Zoning, building permits and septic rules in South Haven Township, Kansas

South Haven Township is a township in Sumner County, Kansas. South Haven Township adopts its own zoning, so inside its limits South Haven Township’s rules apply, not the county’s. Septic permits inside South Haven Township come from Sumner County. 3 rules below are quoted from official sources and independently re-checked, most recently on November 7, 2026. Rules for unincorporated land are on the Sumner County page.

Answers from the rulebook for South Haven Township

South Haven Township’s own rules

  • Building permitLimited

    Changes in land use or use of an existing building, and county-issued excavation, erection, or alteration permits, on unincorporated land inside South Haven township; Sumner County administers the zoning-compliance process.

    • Agricultural uses are excepted from the certificate requirement for changes in land use or use of an existing building.
    • No excavation, erection, or alteration permit may be issued until an application for a Certificate of Zoning Compliance has been made and approved.
    • The certificate application must include a scaled drawing showing the zoning lot, proposed and existing structures, drives, parking/loading, signs, building lines, proposed use, and any other information required by the Zoning Administrator.
    • The Zoning Administrator must issue or refuse the certificate within 10 days after receipt unless the applicant agrees to a further period.
    • A certificate becomes void after 90 days unless construction, structural alteration, moving a structure, or commencing the use occurs; it expires if work is abandoned or suspended for any 180-day period.
    • A fee set by Governing Body resolution accompanies an application; a reissued expired certificate may be issued without an additional fee for due cause.
    • The county regulation does not expressly establish a general construction-code permit requirement for every new residence.

    certificate issuance or refusal period: <= 10 days (A further period may be agreed to by the applicant.) · certificate initial validity: 90 days (Construction, structural alteration, moving a structure, or commencing a use must occur within the period.) · abandonment or suspension period causing expiration: 180 days

    “Zoning Certificate: An official document issued by the Sumner County Zoning Office which authorizes construction, demolition, relocation, or alteration.”
  • Local zoningPresent (with conditions)

    Unincorporated land inside South Haven township, Sumner County, Kansas; the applicable zoning rule-maker is Sumner County, not the township.

    • The county regulations apply to all structures and land in unincorporated Sumner County.
    • An incorporated city is covered only if it elects county administration through an interlocal agreement.
    • Agricultural land and associated agricultural buildings are excluded except in federally designated floodplain areas.
    • Utility-distribution equipment, railroad facilities, specified oil/gas drilling, and federal-government structures have the exclusions stated in Article III, section 3.
    “These Regulations shall apply to all structures and land within the unincorporated area of Sumner County, Kansas”
  • Who permits septicCounty (with conditions)

    Private on-site wastewater systems on unincorporated land inside South Haven township, Sumner County, Kansas; the Sumner County Board of County Commissioners is the Administrative Agency.

    • The on-site wastewater chapter applies to all unincorporated areas in Sumner County.
    • A private wastewater system cannot be constructed or modified until the Administrative Agency issues a permit.
    • Plans and specifications require Administrative Agency approval before a private wastewater system is developed.
    • The system must be inspected and approved before use and may not be covered or made inaccessible before approval.
    • A private wastewater system cannot be constructed within 400 feet of an existing public sewer unless the Administrative Agency finds sewer connection infeasible and a compliant private system can be built.
    • A site cannot be approved where connection to an approved public wastewater system is feasible, where it violates section 2-4.0, where it has less than two acres exclusive of roads, streets, rights-of-way, or easements, or where soil, topography, and geology do not meet section 2-6.0.
    • The Administrative Agency may grant exceptions if reliable information justifies the exception while protecting beneficial uses of state waters and avoiding a nuisance.

    public-sewer separation: < 400 feet (Private system permitted only if the Administrative Agency finds sewer connection infeasible and the private system can meet the code.) · minimum site area: >= 2 acres (Exclusive of roads, streets, other public rights-of-way, or easements.)

    “The Administrative Agency for SUMNER County is designated as the BOARD OF COUNTY COMMISSIONERS.”

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.