Woodson County, Kansas
Yates Center is a city in Woodson County, Kansas. Yates Center adopts its own zoning, so inside its limits Yates Center’s rules apply, not the county’s. Septic permits inside Yates Center come from Yates Center. 14 rules below are quoted from official sources and independently re-checked, most recently on November 3, 2026. Rules for unincorporated land are on the Woodson County page.
Erecting, enlarging, relocating or remodeling a building or structure inside Yates Center city limits
“it shall be unlawful for any person to hereafter erect or cause to be erected within the city of yates center any building or structure of any kind or enlarge or add to the outside dimension thereof”
Land inside Yates Center city limits: the city adopts its own zoning regulations and zoning map by reference
“is by reference incorporated in and by this publication made part of this chapter and article as fully as though set out at length herein and is adopted as the zoning regulations for the city of yates center, kansas.”
Zoning district boundary map for land inside Yates Center city limits
“is adopted as the zoning district boundary map for the city of yates center, kansas”
Lots inside Yates Center city limits served by a private sewage system with subsurface soil absorption
lot area for subsurface soil absorption private sewage system, well water supply: >= 1 acre (if the water supply is from a well) · lot area for subsurface soil absorption private sewage system, public water supply: >= 0.5 acre (if the water supply is public)
“no permit shall be issued for any private sewage disposal system employing subsurface soil absorption facilities where the area of the lot is less than 1 acre if the water supply is from a well, or ½ acre if the water supply is public.”
Accessory buildings and structures inside Yates Center city limits (pools and permanent barbecue grills in a required rear yard)
distance from side or rear lot line: >= 5 feet (open uncovered swimming pools and permanent barbeque grills in a required rear yard)
“accessory, open and uncovered swimming pools and permanent barbeque grills may occupy a required rear yard, provided that they are not located closer than five (5) feet to the side or rear lot line. no alley may be used in meeting this requirement.”
Using a recreational vehicle as a residence on land inside Yates Center city limits
maximum consecutive RV stay: <= 72 hours (use of RVs for a period not to exceed 72 hours is allowed)
“the use of recreational vehicles as residential structures within the city limits of yates center is prohibited.”
Private sewage disposal systems on land inside Yates Center city limits where no public sewer is available
“before commencement of construction of a private sewage disposal system, the owner shall first obtain a written permit signed by the superintendent.”
New private sewage disposal systems inside Yates Center city limits where no public sewer is available
permit and inspection fee: 50 USD (paid at the time the application is filed)
“a permit and inspection fee of $50.00 shall be paid to the city at the time the application is filed.”
Private sewage disposal systems inside Yates Center city limits
“a permit for a private sewage disposal system shall not become effective until the installation is completed to the satisfaction of the superintendent.”
Privies, septic tanks, cesspools, lagoons and other sewage disposal facilities inside Yates Center city limits
“except as hereinafter provided, it shall be unlawful to construct or maintain any privy, privy vault, septic tank, cesspool, lagoon, or other facility intended or used for the disposal of sewage.”
Houses and buildings inside Yates Center city limits when a public sanitary sewer is within 400 feet of the property line
distance from property line to public sanitary sewer: <= 400 feet (requirement to connect applies only when the public sewer is within this distance)
“provided that said public sewer is within four hundred (400) feet of the property line”
Division of land inside Yates Center city limits
“article 5. subdivision regulations 16-501. subdivision regulations incorporated.”
Building permits inside Yates Center city limits
building permit fee, work up to 399 square feet: 25 USD (includes fence, flagpole, dog pen and signage projects) · building permit fee, work 400 square feet and larger: 50 USD (work 400 square feet and larger)
“(a) $25 for work up to 399 square feet, including all fence projects, flagpole projects, dog pens, and signage; and (b) $50 for all work 400 square feet and larger.”
Building permit process inside Yates Center city limits
“without a building permit being first obtained from the city clerk”
We looked and could not find an official answer yet. Silence is not permission; ask Yates Center or Woodson County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Yates Center publishes no rule on the point, not that none exists. Woodson County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Yates Center means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.