Bolthole Index

Hampden County, Massachusetts

Zoning, building permits and septic rules in Town of Montgomery, Massachusetts

Town of Montgomery is a town in Hampden County, Massachusetts. Town of Montgomery adopts its own zoning, so inside its limits Town of Montgomery’s rules apply, not the county’s. Septic permits inside Town of Montgomery come from Town of Montgomery. 9 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Hampden County page.

Answers from the rulebook for Town of Montgomery

Town of Montgomery’s own rules

  • Building permitRequired

    Construction and work covered by the Montgomery town building inspector's permit process, inside Montgomery town limits.

    • Permits are filed online through PermitEyes, with paper filing for some projects that need technical review.
    • The town's building permit filing requirements document was linked but not opened; the thresholds for which work needs a permit were not verified.
    “New Home • Contact Conservation Commission regarding land use issues • Contact Planning Board to inquire about any restrictions • Contact Board of Health for well and septic system requirements • Contact Highway Department for “Driveway/Curb cut Permit” • Contact Fire Department for fire and carbon monoxide requirements • 2 Set of detailed plans • Completed Building application with Homeowner signatures”
  • InspectionsRequired

    Work under a Montgomery town building permit, inside Montgomery town limits.

    • Inspections are scheduled by emailing the inspector directly.
    • The inspectors are part-time, so there may be extended waits for inspections.
    • The permit must be kept on site with signature boxes for inspectors.
    “All inspections must be scheduled by emailing the inspector directly. Please be aware that our inspectors are part-time and there may be extended time periods for inspections.”
  • Local zoningPresent (with conditions)

    Land inside Montgomery town limits, MA. The town's Planning Board holds hearings on amendments to the Montgomery zoning by-laws.

    • The notice shows the town has zoning by-laws that the Planning Board amends. The by-law text itself was not retrieved, so no district, use, or dimensional rule is stated here.
    • Specific zoning-by-law text is not on the notice page; the notice links to no bylaw document.
    “The Montgomery Planning Board will hold an Open Hearing December 10, 2024, at 7:30PM at the Montgomery Town Hall addressing a change to the Right to Farm By-Law concerning swine, and an amendment to the Montgomery Zoning By-laws concerning ‘Outbuildings’: definition and setbacks.”
  • Who permits septicLocal (with conditions)

    Individual septic systems inside Montgomery town limits.

    • The town Board of Health has primary responsibility for individual septic systems.
    • State Title 5 (310 CMR 15.000) also applies to on-site systems, but the Mass.gov text was not retrieved, so no state claim is made here.
    “We have a primary responsibility over private wells, individual septic systems and substandard housing.”
  • Well permitRequired

    Private wells inside Montgomery town limits, administered by the Board of Health.

    • The Board of Health page lists well construction application, well pumping test, water quality report, and application for water certification forms.
    • The text of the well permitting regulations was not opened.
    “A Massachusetts Certified Well Driller shall obtain a permit from the Board of Health prior to the commencement of construction of a private well.”
  • Driveway accessRequired

    Opening a new curb cut or driveway inside Montgomery town limits.

    • The Building Inspector page lists an application for curb cut/driveway opening; the form text and approval criteria were not opened.
    “A Curb Cut/Driveway Opening Permit is required to provide a safer alignment for new or relocated driveway openings; offer protection to infrastructure in the Town right-of-way including public shade trees; and ensure that the opening is constructed to Town specifications.”
  • Permit feesPublished

    Building permits inside Montgomery town limits.

    • The building permit fee schedule is linked from the Building Inspector page, but its amounts were not opened.
    • Permit fees are payable after the fee is set and before permit issuance.
    “documents building permit filing requirements building permit fees building permit sign-off process application for curb cut/driveway opening”
  • Permit processPublished

    Building permit applications inside Montgomery town limits.

    • Applications go through PermitEyes; other departments such as health, conservation, and fire may need to sign off before the inspector reviews.
    • The inspector may request more documents via the chat function.
    • The fee is set and paid before issuance.
    “The first tab is the Sign Off tab. Prior to the inspector reviewing your application, the application may need to be signed off by another department (i.e. Conservation, Health, Fire, etc.). Here you will be able to monitor each department’s approvals, denials, comments, etc. and respond accordingly, if required. The application cannot move forward for review until all applicable departments have signed off as approved.”

Rules another office applies inside Town of Montgomery

Town of Montgomery does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Building code adoptedAdopted (with conditions)

    Construction inside Montgomery town limits, MA, under the Massachusetts State Building Code (780 CMR).

    • The tenth edition became first effective on October 11, 2024, with a concurrency period that was extended.
    • The concurrency period ends June 30, 2025, after which the tenth edition is the only building code in effect.
    • Montgomery town's own code adoption was not separately verified; the state code is the rule that applies.
    “the tenth edition building code became first effective on october 11, 2024 with a concurrency period, during which either the ninth or tenth edition building codes could be utilized.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Town of Montgomery or Hampden County directly.

  • Owner-builder exemption — Owner-builder exemption inside Montgomery town limits.
  • Certificate of occupancy — Certificate of occupancy for new homes inside Montgomery town limits.
  • Zoning districts — Zoning district map and list for Montgomery town.
  • Minimum dwelling size — Minimum dwelling size inside Montgomery town limits.
  • Minimum lot size — Minimum lot size for the single-family residential district inside Montgomery town limits.
16 more unanswered
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Mandatory utility hookup
  • Agricultural exemption
  • Subdividing land
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Town of Montgomery publishes no rule on the point, not that none exists. Hampden County’s page lists the county offices to call.

Off-grid gear

Going off-grid in Town of Montgomery means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

← All of Hampden County: county rules, score and offices