Building permits, zoning and septic in the Town of Holland, MA

The Town of Holland in Hampden County, Massachusetts requires a building permit from the Building Inspector before a building is built, rebuilt, converted in use or added to.1 Holland administers local zoning through town offices, while septic review starts with the town Board of Health under statewide sanitary requirements.234 Trailer living is prohibited except for a narrow manufactured-home exception while rebuilding a destroyed residence.5

At a glance

Building permits
Required from the town Building Inspector for construction, rebuilding, use conversion and additions1
Zoning approval
Town-level zoning; Planning Board handles site-plan review and serves as a special-permit authority2
Septic review
Town Board of Health contact for perc tests and septic inspections; statewide sanitary requirements apply34
RV and trailer living
Living quarters prohibited; manufactured-home rebuilding exception lasts no more than 12 months5
Owner-builder
State homeowner registration exemption does not waive building permits or inspections6
Private wells
State law allows town well-site permits; ask the Board of Health for Holland’s requirements73

Who to call

Building permits

Town of Holland Building Department

Town building-permit applications, construction review and inspection contacts

(413) 245-7108 ext. 113

[email protected]

27 sturbridge rd. holland , ma 01521

Planning & zoning

Town of Holland Planning Board

Municipal planning, subdivision review, zoning amendments, special permits and site-plan review

(413) 245-7108 x117

[email protected]

27 sturbridge road

Septic permits

Town of Holland Board of Health

Local health review, perc-test and septic-inspection contacts, and parcel documentation for building applications

(413) 245-7108 ext. 112

[email protected]

27 sturbridge road holland , ma 01521

Contact details are copied from each office’s official page and were checked against it on October 12, 2026.

Off-grid gear

Going off-grid in Town of Holland means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in the Town of Holland, MA?

Holland requires a building permit from the Building Inspector before constructing, rebuilding, converting the use of or adding to a building.1 When another town approval is required, the approval request must include scaled drawings.1 Massachusetts local building inspectors enforce the statewide building code within their municipalities.8

A homeowner registration exemption under state law does not remove the need for Holland building permits, inspections or other applicable licensing requirements.6 Ask the Holland Building Department which inspections and occupancy documentation your particular project will require before setting a construction schedule.9

Who issues building permits in the Town of Holland, and how do you apply?

The Holland Building Inspector issues the town building permit, and the Building Department offers application reviews by appointment.19 Deliver or mail Holland building applications to the town office; the department does not accept applications online or by email.9 Online payment is available, but paying online does not substitute for delivering the application.9

Electrical, plumbing or gas work requires the corresponding additional permit applications and fees alongside the building permit.9 Issued building permits can be picked up at Town Hall after notification, or mailed when the applicant supplies a self-addressed, stamped envelope.9 Contact the department through the verified phone or email listed above to arrange review.9

Does the Town of Holland have zoning, lot-size and setback rules?

Holland has municipal zoning, and the Planning Board drafts zoning amendments, handles site-plan review and serves as a special-permit granting authority.2 Massachusetts requires municipalities to identify zoning districts on a map and make their zoning bylaws available for inspection.10 Ask the Holland Planning Board to identify the parcel’s district and applicable dimensional table before settling on a house location.2

Holland’s published use table lists accessory dwelling units as special-permit uses in AR, R, GA, B and RB, and excludes them in C.11 State law separately protects qualifying accessory dwelling units in single-family residential zoning districts, subject to allowed regulations.12 Ask the Planning Board to reconcile the published table with that statewide protection before choosing an ADU approval route.21112

How do septic permits work inside the Town of Holland?

Start Holland septic questions with the town Board of Health, whose page provides a scheduling contact for perc tests and septic-system inspections.3 Massachusetts sanitary requirements apply statewide, with local health officers or boards administering individual sewage-disposal permits where authorized.4 Ask Holland’s Board of Health about the site evaluation, system design and local approval needed for your proposed dwelling.34

The Holland Board of Health requires a true attested copy of the assessors’ parcel record for a complete building-permit application.3 Deed restrictions must be recorded, with a copy supplied to the Board of Health and assessors before any permit is granted.3 Confirm those records early rather than waiting until the building application is ready.3

Can you live in an RV or tiny home on land in the Town of Holland?

Holland prohibits using a house trailer, mobile home or trailer containing sleeping and eating accommodations as living quarters on a parcel, except for the specified manufactured-home rebuilding exception.5 Holland allows no more than 1 such unit on a parcel.5 The exception allows a manufactured home at the site of a residence destroyed by fire or another natural holocaust for no more than 12 months while rebuilding.13 That exception does not authorize ordinary trailer living while building a first home on vacant land.5

We could not confirm a Holland-specific tiny-home occupancy rule; ask the Building Department and Planning Board to review the proposed structure and use before buying it.92

What are the steps to building a home in the Town of Holland?

  1. Ask the Planning Board to identify the parcel’s zoning district, applicable site-plan review and any special-permit approval.2
  2. Contact the Board of Health for septic review, perc-test scheduling and the required attested assessor record and recorded deed restrictions.3
  3. Prepare the building application and scaled drawings where other town approvals are required, then deliver or mail the application to Holland’s Building Department.19
  4. Apply for any electrical, plumbing or gas permits your work needs, and arrange application review with the Building Department.9
  5. Obtain the building permit before the covered building work begins, and ask the department for the project’s inspection and occupancy requirements.19

What should you check before buying land in the Town of Holland?

For a Holland parcel with a proposed private well, ask the Board of Health whether a local well-site permit is required; Massachusetts law allows municipalities to impose that requirement but does not establish Holland’s answer.73 Ask the same office to review any proposed sanitation alternative because we could not confirm Holland’s rules for non-septic off-grid sanitation.3

For land being divided, Holland has subdivision regulations, and state law requires applicable subdivision plans to go to the town Planning Board for approval before subdivision.1415 For land outside Holland, consult the Hampden County guide for the broader municipal-authority context; zoning rules differ by municipality.16

Watch-outs

  • Holland’s manufactured-home rebuilding exception lasts no more than 12 months and applies to a destroyed residence, so do not plan on trailer occupancy while building on vacant land.5
  • Holland’s published ADU special-permit table and statewide protected-ADU provisions need to be reconciled with the Planning Board for the proposed unit.11122
  • We could not confirm Holland’s district-specific lot sizes, setbacks, height limits or building-permit fee amounts; request the applicable table and fee schedule from the Planning Board and Building Department.29

Sources

  1. Article I: General Permit Requirements - Town of Holland, MA (Town of Holland), quoted and re-checked
  2. Town of Holland Planning Board (town.holland.ma.us)
  3. Town of Holland Board of Health (town.holland.ma.us)
  4. Massachusetts General Laws Chapter 111, Section 31E (Massachusetts statewide rule), quoted and re-checked
  5. Chapter 157: Mobile Homes and House Trailers - Town of Holland, MA (Town of Holland), quoted and re-checked
  6. Massachusetts General Laws, Chapter 142A, Section 14 (Massachusetts statewide rule), quoted and re-checked
  7. Massachusetts General Laws Chapter 21G, Section 20 (Massachusetts statewide rule), quoted and re-checked
  8. Massachusetts General Laws, Chapter 143, Section 3A: Enforcement of state building code (Massachusetts statewide rule), quoted and re-checked
  9. Town of Holland Building Department (town.holland.ma.us)
  10. General Law, Chapter 40A, Section 4 (Massachusetts statewide rule), quoted and re-checked
  11. Article IV: Use Regulations - Town of Holland, MA (Town of Holland), quoted and re-checked
  12. General Law - Part I, Title VII, Chapter 40A, Section 3 (Massachusetts statewide rule), quoted and re-checked
  13. Chapter 157: Mobile Homes and House Trailers - Town of Holland, MA (Town of Holland), quoted and re-checked
  14. Table of Contents - Town of Holland, MA (Town of Holland), quoted and re-checked
  15. Massachusetts General Laws c. 41, § 81O (Massachusetts statewide rule), quoted and re-checked
  16. Massachusetts General Laws Chapter 40A, Section 1A, quoted and re-checked

Written October 12, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Town of Holland

Town of Holland’s own rules

  • Building permitRequired

    Any building built, rebuilt, converted in use, or added to inside Holland town.

    • A building permit must be obtained first from the Building Inspector.
    • Where another Town approval is required, scaled drawings must accompany the request.
    “without first obtaining a building permit from the Building Inspector.”
  • Living in an RVLimited

    House trailers, mobile homes, or trailers containing sleeping and eating accommodations used as living quarters on a parcel inside Holland town.

    • No more than one such unit may be kept on any parcel.
    • Use as living quarters is prohibited except for a manufactured home placed at a residence destroyed by fire or another natural holocaust, for no more than 12 months while rebuilding.
    • The chapter does not prohibit a trailer camp established under M.G.L. c. 140.

    maximum units per parcel: 1 unit · temporary rebuilding occupancy: <= 12 months (Residence destroyed by fire or other natural holocaust)

    “No house trailer [...] may be used as living quarters while so located”
  • Manufactured homesLimited

    Manufactured-home occupancy inside Holland town.

    • A manufactured home may be used temporarily at the site of a residence destroyed by fire or another natural holocaust for no more than 12 months while the residence is rebuilt.
    • The chapter separately allows a trailer camp under M.G.L. c. 140.

    temporary occupancy period: <= 12 months (Residence destroyed by fire or other natural holocaust)

    “for a period not to exceed 12 months while the residence is being rebuilt.”
  • Accessory dwellingsLimited

    Accessory dwelling units inside Holland town.

    • The use table marks accessory dwelling units SP in AR, R, GA, B, and RB districts, meaning special-permit approval is required.
    • The use table marks accessory dwelling units N in the C district.
    • The table cross-references § 240-6.8 for standards.
    “Accessory dwelling unit | See § 240-6.8 | SP | SP | SP | SP | SP | | N”
  • Subdividing landRegulated (with conditions)

    Subdivision activity inside Holland town.

    • The Town code contains a separate Chapter 325 Subdivision Regulations with §§ 325-1 through 325-16; the detailed standards were not accessible during this run.
    “Chapter 325 Subdivision Regulations (§ 325-1 – § 325-16)”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Town of Holland or Hampden County directly.

  • Owner-builder exemption — Owner-builders constructing inside Holland town.
  • Inspections — Building inspections inside Holland town.
  • Certificate of occupancy — Certificates of occupancy inside Holland town.
  • Minimum dwelling size — Single-family residential districts AR, R, GA, B, and RB inside Holland town.
  • Minimum lot size — Single-family residential districts AR, R, GA, B, and RB inside Holland town.
11 more unanswered
  • Setbacks
  • Lot coverage
  • Building height
  • Camping on your land
  • Tiny homes
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Short-term rentals
  • Permit fees

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Town of Holland publishes no rule on the point, not that none exists. Hampden County’s page lists the county offices to call.

← All of Hampden County: county rules, score and offices