Bolthole Index

Boyle County, Kentucky

Zoning, building permits and septic rules in Danville, Kentucky

Danville is a city in Boyle County, Kentucky. Danville adopts its own zoning, so inside its limits Danville’s rules apply, not the county’s. 8 rules below are quoted from official sources and independently re-checked, most recently on October 23, 2026. Rules for unincorporated land are on the Boyle County page.

Answers from the rulebook for Danville

Danville’s own rules

  • Local zoningPresent (with conditions)

    Land inside Danville city limits, under the Boyle County/Joint Zoning Ordinance that the City of Danville adopts and administers jointly with Boyle County and Perryville through the Danville-Boyle County Planning & Zoning Commission

    • Danville's own ordinance 1926 (passed by the city of Danville) repealed Articles 1, 2, 3, 4, 6, 10, 12, 14, 15, 16 and 18 of the joint ordinance and replaced Articles 1, 2, 3 and 6; the joint ordinance text on the 2024 PDF may therefore be partly superseded.
    • Joint ordinance is also adopted by Boyle County and Perryville; this claim records only the City of Danville's adoption.
    “ordinance number 1926 (pdf) - an ordinance of the city of danville, kentucky, repealing articles 1, 2, 3, 4, 6, 10, 12, 14, 15, 16 and 18 of the "zoning ordinance, boyle county, the cities of danville, and perryville" and replacing with revised articles 1, 2, 3 and 6 pertaining to general provisions/review bodies, definitions, development review procedures, and nonconformities.”
  • Minimum lot sizeDistrict specific (with conditions)

    Agriculture (AG) district land inside Danville city

    • Lot area is 50,000 sf for both public sewer and septic system lots.
    • Lot width 100 ft at building line; lot frontage 40 ft (public street cul-de-sac bulb only).
    • Ordinance 1926 repealed Article 4 of the joint ordinance and the replacement district tables were not located; this figure may be superseded.
    • The 2019 draft ordinance reported in a news article (5 acres) is superseded by this 2024 text and was not used.

    lot area (minimum), public sewer: 50000 sf · lot area (minimum), septic system: 50000 sf

    “agriculture district (ag) c. lot area (minimum) public sewer 50,000 sf septic system 50,000 sf lot width (minimum at building line) 100 ft”
  • Lot coverageDistrict specific (with conditions)

    Agriculture (AG) district land inside Danville city

    • Ordinance 1926 repealed Article 4 and the replacement tables were not located; figure may be superseded.

    lot coverage (maximum): 25 %

    “agriculture district (ag) c. lot area (minimum) public sewer 50,000 sf septic system 50,000 sf lot width (minimum at building line) 100 ft lot frontage (minimum) public street cul-de-sac (bulb only) 40 ft 40 ft lot coverage (maximum) 25%”
  • Manufactured homesLimited

    Manufactured homes inside Danville city: permitted as a residential unit type in the Agriculture (AG) district and the R1-C district; the joint ordinance table does not list manufactured homes for R1-A or R1-B

    • Per the joint ordinance definition, a manufactured home must be affixed to a permanent foundation, have perimeter skirting, and have a composite roof with minimum 3-in-12 pitch.
    • Source is the joint ordinance as amended October 2024; ordinance 1926 may have replaced Article 4 unit-type tables.
    • The R1 table column mapping was read from a flattened capture; confirm the R1-C column before relying on it.
    “r1-a r1-b r1-c single-family detached p p p modular home p p p manufactured home -- -- p”
  • Accessory dwellingsLimited

    Accessory apartments inside Danville city in the Agriculture (AG) district; the joint ordinance also lists them in the R1 table for certain districts

    • Accessory apartment standards (size, owner occupancy, separate entrance and similar) were not read.
    • The R1 accessory-apartment row of the flattened table has an extra column; confirm before relying on R1 entries.
    • Source is the joint ordinance as amended October 2024; ordinance 1926 may have replaced Article 4.
    “a. single-family detached; b. modular home; c. manufactured home; and d. accessory apartments”
  • Mandatory utility hookupSewer (with conditions)

    New single-family homes in the R1-A, R1-B and R1-C districts inside Danville city

    • The text states the district must be served by public sanitary sewer; it does not state a mandatory connection-when-available distance rule. The sewer-connection rule in chapter 18 (utilities) was not read.
    • Source is the joint ordinance as amended October 2024; ordinance 1926 may have replaced parts of Article 4.
    “these districts shall be served by public sanitary sewer.”
  • Subdividing landRegulated (with conditions)

    Land divisions inside Danville city, under the city code's subdivision regulations chapter

    • Subdivision regulations chapter 15 of the city code is listed; its text was not read.
    • Boyle County subdivision regulations are a separate document and were not used for this claim.
    “chapter 14 streets, sidewalks and other public places* chapter 15 subdivision regulations* chapter 16 taxation*”
  • Permit processPartial

    Zoning permits for paved parking, display areas, travelways and other paved surfaces inside Danville city

    • The text exempts single-family uses or districts from this zoning-permit requirement.
    • Building-permit process for dwellings is not established by this claim.
    “shall require a zoning permit first being obtained from the planning commission. this requirement does not apply to single-family uses or districts.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Danville or Boyle County directly.

  • Building permit — Building permits for new homes inside Danville city
  • Owner-builder exemption — Owner-builder exemption inside Danville city
  • Building code adopted — Building code adoption inside Danville city
  • Inspections — Building inspections inside Danville city
  • Minimum dwelling size — Minimum dwelling size inside Danville city
15 more unanswered
  • Setbacks
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Agricultural exemption
  • Driveway access
  • Building in a floodplain
  • Short-term rentals
  • Permit fees

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Danville publishes no rule on the point, not that none exists. Boyle County’s page lists the county offices to call.

Off-grid gear

Going off-grid in Danville means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

← All of Boyle County: county rules, score and offices