Scottsville, Kentucky requires residential building permits through the Scottsville-Allen County Planning Commission.1 Scottsville sets zoning inside city limits; septic approval stays with the Allen County Health Department.23 In this Allen County city, available municipal sewer must be connected, so a septic system is not automatically an alternative to sewer service.4
At a glance
- Residential building permit
- Required inside Scottsville city limits1
- Zoning
- City zoning; use must conform to the parcel’s district2
- Septic permits
- Allen County Health Department; site evaluation before construction permit35
- Sewer connection
- Required where municipal sewer is available, including a city sewer within 250 feet4
- SF district lot size
- At least 0.25 acre with public sewer or 0.7 acre with approved onsite sewage6
- Residential permit fee
- Current application: $400 minimum or 13 cents per square foot, whichever is larger7
- Private wells
- No state owner application or fee; Kentucky Certified Water Well Driller required8
Who to call
Building permits
Scottsville-Allen County Planning Commission — Residential Building Permits
Scottsville residential building-permit applications, plan submissions and inspection coordination.
201 West Main St. Suite 202 Scottsville, KY 42164
Zoning
Scottsville-Allen County Planning Commission — Zoning and Applications
Scottsville zoning questions and residential building-permit application forms.
Septic permits
Allen County Health Department
Local onsite sewage site evaluations, septic permits and inspections under Kentucky’s onsite sewage program.
107 North Court St. Scottsville, Kentucky 42164
Contact details are copied from each office’s official page and were checked against it on October 12, 2026.
Off-grid gear
Going off-grid in Scottsville means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Scottsville, KY?
Scottsville requires a residential building permit inside city limits, and the Scottsville-Allen County Planning Commission publishes the application.1 Scottsville’s code adopts the Commonwealth Building Code and provides for certified building, electrical and plumbing inspectors for residential construction.910
The current residential application lists a new single-family fee of $400 minimum or 13 cents per square foot, whichever is larger; ask the commission to calculate the charge for your plans.7 Kentucky’s single-family default does not remove Scottsville’s local residential building-permit requirement.111
Who issues building permits in Scottsville, and how do you apply?
Start a Scottsville residential building-permit application with the Scottsville-Allen County Planning Commission at 270-237-4180 or [email protected]; the application gives its address as 201 West Main St. Suite 202 Scottsville, KY 42164.7
The Scottsville application requires a plot or site plan before processing, plus foundation and floor plans with the application and fees.7 After submitting those materials, contact the building inspector before work starts.7 The applicant is responsible for coordinating inspections, and inspection requests require at least 72 hours’ notice.7
Does Scottsville have zoning, lot-size limits and setbacks?
Scottsville has zoning: land use and construction, movement or alteration of structures must conform to the rules of the district where the property lies.2 Ask the Scottsville-Allen County Planning Commission to identify the parcel’s district and applicable setbacks before drawing a site plan.27
In Scottsville’s SF Residential District, a single-family lot needs at least 0.25 acre with public sanitary sewer, or 0.7 acre with a Health Department-approved onsite sewage system.6 Buildings and required parking together may cover no more than 25% of the SF lot.12 Sewer availability therefore affects both sanitation planning and the minimum lot area in that district.64
How do septic permits work inside Scottsville?
Before planning septic in Scottsville, establish whether municipal sewer is available: the city definition includes premises abutting a public way or easement with a capable sewer installation, or a city sewer within 250 feet.4 Scottsville requires connection to available sewer, with a 90-day connection deadline under the ordinance’s existing- and newly-available-service provisions.4
For onsite sewage, the Allen County Health Department administers the local program, including addresses inside Scottsville.3 A site evaluation comes before the septic construction permit, and the application requires a detailed drawing, specifications and fees before any part of the system is built.5 Installation inspection must be requested and completed before backfilling, subject to the regulation’s permitted installer-affidavit procedure.13
Can you live in an RV or tiny home in Scottsville?
We could not confirm Scottsville’s rules for long-term RV occupancy, temporary camping, tiny-home occupancy, accessory dwellings or minimum dwelling floor area; ask the Scottsville-Allen County Planning Commission about the proposed use and parcel before buying a unit. Scottsville requires land uses and structures to conform to the parcel’s zoning district.2
Scottsville’s manufactured-home subdivision provisions do supply a narrower answer: the MH-1 standards require at least 5 contiguous acres and 10 lots, with a conditional exception for smaller adjoining tracts extending an existing subdivision.14 Manufactured homes must connect to public sanitary sewer or an onsite system approved by the Health Department.15 Those subdivision standards do not establish permission for RV or tiny-home occupancy on an individual lot.14
Building a home in Scottsville: what are the steps?
- Ask the Scottsville-Allen County Planning Commission to confirm the zoning district, proposed use and site layout against Scottsville’s district rules.2
- Establish sewer availability; if onsite sewage is appropriate, arrange the Allen County Health Department site evaluation and obtain the septic construction permit before installing the system.435
- Submit the Scottsville residential building-permit application, site plan, foundation and floor plans, and fees; contact the building inspector before starting work.7
- Coordinate the required building inspections and separate electrical and plumbing inspections; give the building inspector at least 72 hours’ notice for inspection requests.107
What should you check before buying land in Scottsville?
Ask the planning commission about city boundaries and district rules; for land outside Scottsville, use the Allen County guide because the commission’s forms distinguish city-required residential building permits from county-optional residential permits, except qualifying multifamily projects.1
Kentucky requires state and local floodplain development permits in identified floodplains; ask the commission to identify Scottsville’s local floodplain coordinator for the parcel.16 A new single-family driveway approach on Department of Highways right-of-way requires written application to the District Engineer.17 Kentucky does not require an owner application or fee for constructing or abandoning a private well, but the work requires a Kentucky Certified Water Well Driller; ask the commission about any additional city requirements.8
Watch-outs
- Scottsville’s SF minimum lot area changes with public sewer versus approved onsite sewage; confirm sanitation before treating a small lot as buildable.6
- Available municipal sewer in Scottsville requires connection; owning enough land for septic does not by itself avoid that requirement.4
- Ask the Scottsville-Allen County Planning Commission about owner-built work and occupancy approval before construction; Scottsville provides for residential building, electrical and plumbing inspections.10
Sources
- Scottsville-Allen County Planning Commission — Zoning and Applications (scottsvilleallencountyplanningandzoning.com)
- Scottsville Code § 153.001, Zoning affects every structure or use (Scottsville), quoted and re-checked
- Local Health Departments, quoted and re-checked
- Scottsville Code § 53.01, Consolidated water and sewer system (Scottsville), quoted and re-checked
- 902 KAR 10:085 Kentucky on-site sewage disposal systems, quoted and re-checked
- Scottsville Code § 153.072, Required lot area and width (Scottsville), quoted and re-checked
- Scottsville-Allen County Planning Commission — Residential Building Permits (scottsvilleallencountyplanningandzoning.com)
- Water Well Information for Home Owners (Kentucky statewide rule), quoted and re-checked
- Scottsville Code § 150.02, Adoption of Building Code (Scottsville), quoted and re-checked
- Scottsville Code § 150.02, Adoption of Building Code (Scottsville), quoted and re-checked
- 815 KAR 7:125, Kentucky Residential Code (Kentucky statewide rule), quoted and re-checked
- Scottsville Code § 153.072, Required lot area and width (Scottsville), quoted and re-checked
- 902 KAR 10:085 Kentucky on-site sewage disposal systems, quoted and re-checked
- Scottsville Code § 153.089, Dimensional and area requirements (Scottsville), quoted and re-checked
- Scottsville Code § 153.089, Dimensional and area requirements (Scottsville), quoted and re-checked
- Find Your Flood Zone (Kentucky statewide rule), quoted and re-checked
- 603 KAR 1:020 Driveway approaches, entrances; construction and maintenance (Kentucky statewide rule), quoted and re-checked
Written October 12, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.