The Town of Haughton, Louisiana administers building permits for regulated residential construction and has adopted construction codes.12 Haughton has local zoning, so confirm the parcel’s district with the Haughton Metropolitan Planning Commission.34 Haughton requires public-sewer connection where its mandatory-connection conditions apply; individual septic systems instead require Louisiana state-health-officer approval.56
At a glance
- Building permits
- Town-administered for regulated residential construction12
- Zoning
- Local zoning; ask Haughton MPC for the parcel’s district34
- Sewer and septic
- Mandatory public-sewer connection under town conditions; state approval for individual systems56
- RV living
- Flood-zone conditions apply; general private-land occupancy remains unconfirmed7
- Owner-builder
- State contractor-license exemption for a personal residence; building permits still apply8
- Private wells
- Licensed driller and state registration; domestic wells have different notification timing9
Who to call
Building permits
Town of Haughton Permit Administration
Town construction applications, contractor registration and building inspection questions
Zoning
Haughton Metropolitan Planning Commission
Local planning and zoning inquiries, district maps and application forms
Septic permits
Louisiana Department of Health, Onsite Wastewater Program
State onsite wastewater program; local applications through parish health-unit sanitarians
Septic permits
Contact the health unit and ask for the onsite wastewater sanitarian
3022 Old Minden Road, Bossier City, LA 71112
Contact details are copied from each office’s official page and were checked against it on October 11, 2026.
Off-grid gear
Going off-grid in Town of Haughton means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in the Town of Haughton, LA?
Haughton administers building permits for residential construction covered by Louisiana’s construction-code mandate, including new construction, reconstruction, qualifying additions and extensive alterations.1 Haughton adopts the construction-code editions adopted by Louisiana, subject to the stated manufactured-housing exceptions.2 Required inspections are performed by the town building official or accepted through contracted agents or certified third-party providers.10 Ask Town Permit Administration which building and trade applications your project needs before scheduling work.11 Haughton’s board of aldermen sets construction permit fees from time to time; the cited town fee provision does not establish current dollar amounts.12
Who handles building permit applications in the Town of Haughton?
Start with Town of Haughton Permit Administration, whose municipal page links the online application portal and lists a permit contact.11 Contractors and subcontractors doing construction, electrical, plumbing or mechanical work inside Haughton must hold current town registration.13 Registration requires a state license, photo identification, general liability insurance and a $25 registration fee, with annual re-registration.13 Louisiana’s owner-builder exemption applies to a personal residence and requires the state exemption affidavit to obtain the building permit; applicable subcontractor licensing and safety requirements continue.8 Ask Permit Administration how to submit the affidavit with your town application.11
Does the Town of Haughton have zoning and setback rules?
Haughton has local zoning: the town’s construction-fee ordinance expressly requires fences to comply with the zoning chapter.3 The Haughton Metropolitan Planning Commission page supplies a town map, zoning-amendment application and Haughton UDC link.4 Ask Haughton MPC to identify the parcel’s district and provide the applicable use, lot-size, setback, height and dwelling-size standards before choosing a house plan.4 We could not confirm the residential dimensional standards or a town-specific tiny-home or accessory-dwelling allowance. Louisiana authorizes municipal regulation of structure size, so a statewide minimum-size assumption cannot settle the Haughton parcel question.14
How do septic approvals work inside the Town of Haughton?
For human-occupancy properties in Haughton, connection to an abutting public sanitary sewer is mandatory when the sewer is within 300 feet of the property line.5 After public-sewer connection, existing septic tanks and similar disposal systems must be destroyed, filled or removed before final inspection.5 Where an individual system is eligible, Louisiana requires state-health-officer approval before installation, alteration or operation, including a determination that community-sewer connection is not feasible and the site is suitable.6 Parish health-unit sanitarians administer the onsite permitting system; contact the Bossier Parish Health Unit and ask for the sanitarian.1516 Final approval requires compliant-installation verification by inspection and/or installer certification.17
Can you live in an RV or tiny home in the Town of Haughton?
Haughton’s floodplain RV rule applies in the mapped flood zones identified in the ordinance: an RV must be onsite fewer than 180 consecutive days, be fully licensed and ready for highway use, or satisfy the referenced floodplain permit, elevation and anchoring requirements.7 Those floodplain alternatives do not establish a general right to occupy an RV on every Haughton lot.7 We could not confirm general private-land RV occupancy, temporary camping or tiny-home occupancy inside town limits. Ask Haughton MPC whether the proposed dwelling type and use are allowed at the exact address, then ask Permit Administration about construction applications and inspections.411
Building a home in the Town of Haughton: what should you do first?
- Ask Haughton MPC to locate the parcel on the town zoning map and identify the applicable development requirements.4
- Establish whether Haughton’s mandatory public-sewer connection rule applies; if an individual system is eligible, seek state health approval before installation.56
- Submit the town building application and confirm contractor registration or the owner-builder affidavit route.11138
- Arrange required building inspections with the town building official.10
For land outside town limits, consult the Bossier Parish guide: the parish building-permit rule covers unincorporated land.18 For a private well, Louisiana requires a licensed drilling contractor and state registration; domestic wells use post-installation notification rather than the ordinary advance-notification rule.9
Watch-outs
- A Haughton fence fee exemption is conditional on zoning compliance; a fee exemption does not remove that condition.3
- Haughton’s floodplain RV duration alternative does not answer general residential RV occupancy on private land.7
- We could not confirm Haughton’s certificate-of-occupancy procedure; ask Town Permit Administration before planning a move-in date.11
Sources
- Louisiana Revised Statutes 40:1730.23 — Enforcement of building codes by municipalities and parishes (Louisiana statewide rule), quoted and re-checked
- Haughton Code of Ordinances, Sec. 8-5—Building code (Town of Haughton), quoted and re-checked
- Haughton Code of Ordinances, Sec. 8-27—Permit fees (Town of Haughton), quoted and re-checked
- Haughton Metropolitan Planning Commission (haughtonla.gov)
- Haughton Code of Ordinances, Sec. 40-98—Mandatory connections (Town of Haughton), quoted and re-checked
- Louisiana Administrative Code Title 51, Part XIII, Public Health—Sanitary Code (Louisiana statewide rule), quoted and re-checked
- Haughton Code of Ordinances, Sec. 16-84—Specific standards (Town of Haughton), quoted and re-checked
- Louisiana Revised Statutes § 37:2157 — Exemptions (Louisiana statewide rule), quoted and re-checked
- Louisiana Administrative Code, Title 43, Part VI, §701 (Louisiana statewide rule), quoted and re-checked
- Haughton Code of Ordinances, Sec. 8-5—Building code (Town of Haughton), quoted and re-checked
- Town of Haughton Permit Administration (haughtonla.gov)
- Haughton Code of Ordinances, Sec. 8-27—Permit fees (Town of Haughton), quoted and re-checked
- Town of Haughton—Apply for Permits (Town of Haughton), quoted and re-checked
- RS 33:4721 — Regulation of size and use of buildings (Louisiana statewide rule), quoted and re-checked
- Louisiana Department of Health, Onsite Wastewater Program (ldh.la.gov)
- Bossier Parish Health Unit (ldh.la.gov)
- Louisiana Administrative Code Title 51, Part XIII, Public Health—Sanitary Code (Louisiana statewide rule), quoted and re-checked
- Bossier Parish Building Safety Code Ordinance 4202, quoted and re-checked
Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.