apply, not the county’s. Septic permits inside Town of Holliston come from Town of Holliston. 11 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Middlesex County page.
Land inside Holliston town limits.
“The purpose of this zoning by-law is to promote the general health, safety, convenience, morals and welfare of the inhabitants of Holliston under the provisions of General Laws, Chapter 40A (the Zoning Act);”
Land inside Holliston town limits.
“AR-1 Agricultural-Residential District A”
Agricultural-Residential District A inside Holliston town limits.
minimum-lot-area: >= 80000 square feet
“District | Area (s.f.) | Frontage (feet) | Lot Depth (feet) | Front (feet) | Side (feet) | Rear (feet) | Stories | Feet | Max. % Coverage: Buildings, Structures & Accessory Buildings | Floor Area Ratio (FAR) Ag-Res Dist. A | 80,000 | 225 | 300 | 40 | 40 | 40 | 2 1/2 | 35 | 20 | --”
Accessory dwelling units in single-family residential districts inside Holliston town limits.
short-term-rental-minimum: >= 31 days (ADUs may not be rented for a shorter period.)
“The intent and purpose of this section is to permit accessory dwelling units in single family residential districts subject to the standards and procedures hereinafter set forth. It is also the intent to assure that the single-family character of the neighborhood will be maintained and that the accessory unit remain subordinate to the principal use of the living quarters. ADUs may not be used as Short-Term Rentals, as such terms is defined in G.L. c. 64G, s. 1 or otherwise rented for a period shorter than thirty-one (31) days.”
Water-system connection work inside Holliston town limits.
“Permits Issued: System Development/Connection”
Residential and industrial subdivisions inside Holliston town limits.
“Residential and Industrial Subdivisions per MGL c. 41”
Proposed construction or development in Holliston's Floodplain Overlay District.
“The Town of Holliston requires a permit for all proposed construction or other development in the floodplain overlay district, including new construction or changes to existing buildings, placement of manufactured homes, placement of agricultural facilities, fences, sheds, storage facilities or drilling, mining, paving and any other development that might increase flooding or adversely impact flood risks to other properties.”
Accessory dwelling units inside Holliston town limits.
minimum-rental-period: >= 31 days (Applies to ADUs.)
“The intent and purpose of this section is to permit accessory dwelling units in single family residential districts subject to the standards and procedures hereinafter set forth. It is also the intent to assure that the single-family character of the neighborhood will be maintained and that the accessory unit remain subordinate to the principal use of the living quarters. ADUs may not be used as Short-Term Rentals, as such terms is defined in G.L. c. 64G, s. 1 or otherwise rented for a period shorter than thirty-one (31) days.”
Building and electrical permit applications inside Holliston town limits.
building-fee: per 10 USD per 1000 USD work value (Rounded up; $75 minimum.) · electrical-fee: per 10 USD per 1000 USD work value (Rounded up; $75 minimum.)
“Building $10/$1000 rounded up work value ($75 minimum)”
Building permit applications inside Holliston town limits.
“copy of your license, workers compensation insurance and liability insurance”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Holliston or Middlesex County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Holliston publishes no rule on the point, not that none exists. Middlesex County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Holliston means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.