Franklin, Louisiana requires a city building permit before construction, remodeling, alteration, moving or demolition when the State Uniform Construction Code requires one.1 Inside Franklin in St. Mary Parish, city zoning controls land use and district-specific dimensions; the parish’s unincorporated zoning rules apply outside city limits.23 Septic approval comes from Louisiana’s Office of Public Health, with local service through the St. Mary Parish Health Unit.4

At a glance

Building permits
Obtain the required permit from the city before covered work begins1
Zoning
City zoning; requirements vary by district25
Septic permits
State health officer approval; community sewer feasibility comes first6
RV placement
Flood-zone conditions apply; private-land residential occupancy still needs city confirmation72
Minimum lot size
R-1A: 14,000 square feet, 100 feet wide and 140 feet deep8
Owner-builder
Conditional contractor-licensing exemption; building and safety requirements remain9
Subdivision water
City water connection required for each subdivision lot, subject to approvals10

Who to call

Building permits

City of Franklin Building and Zoning

City building-permit applications, zoning questions, inspections and occupancy approval

(337) 828-6303

[email protected]

Septic permits

St. Mary Parish Health Unit

Local Environmental Health contact for St. Mary Parish

985.380.2441

1200 David Drive, Morgan City, LA 70380

Contact details are copied from each office’s official page and were checked against it on October 11, 2026.

Off-grid gear

Going off-grid in Franklin means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Franklin, LA?

Franklin requires the city’s building permit before covered construction, remodeling, alteration, moving or demolition; the State Uniform Construction Code determines when a permit is required.1 The City of Franklin Building and Zoning application is the starting point, and only the owner or the owner’s authorized agent can obtain a permit.11 For new construction, alterations, mobile homes and accessory buildings, the application calls for scaled plans showing the lot, existing buildings, proposed work and parking.11 Ask the city to confirm the documents and fees for your specific project before submitting.

Louisiana’s owner-builder exemption concerns contractor licensing for a personal residence; an exemption affidavit is required, and health and life-safety requirements continue to apply.9

Does Franklin have zoning, lot-size rules and setbacks?

Franklin has municipal zoning, and the applicable dimensions depend on the parcel’s district.25 In Franklin’s R-1A single-family district, the minimum lot area is 14,000 square feet, with a minimum width of 100 feet and depth of 140 feet.8 For an R-1A house and garage or carport, setbacks are 30 feet at the front, 10 feet at the side, and 25 feet at the rear; the side setback is 15 feet on a corner lot.12

In Franklin’s A Agricultural district, a house and garage or carport instead require 15 feet front and rear, with a 5-foot side setback or 8 feet on a corner lot.13 Ask City Building and Zoning to identify the district and confirm the intended use before choosing a house footprint. The city application requires drawings to demonstrate compliance with setbacks, height and minimum lot size.11

How do septic permits work inside Franklin?

Franklin’s city building permit does not replace Louisiana Office of Public Health approval for an individual sewage treatment system: a municipality cannot authorize installation without that office’s written approval.14 The St. Mary Parish Health Unit provides local onsite-wastewater permitting service; its Environmental Health contact is 985.380.2441 at 1200 David Drive, Morgan City, LA 70380.415

Louisiana requires a state-health-officer permit before installing, altering or operating an individual system, with approved plans and specifications.6 A temporary installation permit depends on determining that community sewer connection is not feasible and that soils, drainage and lot dimensions will not create a nuisance or health hazard.6 Final approval requires verification of compliant installation, through an onsite inspection and/or installer certification.16 Resolve sewer availability with the city and septic suitability with the health unit before committing to an off-grid sanitation design.

Can you live in an RV or tiny home in Franklin?

Franklin’s verified RV rule is a flood-zone placement standard, not general permission to live in an RV on private land.7 In the specified A-series flood zones, an RV must stay fewer than 180 consecutive days, be fully licensed and ready for highway use, or satisfy the applicable permit, elevation and anchoring requirements for manufactured homes.7 Satisfying a flood standard alone does not answer the city zoning question; Franklin also regulates land use by district.2

We could not confirm a complete private-lot RV residential-occupancy rule, a tiny-home occupancy rule or an accessory-dwelling rule for Franklin. Ask City Building and Zoning about the proposed dwelling type, permanent occupancy and the parcel’s district before buying an RV or tiny home. Franklin’s separate camping restriction concerns city parks, playgrounds and recreation areas, where noncamping areas require a written city-council permit; it does not establish permission for private-land living.17

Building a home in Franklin: what are the steps?

  1. Ask City Building and Zoning to identify the parcel’s district and review a scaled site plan showing buildings, proposed work and parking against the zoning schedule.11
  2. Confirm water and sewer service with the city; for a subdivision, the owner must connect to city water and make it available to each lot, subject to parish health-unit and city-engineer approval.10 If individual sewage treatment is needed, arrange state approval through the parish health unit.4
  3. Obtain Franklin’s required building permit before covered work begins, and ask whether historic-district approval is needed.1811
  4. Arrange inspections and keep work accessible and exposed until approved; building, electrical and plumbing inspections cover foundation, framing or rough-in, and completion stages.11
  5. Obtain a certificate of occupancy before occupying a newly constructed building, after all inspections and zoning-compliance verification are complete.11

What should you check before buying land in Franklin?

Confirm the city-limit boundary before choosing a permit counter: Franklin issues its own required building permits and sets municipal zoning, while St. Mary Parish’s development code applies to unincorporated land.123 For a parcel outside Franklin, use the St. Mary Parish guide for the parish’s answer.3

For a subdivision lot inside Franklin, the city-water connection requirement matters before planning a private water supply.10 Louisiana also requires licensed drilling and registration for new wells; domestic wells fall under post-installation notification rather than the ordinary advance-notification rule.19 Ask City Building and Zoning about flood-zone requirements and historic-district review, and request the current building-permit fee schedule, driveway requirements and occupancy procedure for the proposed project. The city application flags possible historic-district approval and requires occupancy approval after inspections and zoning verification.11

Watch-outs

  • Franklin’s fewer-than-180-day RV provision applies to specified flood-zone sites; it is not a citywide private-land occupancy allowance.7
  • Franklin has district-specific zoning, but we could not confirm tiny-home, accessory-dwelling or minimum dwelling-floor-area rules; ask City Building and Zoning before designing the home.25
  • Historic-district work may require prior approval from the Historic District Commission even before the building-permit process is complete.11

Sources

  1. Sec. 14-1. - Building permit—Required (Franklin), quoted and re-checked
  2. library.municode.com (Franklin), quoted and re-checked
  3. Unified Development Ordinance, quoted and re-checked
  4. Onsite Wastewater Program, quoted and re-checked
  5. Sec. 86-26. - Zoning schedule (Franklin), quoted and re-checked
  6. Louisiana Administrative Code Title 51, Part XIII, Public Health—Sanitary Code (Louisiana statewide rule), quoted and re-checked
  7. Sec. 30-84. - Specific standards (Franklin), quoted and re-checked
  8. Sec. 86-26. - Zoning schedule (Franklin), quoted and re-checked
  9. Louisiana Revised Statutes § 37:2157 — Exemptions (Louisiana statewide rule), quoted and re-checked
  10. Sec. 87-105. - Water supply; fire hydrants (Franklin), quoted and re-checked
  11. City of Franklin Building and Zoning (franklin-la.com)
  12. Sec. 86-26. - Zoning schedule (Franklin), quoted and re-checked
  13. Sec. 86-26. - Zoning schedule (Franklin), quoted and re-checked
  14. RS 40:5. General powers and jurisdiction, quoted and re-checked
  15. St. Mary Parish Health Unit (ldh.la.gov)
  16. Louisiana Administrative Code Title 51, Part XIII, Public Health—Sanitary Code (Louisiana statewide rule), quoted and re-checked
  17. Sec. 58-118. - Permit to camp in noncamping areas (Franklin), quoted and re-checked
  18. Sec. 14-1. - Building permit—Required (Franklin), quoted and re-checked
  19. Louisiana Administrative Code, Title 43, Part VI, §701 (Louisiana statewide rule), quoted and re-checked

Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Franklin

Franklin’s own rules

  • Building permitRequired

    Construction, remodeling, alteration, moving, or demolition of dwellings, buildings, or structures inside Franklin city limits when a permit is required by the Louisiana State Uniform Construction Code.

    • The permit must be obtained from the City of Franklin before work begins.
    • The underlying state code determines when a permit is required.
    “when a permit is required [...] a permit therefor must first be obtained from the City of Franklin.”
  • Local zoningPresent

    Land inside Franklin city limits; Chapter 86 establishes municipal zoning districts and regulations.

    “Within the R-1A, R-1B, R-1C, R-2, R-3, R-4, R-5, A, B, C, and I districts established by this chapter, the following regulations shall apply (NA = Not Allowed):”
  • Zoning districtsPublished

    Franklin city zoning districts established by Chapter 86.

    • The opened schedule identifies R-1A, R-1B, R-1C, R-2, R-3, R-4, R-5, A, B, C, and I districts.
    • District-specific rules vary by row.
    “Within the R-1A, R-1B, R-1C, R-2, R-3, R-4, R-5, A, B, C, and I districts established by this chapter, the following regulations shall apply (NA = Not Allowed):”
  • Minimum lot sizeSpecified

    Single-family residential development in the R-1A district.

    • The R-1A district requires the listed minimum area, width, and depth.

    minimum lot area: >= 14000 sq. ft. · minimum lot width: >= 100 ft. · minimum lot depth: >= 140 ft.

    “R-1A Residential Dwelling (single-family); garage or accessory building; Home Occupations; Utility Rights-of-way All uses not specifically permitted in this section, including mobile homes 60 14,000 100 140”
  • SetbacksSpecified

    House and garage or carport in the A Agricultural district.

    • Front setback is 15 feet.
    • Side setback is 5 feet, or 8 feet if the side yard is on a corner lot.
    • Rear setback is 15 feet.
    • Mobile homes have separate setbacks of 15 feet front, 7.5 feet side, and 10 feet rear.

    front setback: >= 15 ft. · side setback: >= 5 ft. (8 feet if side yard on corner lots) · rear setback: >= 15 ft.

    “For house and garage (carport): 15 5 or 8 if side yard on corner lots 15 One-story accessory buildings: NA 5 5 All other structures: 20 20 20 For mobile homes: 15 7.5 10”
    One more reviewed finding on this topic
    • Specified — House and garage or carport in the R-1A district.
      “House and garage, or carport: 30 10 or 15 if side yard on corner lots 25”
  • Building heightSpecified

    Buildings in the R-1A district.

    • Maximum height shown in the R-1A row is 60 feet.

    maximum height: <= 60 ft.

    “R-1A Residential Dwelling (single-family); garage or accessory building; Home Occupations; Utility Rights-of-way All uses not specifically permitted in this section, including mobile homes 60 14,000”
  • Living in an RVLimited

    Recreational vehicles placed on sites in zones A1-30, AH, and AE on the community FIRM inside Franklin city limits.

    • The recreational vehicle must be on site for fewer than 180 consecutive days, or be fully licensed and ready for highway use, or meet the permit, elevation, and anchoring requirements applicable to manufactured homes.
    • A recreational vehicle is ready for highway use only under the ordinance definition.

    maximum consecutive days without other listed compliance: < 180 days (Must instead be fully licensed and ready for highway use or meet Sec. 30-61(a) permit and manufactured-home elevation and anchoring requirements.)

    “recreational vehicles [...] Be on the site for fewer than 180 consecutive days”
  • Camping on your landLimited

    Camping or overnight camper occupancy in Franklin city parks, playgrounds, and recreation areas.

    • A written permit from the city council is required in noncamping areas.
    • The ordinance excepts an area specifically designated for camping.
    “unlawful to camp or remain in a camper overnight [...] without a written permit issued by the city council”
  • Mandatory utility hookupWater (with conditions)

    Each lot in a subdivision inside Franklin city limits.

    • The owner must connect to the city water supply.
    • Connection is subject to approval by the parish health unit and city engineer.
    • The owner must make city water available for each lot in the subdivided area.
    “The owner shall connect with the city water supply [...] and make it available for each lot within the subdivided area.”
  • Permit processPartial

    Permits for construction and related work inside Franklin city limits.

    • A permit must be obtained before covered work begins.
    • The state uniform construction code determines when a permit is required.
    • Additional procedures may apply under zoning, floodplain, historic-district, or other city regulations.
    “Prior to construction, remodeling, alteration, moving or demolition”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Franklin or St. Mary Parish directly.

  • Inspections — Building inspections for construction inside Franklin city limits.
  • Certificate of occupancy — Certificates of occupancy for buildings inside Franklin city limits.
  • Minimum dwelling size — Single-family residential districts inside Franklin city limits.
  • Lot coverage — Lots inside Franklin city zoning districts.
  • Tiny homes — Tiny-home occupancy on private land inside Franklin city limits.
10 more unanswered
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Agricultural exemption
  • Driveway access
  • Short-term rentals
  • Permit fees

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Franklin publishes no rule on the point, not that none exists. St. Mary Parish’s page lists the county offices to call.

← All of St. Mary Parish: county rules, score and offices