Bolthole Index

Webster County, Kentucky

Zoning, building permits and septic rules in Dixon, Kentucky

Dixon is a city in Webster County, Kentucky. Septic permits inside Dixon come from the county and state together. 10 rules below are quoted from official sources and independently re-checked, most recently on November 6, 2026. Rules for unincorporated land are on the Webster County page.

Answers from the rulebook for Dixon

Rules another office applies inside Dixon

Dixon does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Building permitLimited

    Single-family dwellings in Dixon city under the statewide residential-code rule.

    • A local ordinance may require a permit; no current official Dixon ordinance was located.
    “Permits, inspections, and certificates of occupancy shall not be required for a single-family dwelling unless required by local ordinance.”
  • Building code adoptedAdopted (with conditions)

    Single-family dwellings, two-family dwellings, and townhouses constructed in Kentucky, including Dixon city.

    • Kentucky amendments in the 2018 Kentucky Residential Code supersede conflicting provisions in the 2015 IRC.
    “the 2015 International Residential Code for One (1) and Two (2) Family Dwellings (IRC) shall be the mandatory state residential building code”
  • InspectionsLimited

    Single-family dwellings in Dixon city under the statewide residential-code rule.

    • A local ordinance may require inspections; no current official Dixon ordinance was located.
    “Permits, inspections, and certificates of occupancy shall not be required for a single-family dwelling unless required by local ordinance.”
  • Certificate of occupancyLimited

    Single-family dwellings in Dixon city under the statewide residential-code rule.

    • A local ordinance may require a certificate of occupancy; no current official Dixon ordinance was located.
    “Permits, inspections, and certificates of occupancy shall not be required for a single-family dwelling unless required by local ordinance.”
  • Who permits septicMixed (with conditions)

    On-site sewage disposal systems in Dixon city when an on-site system is used.

    • The statewide program is administered through the local health department.
    • Local health department inspectors conduct site evaluations and inspections.
    “The Onsite Sewage Disposal Systems Program is administered through local health departments”
  • Septic permitRequired

    Construction, installation, or alteration of an on-site sewage disposal system in Dixon city.

    • A site evaluation must first be conducted.
    • The permit must be obtained before construction of any portion of the system.
    • The permit is issued only by a certified inspector and only to a certified installer or qualifying homeowner.
    • The permit expires one year after issuance unless the cabinet grants an extension.

    permit validity: 1 year (unless an extension is granted by the cabinet)

    “a permit to construct, install, or alter an on-site sewage disposal system shall be obtained prior to construction”
  • Off-grid sanitationLimited

    Use of an on-site sewage disposal system for a residence in Dixon city.

    • A site evaluation is required.
    • A construction, installation, or alteration permit must be obtained before construction.
    • The system must meet applicable statewide requirements.
    “After the site evaluation has been conducted, a permit to construct, install, or alter an on-site sewage disposal system shall be obtained”
  • Subdividing landRegulated (with conditions)

    Subdivision approval where individual lots or sites use on-site sewage disposal systems, including in Dixon city.

    • Each individual lot or site must be evaluated individually.
    • The applicant follows the individual site-approval procedures.
    • A local health department may adopt more-specific compatible subdivision requirements.
    “Each individual lot or site shall be evaluated individually.”
  • Permit feesPublished (with conditions)

    On-site sewage disposal construction permits in Dixon city.

    • The applicant pays the statewide on-site sewage disposal permit fee and any required fee established by the local board of health.
    • Cluster-system plan review has a separate $600 state fee.

    on-site sewage disposal permit fee: 50 USD (plus the required fee established by the local board of health) · cluster-system plan review fee: 600 USD (payable by check or money order to the Kentucky State Treasurer)

    “The on-site sewage disposal permit fee of fifty (50) dollars”
  • Permit processPublished (with conditions)

    On-site sewage disposal construction permits in Dixon city.

    • The applicant must submit the completed application and required fee.
    • The application must include a detailed drawing with necessary specifications.
    • The permit follows the site evaluation and must be obtained before construction.
    “An application for a construction permit shall be submitted and accompanied by a detailed drawing of the proposed system or alteration”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Dixon or Webster County directly.

  • Local zoning — Land within Dixon city limits, Webster County, Kentucky.
  • Zoning districts — Zoning districts within Dixon city.
  • Minimum dwelling size — Dwellings within Dixon city.
  • Minimum lot size — Residential lots within Dixon city.
  • Setbacks — Structures within Dixon city.
15 more unanswered
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Septic inspection
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Shed and accessory-building permit exemption
  • Driveway access
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Dixon publishes no rule on the point, not that none exists. Webster County’s page lists the county offices to call.

← All of Webster County: county rules, score and offices