Hazard, Kentucky requires a city building permit before excavation, construction or structural alteration, with specified exceptions.1 Hazard has its own zoning, while water and sewage approval belongs to the County Health Officer and regulated septic systems need a local health department permit.234 For land outside Hazard city limits, use the Perry County guide: unincorporated Perry County has no county zoning.5
At a glance
- Building permits
- City building permit required before excavation, construction or alteration; exceptions include recurring maintenance.1
- Zoning
- Hazard has city zoning; confirm the parcel’s district before choosing a use.2
- Septic permits
- Local health department permit required for regulated onsite sewage systems.4
- Water and sewer
- Buildings must connect wherever public water or sewer mains are accessible.6
- Manufactured homes
- Mobile homes are conditional residential uses; placement outside a park needs Planning Commission permission.7
- Occupancy
- City certificate of occupancy required for newly erected or altered structures and changes of use, with exceptions.8
- RV and tiny-home living
- We could not confirm Hazard’s specific occupancy rules; ask the Planning and Zoning Administrator.9
Who to call
Building permits
Starting contact for routing Hazard city building-permit applications to the Administrative Officer.
700 Main Street, Hazard, KY 41701
Zoning
Hazard Planning and Zoning Administrator
Hazard zoning questions and routing requests for Planning Commission review.
Septic permits
Perry County Health Department Environmental Office
Onsite sewage site evaluations, septic permits and inspections through the local health department.
239 Lovern Street, Hazard, KY 41701
Also useful
Hazard City Hall — Utility Service Questions
City utility service questions and current water notices.
700 Main Street
Contact details are copied from each office’s official page and were checked against it on October 12, 2026.
Off-grid gear
Going off-grid in Hazard means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Hazard, KY?
Hazard requires a building permit from the city’s Administrative Officer before excavation, construction or alteration of a structure.1 Recurring maintenance is exempt regardless of cost, and the ordinance also exempts certain approved subdivision improvements and listed structures and uses.1 Hazard has adopted the Kentucky building and residential codes and established an inspection program covering single-family dwellings.1011 A new home therefore needs both city land-use review and the applicable building inspections; ask the Administrative Officer which inspections your proposed work requires.111
Who issues building permits in Hazard, and how do you apply?
Hazard’s ordinance assigns building permits to the Administrative Officer; start with Hazard City Hall at +1 606-436-3171 and ask to be routed to that role.112 Hazard’s application requires a scaled plan showing lot and structure dimensions, existing structures, uses and yard depths, plus the County Health Officer’s water and sewerage certificate.13 The Administrative Officer must act within 2 weeks after submission, and a building permit becomes void after 6 months unless extended for valid reason.13 Hazard’s published building-permit fee schedule depends on estimated construction cost; request the complete current schedule before budgeting a house.14
Does Hazard have zoning, and what does it mean for a homesite?
Hazard has city zoning and a zoning map identifying residential, business, industrial and planned-development districts.215 Ask the Hazard Planning and Zoning Administrator to identify the parcel’s district and the applicable lot, yard and use requirements before ordering a house plan.9 Hazard treats mobile homes as conditional uses in residential districts; placement outside a mobile-home park requires Planning Commission permission, proximity findings and compliance with principal-building regulations.7 Hazard also requires final Planning Commission approval and recording with the County Clerk before subdivision, and a building permit cannot issue for a subdivided parcel before those steps are complete.16
How do septic permits and water connections work inside Hazard?
Hazard requires buildings to connect wherever public water or sewer mains are accessible; where neither is available, individual water supply and sewage disposal must meet County Health Officer requirements.6 Confirm service availability before paying for a private well or septic design.6 The Kentucky River District Health Department serves Perry County, and the Perry County Health Department Environmental Office is the local contact for septic questions.1718 For an onsite system, arrange the site evaluation, then obtain the septic construction permit before constructing any part of the system.19 Final installation inspection remains a local health department function.20
Can you live in an RV or tiny home on your land in Hazard?
We could not confirm Hazard’s specific rules for residential RV occupancy, temporary camping, tiny homes or accessory dwelling units; ask the Hazard Planning and Zoning Administrator about the proposed dwelling and parcel.9 Hazard’s ordinary zoning and building-permit requirements still need to be addressed for a proposed structure.21 Do not treat Hazard’s mobile-home provisions as permission for an RV: those provisions address mobile homes, including conditional-use approval for placement outside a park.7 We also could not confirm a city owner-builder or farm-building exemption; ask City Hall to route that question to the Administrative Officer before starting work.12
What are the steps for building a home in Hazard?
- Ask Hazard’s Planning and Zoning Administrator to confirm the parcel’s zoning district and proposed use.92
- Confirm public water and sewer access; obtain the County Health Officer’s required water and sewage approval, including a septic permit where applicable.64
- Submit the scaled site and structure plans with the health certificate to the Administrative Officer for a city building permit before excavation or construction.131
- Arrange the required building inspections and septic installation inspection for the work being performed.1120
- Obtain Hazard’s certificate of occupancy before using a newly erected or altered structure, subject to the ordinance’s exceptions.8
Watch-outs
- Hazard requires the County Health Officer’s water and sewerage certificate with both building-permit and certificate-of-occupancy applications.6
- Hazard’s city website currently posts a boil-water advisory for the Lothair area until further notice; ask City Hall for current utility notices before arranging service.21
- We could not confirm a general Hazard driveway-access permit rule; ask City Hall which office reviews access for the proposed address.12
Sources
- § 157.101 Building permits (Hazard), quoted and re-checked
- codelibrary.amlegal.com (Hazard), quoted and re-checked
- § 157.021 Water supply and sewage disposal (Hazard), quoted and re-checked
- KRS 211.350 On-site sewage disposal systems (Hazard), quoted and re-checked
- Bright Mountain Solar Project — Socioeconomic Report, quoted and re-checked
- § 157.021 Water supply and sewage disposal (Hazard), quoted and re-checked
- § 157.082 Mobile homes (Hazard), quoted and re-checked
- § 157.102 Certificate of occupancy (Hazard), quoted and re-checked
- Hazard Planning and Zoning Administrator (kydlgweb.ky.gov)
- § 150.10 Adoption of Uniform State Building Code (Hazard), quoted and re-checked
- § 150.10 Adoption of Uniform State Building Code (Hazard), quoted and re-checked
- Hazard City Hall (hazardky.gov)
- § 157.101 Building permits (Hazard), quoted and re-checked
- § 150.01 Permit fees (Hazard), quoted and re-checked
- codelibrary.amlegal.com (Hazard), quoted and re-checked
- codelibrary.amlegal.com (Hazard), quoted and re-checked
- Local Health Departments, quoted and re-checked
- Perry County Health Department Environmental Office (dhbc.ky.gov)
- apps.legislature.ky.gov, quoted and re-checked
- KRS 211.350 On-site sewage disposal systems (Hazard), quoted and re-checked
- Hazard City Hall — Utility Service Questions (hazardky.gov)
Written October 12, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.