Town of Bedford is a town in Middlesex County, Massachusetts. Town of Bedford adopts its own zoning, so inside its limits Town of Bedford’s rules apply, not the county’s. Septic permits inside Town of Bedford come from Town of Bedford. 17 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Middlesex County page.

Answers from the rulebook for Town of Bedford

Town of Bedford’s own rules

  • Building permitRequired

    Construction, alteration and change of use of buildings inside Bedford town, including new single-family dwellings.

    • Building permit is issued by the Bedford building official; a new dwelling also needs electrical and plumbing/gas permits.
    • Work may proceed only after the permit is issued.
    “Section 105.1 of the MA Building Code, 780 CMR, requires a building permit for any construction, reconstruction, alteration, repair, removal or demolition of a building or structure.”
  • InspectionsRequired

    New single-family dwellings built under a Bedford building permit.

    • Foundation inspections are made by the building official during installation.
    • Tenant or occupancy inspections by the building inspector are also described in the town FAQ for business spaces.
    “during the installation of the foundation required inspections will be made by the building official to ensure code compliance.”
  • Local zoningPresent (with conditions)

    All land, buildings and uses inside Bedford town's limits. Bedford adopts and administers its own zoning bylaw.

    • The bylaw regulates the construction, height, size, lot area and use of land in the town (section 1.3).
    • Section 1.4 applies the bylaw to all buildings, structures and premises in the town after its effective date.
    • The record uses the Zoning Bylaw as approved by Town Meeting March 25, 2025; later amendments were not checked.
    “The construction, repair, alteration, reconstruction, height, number of stories, and size of buildings and structures, the size and width of lots, the percentage of lot area that may be occupied, the size of yards, courts, and other open spaces, the density of population, and the location, intensity, and use of buildings, structures, and land in the Town are regulated by this Bylaw.”
  • Zoning districtsPublished

    Zoning districts in Bedford town

    • Districts named in Table 5.2-1 are Residence R, Residence A, Residence B, Residence C and Residence D.
    • Zoning map was not opened in this run.
    “For the purpose of this Bylaw, the Town is divided into the following classes of zoning districts: Residential Districts Residence R Residence A Residence B Residence C Residence D”
  • Minimum lot sizeDistrict specific (with conditions)

    Residential districts Residence R, A, B, C and D in Bedford town; the minimum lot area by district is set in Appendix B, Table 5.2-1.

    • District numbers were not legible in the text extraction and are not recorded here; see followup.
    • Lot area excludes land more than 500 feet from frontage in Residence R, A, B and C districts (section 5.3.a).
    “RESIDENCE R Standard 60,000 [...] RESIDENCE A Standard 40,000 [...] RESIDENCE B Standard 30,000 [...] RESIDENCE C Standard 25,000 [...] RESIDENCE D 10 acres”
  • SetbacksDistrict specific (with conditions)

    Residential districts Residence R, A, B, C and D in Bedford town; front, side and rear yard setbacks by district are in Appendix B, Table 5.2-1.

    • Accessory buildings in residential districts: 10 feet from a side line and 10 feet from the rear lot line (section 4.4), subject to the right-of-way rule.
    • District numbers not extracted; see followup.
    “MINIMUM FRONT YARD IN FEET MINIMUM SIDE YARD IN FEET MINIMUM REAR YARD IN FEET”
  • Lot coverageDistrict specific (with conditions)

    Residential districts Residence R, A, B, C and D in Bedford town; maximum lot coverage by district is in Appendix B, Table 5.2-1.

    • Principal and accessory structures together may not exceed the maximum coverage (section 5.2.j).
    • District percentages not extracted; see followup.
    “the minimum lot area, frontage, lot width, setback, yard and corner clearance requirements, maximum lot coverage, minimum lot landscaped and height, and floor area ratio (far) shall be as shown in appendix b: table 5.2-1, dimensional regulations.”
  • Building heightDistrict specific (with conditions)

    Residential districts Residence R, A, B, C and D in Bedford town; maximum height by district is in Appendix B, Table 5.2-1.

    • Planned residential developments have a 35-foot maximum height (section 8.7).
    • District heights not extracted; see followup.
    “the minimum lot area, frontage, lot width, setback, yard and corner clearance requirements, maximum lot coverage, minimum lot landscaped and height, and floor area ratio (far) shall be as shown in appendix b: table 5.2-1, dimensional regulations.”
  • Camping on your landProhibited

    Trailer camps and mobile home parks in all districts of Bedford town.

    • Section 4.2 bans trailer camps as a use in all districts.
    • The Zoning Bylaw's prohibition does not address tent camping; tent camping was not researched.
    • Section 4.4.c.2 is an exception referenced in the same list and was not reviewed.
    “In all districts, the following are prohibited: [...] 7. Trailer camp 8. Mobile home park”
  • Who permits septicLocal (with conditions)

    New single-family dwelling inside Bedford town served by an on-site septic system; the Bedford Board of Health reviews and signs off.

    • The state Title 5 standard (310 CMR 15.000) is referenced in statewide guidance but was not opened in this run.
    • Board of Health sign-off is entered on the building permit application before submission.
    “board of health review/sign-off is required when the new dwelling will be tied into a properly designed septic system and/or will be using an artisan well as its primary water supply.”
  • Well permitRequired

    New single-family dwelling inside Bedford town using an artisan (private) well as its primary water supply.

    • Board of Health must initial the building permit application.
    • A separate well drilling permit was not verified in this run.
    “board of health review/sign-off is required when the new dwelling will be tied into a properly designed septic system and/or will be using an artisan well as its primary water supply.”
  • Mandatory utility hookupSewer (with conditions)

    New single-family dwelling inside Bedford town where the town public sewer is available.

    • Applies only where the town's public sewer system is available.
    • The Board of Health is mandated to require the tie-in.
    “if the town's public sewer system is available then the board of health is mandated to require the dwelling to be tied into the public sewer system”
    One more reviewed finding on this topic
    • Conditional — New single-family dwelling inside Bedford town that will use the town water supply.
      “department of public works review/sign-off is required when the new dwelling will be tied into the town's public sewer system and will be using the town's water supply.”
  • Building in a floodplainLimited

    New single-family dwelling site plan in Bedford town where the lot includes floodplain.

    • The plot plan must show flood plain delineations and grade elevations to ensure compliance with section 5401.3 of the MA building code.
    • The zoning bylaw includes a floodplain overlay district; its development limits were not extracted.
    “the plot plan will also be required to show any and all easements, covenants, deed restrictions, flood plain deliniations and grade elevations to ensure compliance with section 5401.3 of the ma building code.”
  • Short-term rentalsLimited

    Short-term rental of any dwelling unit inside Bedford town.

    • Allowed only if the Zoning Board of Appeals grants a special permit.
    • Short-term rental is defined by reference to G.L. c. 64G.
    • Additional limits (night caps, registration) were not verified.
    “Any dwelling unit may only be offered for short-term rental as defined under G.L. c. 64G if authorized by the Zoning Board of Appeals by special permit.”
  • Permit processPublished (with conditions)

    New single-family dwelling building permit in Bedford town

    • Review requires zoning, conservation, historic district (if applicable), DPW, Board of Health, and fire sign-offs before the permit issues.
    • Plan review for a new single-family dwelling is typically 14 to 21 days; a foundation permit is issued first, then a certified as-built plot plan is required.
    • Plot plan must be stamped by a registered land surveyor or civil engineer at a minimum scale of 1 inch to 20 feet.

    typical plan review time: 14 days (up to 21 days)

    “a building permit for a new dwelling is issued in a two-phase process.”

Rules another office applies inside Town of Bedford

Town of Bedford does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Building code adoptedAdopted (with conditions)

    Massachusetts State Building Code (780 CMR) as enforced by Bedford's building official for work inside Bedford town.

    • The town building official enforces 780 CMR for work in Bedford, per the town's permit guidance.
    • Town-level code amendments were not checked.
    “to ensure compliance with the massachusetts building code, 780 cmr and/or any other applicable agency”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Town of Bedford or Middlesex County directly.

  • Minimum dwelling size — Minimum dwelling floor area inside Bedford town
  • Tiny homes — Tiny home used as a full-time dwelling inside Bedford town
  • Septic inspection — Septic system inspection inside Bedford town
  • Off-grid sanitation — Off-grid sanitation (composting, privy, or other non-septic) inside Bedford town
  • Agricultural exemption — Agricultural use exempt from Bedford zoning
3 more unanswered
  • Subdividing land
  • Driveway access
  • Permit fees

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Town of Bedford publishes no rule on the point, not that none exists. Middlesex County’s page lists the county offices to call.

Off-grid gear

Going off-grid in Town of Bedford means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

← All of Middlesex County: county rules, score and offices