Rawlins County, Kansas
Atwood is a city in Rawlins County, Kansas. Atwood adopts its own zoning, so inside its limits Atwood’s rules apply, not the county’s. 20 rules below are quoted from official sources and independently re-checked, most recently on November 12, 2026. Rules for unincorporated land are on the Rawlins County page.
Building permits inside Atwood city, issued by the zoning officer
“A building permit is required if any change in the use of the property is made, any alteration of the structural components is made, or any new construction, including water wells, and private water lines and sewer lines.”
Land inside Atwood city limits
“The following table summarizes uses permitted in each of the zoning districts described in this article:”
Atwood city zoning districts (A-1, R-1, R-2, R-3, MH, MP, C-1, C-2, M-1, M-2)
“the jurisdictional area is hereby divided into zoning districts that are designated as follows: a-1 agricultural district r-1 single-family residential district r-2 duplex residential district r-3 multifamily residential district m-p mobile home park district m-h mobile home subdivision district c-1 retail business district c-2 highway business district m-1 light industrial district m-2 heavy industrial district”
A-1 Agricultural District inside Atwood city
minimum lot area: >= 3 acres · minimum lot width: >= 160 ft
“minimum lot area: three acres for all uses. (2) minimum lot width: 160 feet.”
“minimum lot area: 7,000 square feet. (2) minimum lot width: 50 feet.”
“minimum lot area: 6,000 square feet for single-family residences and 8,000 square feet for two-family residences.”
R-1 Single-Family Residential District inside Atwood city
front yard: >= 25 ft · side yard: >= 8 ft · rear yard: >= 10 ft
“except as modified by the provisions of article vi of this chapter, minimum yard sizes shall be as follows: (1) front yard: 25 feet. (2) side yard: eight feet. (3) rear yard: ten feet.”
“except as modified by the provisions of article vi of this chapter, minimum yard sizes shall be as follows: (1) front yard: 40 feet. (2) side yard: 16 feet. (3) rear yard: 40 feet.”
R-1 Single-Family Residential District inside Atwood city; R-2 is also 30 percent (Sec. 46-283)
maximum lot coverage: <= 30 percent
“(2) minimum lot width: 50 feet. (3) maximum lot coverage: 30 percent.”
A-1 Agricultural District inside Atwood city
maximum height: <= 35 ft (or 2.5 stories)
“maximum structure height: 2½ stories or 35 feet.”
“maximum structure height: 2½ stories or 35 feet.”
Recreational vehicles in FIRM A-type flood zones inside Atwood city; general RV occupancy rule not found
flood zone RV stay: < 180 days (unless meeting manufactured home requirements)
“must either be on the site for fewer than 180 consecutive days, and be fully licensed and ready for highway use or meet the permitting, elevation, and the anchoring requirements for manufactured homes of this article.”
Mobile homes in the M-P Mobile Home Park District inside Atwood city; rules for M-H subdivision district and other districts not reviewed
“Permitted uses. Mobile home parks. For a specific listing of permitted and conditionally permitted uses, see the table of permitted uses in section 46-251.”
Accessory buildings inside Atwood city
“no accessory building shall be used for dwelling purposes.”
Water wells inside Atwood city (city building permit)
“A building permit is required if any change in the use of the property is made, any alteration of the structural components is made, or any new construction, including water wells, and private water lines and sewer lines.”
Mobile home parks in the M-P district inside Atwood city only; general new-home connection rule not found
“Sewage disposal shall be provided to the mobile home park by a public sewer system.”
A-1 zoned areas inside Atwood city
“a building permit is not required in a-1 zoned areas used only for agricultural purposes as provided by k.s.a. 12-715b.”
Flood-related standards for subdivision proposals inside Atwood city; the general subdivision regulations were not reviewed
“all subdivision proposals shall have adequate drainage provided to reduce exposure to flood hazards.”
Special flood hazard areas with base flood elevation data inside Atwood city
lowest floor above base flood elevation: >= 2 ft
“New construction and substantial improvement of any residential structure shall have the lowest floor, including basement, elevated to two feet above the base flood elevation.”
Building permit applications to the zoning officer inside Atwood city
decision time: <= 10 days (or further period agreed by applicant)
“A building permit shall be either issued or refused by the zoning officer within ten days after receipt of an application or within the further period as may be agreed to by the applicant.”
We looked and could not find an official answer yet. Silence is not permission; ask Atwood or Rawlins County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Atwood publishes no rule on the point, not that none exists. Rawlins County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Atwood means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.