Bolthole Index

Ohio County, Kentucky

Zoning, building permits and septic rules in Beaver Dam, Kentucky

Beaver Dam is a city in Ohio County, Kentucky. Beaver Dam adopts its own zoning, so inside its limits Beaver Dam’s rules apply, not the county’s. Septic permits inside Beaver Dam come from Beaver Dam. 12 rules below are quoted from official sources and independently re-checked, most recently on November 7, 2026. Rules for unincorporated land are on the Ohio County page.

Answers from the rulebook for Beaver Dam

Beaver Dam’s own rules

  • Building permitRequired

    Excavation, construction, moving, alteration, or demolition of buildings inside Beaver Dam city limits.

    • Applies to buildings including accessory buildings.
    • Recurring maintenance work and installation of required improvements under an approved subdivision plat are exceptions.
    • Dog houses under 18 square feet and under 4 feet high are exempt only if required yards and setbacks are maintained and there is no related run or penned enclosure.
    • Business-structure or multiple-housing site preparation requires a permit; the application must be made at least 20 days before activity.

    dog house floor area exemption threshold: < 18 square feet (Also less than 4 feet high, yards and setbacks maintained, and no related run or penned enclosure.) · site preparation application lead time: >= 20 days (Business structures or multiple housing.)

    “buildings, until the Administrative Officer has issued a building permit for such work.”
  • Local zoningPresent (with conditions)

    All land within Beaver Dam city corporate limits.

    • The ordinance applies jointly to Hartford and Beaver Dam; certified copies are stated to be on file with Beaver Dam City Clerk's Office.
    “This Ordinance shall apply to all lands within the corporate limits of the Cities of Hartford and Beaver Dam.”
  • Zoning districtsPublished (with conditions)

    Zoning districts within Beaver Dam city limits.

    • The ordinance's district provisions include agricultural, residential, business, industrial, and flood-plain districts.
    “AGRICULTURAL DISTRICTS 43 651 FARM-ORIENTED AGRICULTURAL DISTRICTS (A-I) 43 660 RESIDENTIAL DISTRICTS 44”
  • Manufactured homesLimited

    Manufactured homes inside Beaver Dam city limits.

    • Manufactured homes are subject to the same applicable site-development standards as site-built dwelling units.
    • Manufactured-home communities must conform to the referenced state-law development standards.
    “manufactured homes shall be subject to the same site development standards, such as building setbacks, height, lot coverage, etc.”
  • Agricultural exemptionAvailable (with conditions)

    Agricultural buildings on land used solely for agricultural, farming, dairying, stock raising, or similar purposes inside Beaver Dam city limits.

    • Setback lines and/or buffer zones remain required for protection of existing development under the ordinance's stated exception.
    “shall have no regulations imposed as to building permits, height, yard, location or court requirements for agricultural buildings except that:”
  • Shed and accessory-building permit exemptionConditional

    Dog houses as accessory structures inside Beaver Dam city limits.

    • The dog house must have less than 18 square feet of floor area and be less than 4 feet in height.
    • Required accessory-building yards and setbacks must be maintained.
    • A dog house with a related run or penned enclosure must obtain a permit.

    dog house floor area: < 18 square feet (Exemption also requires height under 4 feet and no related run or penned enclosure.) · dog house height: < 4 feet (Exemption also requires floor area under 18 square feet and no related run or penned enclosure.)

    “Dog houses with less than 1 8 square feet of floor area and less than 4 feet in height shall be exempt”
  • Subdividing landRegulated (with conditions)

    Subdivision of land inside Beaver Dam city limits.

    • The subdivision regulations are for Hartford and Beaver Dam and were adopted by the Hartford/Beaver Dam Joint Planning Commission.
    “SUBDIVISION REGULATIONS for HARTFORD AND BEAVER DAM, KENTUCKY”
  • Permit feesPublished (with conditions)

    Applications and appeals under the joint Beaver Dam zoning ordinance.

    • No action is taken on an application or appeal until applicable fees, charges, and expenses are paid in full.
    • The fee schedule may be altered or amended only by official Planning Commission action.
    “The schedule of fees shall be posted in the office of the Administrative Officer”
  • Permit processPublished (with conditions)

    Building-permit applications inside Beaver Dam city limits.

    • A plan drawn to scale must show specified lot, structure, use, and yard information.
    • The City Water and Wastewater Office's or County Health Officer's approval certificate must accompany the application as required by Section 880.
    • The Administrative Officer acts within two weeks of submission under the stated issuance procedure.

    administrative action period: <= 2 weeks (Measured from submission of the building-permit application.)

    “The Administrative Officer shall act upon applications for building permits within two (2) weeks from the date of their submission.”

Rules another office applies inside Beaver Dam

Beaver Dam does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Who permits septicLocal (with conditions)

    Onsite septic systems inside Beaver Dam city limits where an onsite system is proposed.

    • The state identifies the local health department as the approving authority.
    “Septic systems require approval from the local health department​.”
  • Septic permitRequired

    Onsite septic systems inside Beaver Dam city limits.

    • Approval must be obtained from the local health department.
    “After a site is approved, the health department can issue a permit to a certified contractor for septic system construction and inspection.”
  • Off-grid sanitationLimited

    Off-grid sanitation using an onsite septic system inside Beaver Dam city limits.

    • An onsite septic system requires local-health-department approval.
    “Septic systems require approval from the local health department​.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Beaver Dam or Ohio County directly.

  • Owner-builder exemption — Owner-built residences inside Beaver Dam city limits.
  • Building code adopted — Construction inside Beaver Dam city limits.
  • Inspections — Building work inside Beaver Dam city limits.
  • Minimum dwelling size — Dwellings inside Beaver Dam city limits.
  • Minimum lot size — Residential lots inside Beaver Dam city limits.
13 more unanswered
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Accessory dwellings
  • Septic inspection
  • Well permit
  • Mandatory utility hookup
  • Driveway access
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Beaver Dam publishes no rule on the point, not that none exists. Ohio County’s page lists the county offices to call.

← All of Ohio County: county rules, score and offices