Zoning, building permits and septic rules in Town of Granville, Massachusetts

Town of Granville is a town in Hampden County, Massachusetts. Town of Granville adopts its own zoning, so inside its limits Town of Granville’s rules apply, not the county’s. Septic permits inside Town of Granville come from Town of Granville. 17 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Hampden County page.

Answers from the rulebook for Town of Granville

Town of Granville’s own rules

  • Building permitRequired

    New house construction, additions, renovations and demolition inside Granville town

    • Permit is obtained from the Building Inspector and the building approval sheet (BAS) must be signed by the boards listed in the guide.
    • Construction may proceed only after the signed building permit card and approvals; the guide lists the required signatures.
    • Plans must be approved by the building inspector before the permit card is signed.
    “13. obtain a building permit from the granville building inspector.”
  • Owner-builder exemptionConditional

    Owner-builder construction of a house in Granville town

    • A homeowner exemption form is required with the permit application.
    • If a licensed contractor is used, a copy of the home improvement contractor's or construction supervisor's license must be provided instead.
    • State owner-builder limits were not checked.
    “complete building application, provide appendix j energy report, insurance affidavits, homeowner exemption form and copy of home improvement contractor’s license or”
  • InspectionsRequired

    New construction and renovation permitted under the building permit process in Granville town

    • Owner must arrange each inspection individually with the inspectors (building, electrical, plumbing, Board of Health, DPW, fire) and pay the permit fees.
    • Re-inspections cost $60 each.
    • Septic installation has its own inspection (see septic_inspection).

    re-inspection fee: 60 USD

    “you are required to make your own arrangements with these inspectors individually and to pay the appropriate permit fees to the town.”
  • Certificate of occupancyRequired

    New houses and other dwellings built or altered under a Granville building permit

    • The dwelling may not be inhabited until the building permit card is signed by all inspectors, the Board of Health administrator, the DPW superintendent and the fire chief.
    • The town guide says the owner will not receive a certificate of occupancy until those approvals are obtained.
    “please note that you will not receive a certificate of occupancy and you may not inhabit the dwelling until these approvals are obtained.”
  • Local zoningPresent (with conditions)

    All land inside Granville town limits: the town adopts and administers its own Zoning Bylaw

    • The bylaw states the whole town is one agricultural-residential district; a floodplain overlay district also exists (see zoning_districts claim).
    • Permitted uses, special permits and dimensional rules in the bylaw apply inside town limits only.
    “the town of granville shall be considered an agricultureresidential district”
  • Zoning districtsPublished

    All land inside Granville town limits: the bylaw's two zoning districts, the agricultural-residential district (whole town) and the floodplain overlay district

    • The floodplain overlay covers only special flood hazard areas designated by FEMA; its rules are in bylaw section 4.3, which was not read.
    • The agricultural-residential district is the only general-use district named in section 2.1.
    “2.1.2 floodplain overlay district includes special flood hazard areas as designated by the federal emergency management administration.”
  • Minimum lot sizeSpecified

    Main residential district: the agricultural-residential district, which covers the whole town; buildings erected in it

    • Applies to a building erected in the agricultural-residential district; the bylaw says lots listed in tax records, shown on a plan, or described in a recorded deed before adoption may be considered compliant even if smaller.
    • Back land lot (section 3.9) may be created with reduced frontage: a lot with frontage under 200 feet needs three acres minimum excluding the access strip; a lot with frontage over 240 feet needs five acres minimum excluding access.
    • Planning Board may approve a back land lot; no more than one back land lot may be created from an existing parcel at the time the bylaw was enacted.

    minimum lot area: >= 44000 square feet (Lots existing before adoption that were listed or recorded may be considered compliant; back land lot rules in section 3.9 apply) · minimum frontage on a way: >= 200 feet (Back land lot rules in section 3.9 may reduce frontage)

    “a building hereafter erected in agricultural-residential district shall be located on a plot having not less than forty-four thousand (44,000) square feet of area and not less than two hundred (200) feet of frontage on a way.”
  • SetbacksSpecified

    Main residential district: the agricultural-residential district (whole town); buildings and additions on lots there

    • The 40-foot distance is measured from the property line as the bylaw states; the bylaw text read does not repeat the word front, so the front reading is inferred from the placement in section 3.8.2.
    • Accessory buildings have separate yard rules (see the accessory-building setback claim).
    • Back land lot rules in section 3.9 may change the setbacks.

    distance from property line (front): >= 40 feet (As stated in section 3.8.2) · side yard: >= 25 feet · rear yard: >= 25 feet

    “a building hereafter erected and any addition to an existing building shall be so located on the lot as to provide a side yard of not less than twenty-five (25) feet and a rear yard of not less than twenty-five (25) feet.”
    One more reviewed finding on this topic
    • Specified — Accessory buildings in the agricultural-residential district (whole town)
      “no accessory building shall be located in any side yard nearer to the side lot than twenty-five (25) feet, nor in the rear yard nearer to the rear lot line than twenty-five (25) feet.”
  • Camping on your landLimited

    Rental of campsites as part of a commercial recreation operation in Granville town

    • Requires a special permit from the Board of Appeals, which must find the area consistent with the master plan and safe for health, traffic and fire.
    • Campsite use must be temporary and short-term; the bylaw defines short-term as no longer than 180 days in any calendar year for any site in the same recreation area.
    • Campsites must be at least 100 feet from any other commercial activity or building, and the recreation area must be at least 50 acres.
    • Campsite water supply and waste disposal fall under the Board of Health and state Department of Public Health; electrical work must meet town and state electrical standards.

    minimum recreation area: >= 50 acres · maximum occupancy per site per calendar year: <= 180 days (Defined as short-term occupancy) · minimum distance of campsite from other commercial activity or building: >= 100 feet

    “g. when involving campsites, the use is to be temporary in nature for short-term occupancy. for the purpose of this code “short-term” shall mean occupancy in any site in the same recreation are for no longer than 180 days in any calendar year;”
  • Who permits septicLocal (with conditions)

    Septic (Title 5 disposal works) for new homes inside Granville town

    • The Granville Board of Health administers the state sanitary code (Title 5) locally through its Board of Health administrator.
    • The Board of Health administrator signs off the building approval sheet for septic work.
    “information on title v, state sanitary codes may be obtained from the board of health administrator”
  • Septic permitRequired

    Septic disposal works for new homes inside Granville town

    • A percolation test must be done by a licensed Massachusetts soil evaluator (engineer or sanitarian) and paid for before the test.
    • A Conservation Commission copy of the disposal-works plan carries an additional $100 fee.
    • The Board of Health administrator must review and sign the building approval sheet after review and correction.

    percolation test fee: 300 USD (Paid to Granville town hall with the test application) · disposal works plan review fee: 400 USD (Plan forwarded to the town with the original and two copies) · Conservation Commission review of disposal works plan: 100 USD (Additional fee)

    “using the perk test results, your professional engineer or sanitarian will draw plans for a disposal works system and forward an original and two copies with a fee of $400.00 to the town of granville.”
  • Septic inspectionRequired

    Septic installation for new homes inside Granville town

    • The system must be inspected by the engineer and the Board of Health administrator before backfilling.
    • At least 24 hours' notice is required to schedule the Board of Health review.
    • After installation, submit a certificate of compliance and an as-built drawing to the Board of Health.

    minimum notice for Board of Health review: >= 24 hours

    “your system must be inspected by both your engineer and the board of health administrator prior to backfilling. twenty-four hours notice (minimum) is required to schedule the review by the board of health administrator.”
  • Well permitLimited

    Private drinking-water wells for new homes on private land inside Granville town

    • Well must be drilled in accordance with Granville and state regulations.
    • The well driller must certify to the Board of Health that a potable water supply exists on the property.
    • The town does not require water testing, though the guide recommends it.
    • No separate well permit form or fee was located; the requirement is a driller certification.
    “have your well drilled on the lot in accordance with granville and state regulations and provide the board of health with a letter of certification from your well driller that there is a potable water- supply on the property. the town does not require that your water be tested, but it is a good idea to do so.”
  • Subdividing landRegulated (with conditions)

    Creating new lots or dividing land inside Granville town, reviewed by the Planning Board

    • Lots created by division must go to the Planning Board; a plan endorsed 'approval not required under subdivision control law' is one route.
    • A lot must meet the buildable-lot criteria (frontage and acreage) to be used for building.
    • Subdivision details are in the Planning Board's subdivision rules and regulations, which were not opened.

    planning review fee for a new-lot plan: 125 USD (Payable to the Town of Granville with the plot plan submission)

    “for new lots, submit to the planning board, a form a application, a mylar original and five (5) copies of a surveyed plot plan. include a check in the amount of $125.00 for the plan review fee”
  • Driveway accessRequired

    New residential driveway access from a Granville town road for a new house

    • The DPW Superintendent must certify that runoff will not enter the traveled way or create hazardous highway conditions.
    • The DPW will require a pipe, generally N-12 ADS, 18 inches minimum, smooth core or equivalent, for drainage.
    • Water may not be drained, ditched, pumped or conveyed into the roadside drainage system.

    minimum drainage pipe diameter: >= 18 inches (Generally N-12 ADS or equivalent)

    “11. obtain a driveway permit from the dpw superintendent certifying that water runoff from your property will not enter the traveled way at any time or create hazardous highway conditions.”
  • Permit feesPublished

    Building construction permits issued by Granville town

    • New house permit is charged per square foot and includes four inspections.
    • Each re-inspection costs extra.
    • The fetched fee page shows no effective or adoption date; septic perc-test and plan fees are on the septic claims.

    new house construction permit: 0.45 USD per square foot (Includes 4 inspections) · other construction permit (minimum): >= 125 USD (Includes 2 inspections) · re-inspection fee: 60 USD (Per re-inspection visit)

    “new construction (house)……………………$.45 sq. ft. (includes 4 inspections; $60.00 for each re-inspection)”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Town of Granville or Hampden County directly.

  • Minimum dwelling size — Minimum dwelling floor area inside Granville town
  • Lot coverage — Lot coverage in the agricultural-residential district (whole town)
  • Building height — Building height in the agricultural-residential district (whole town)
  • Living in an RV — Long-term RV or camper occupancy on private land inside Granville town
  • Tiny homes — Tiny home occupancy inside Granville town
7 more unanswered
  • Manufactured homes
  • Accessory dwellings
  • Off-grid sanitation
  • Mandatory utility hookup
  • Agricultural exemption
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Town of Granville publishes no rule on the point, not that none exists. Hampden County’s page lists the county offices to call.

Off-grid gear

Going off-grid in Town of Granville means bringing your own water and power. The kit we’d start with: