Osage County, Kansas
Burlingame is a city in Osage County, Kansas. Burlingame adopts its own zoning, so inside its limits Burlingame’s rules apply, not the county’s. Septic permits inside Burlingame come from Burlingame. 6 rules below are quoted from official sources and independently re-checked, most recently on November 3, 2026. Rules for unincorporated land are on the Osage County page.
Land inside the corporate limits of Burlingame city, Kansas: the city adopts and administers its own zoning regulations by incorporating a code of zoning regulations by reference.
“there is hereby incorporated by reference for the purpose of regulating zoning within the corporate limits of the city of burlingame, kansas”
Private sewage disposal systems using subsurface soil absorption inside Burlingame city. This is a sewage-permit lot-area condition, not a zoning minimum lot size for a district.
minimum lot area for private sewage disposal with subsurface soil absorption: >= 1 acre
“no permit shall be issued for any private sewage disposal system employing subsurface soil absorption facilities where the area of the lot is less than one acre.”
Private sewage disposal systems on land inside Burlingame city limits
“before commencing construction of a private sewage disposal system, the owner shall first obtain a written permit signed by the utility superintendent.”
Construction of a private sewage disposal system on land inside Burlingame city
permit and inspection fee (as stated in Ordinance 1904): 20 USD (stated as a 2000 fee; current fee not verified)
“before commencing construction of a private sewage disposal system, the owner shall first obtain a written permit signed by the utility superintendent.”
Private sewage disposal (non-sewer sanitation) on land inside Burlingame city
“no permit shall be issued for any private sewage disposal system employing a cesspool, lagoon or other such facility unless located within an area zoned "industrial district"”
New residential utility service connections inside Burlingame city: city water and sewer connections are permitted after the connection fee is paid
residential water connection fee: 400 USD · residential sewer connection fee: 250 USD
“a connection fee of $400.00 for natural gas, $250.00 for sewer and $400.00 for water shall be paid by all residential customers.”
We looked and could not find an official answer yet. Silence is not permission; ask Burlingame or Osage County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Burlingame publishes no rule on the point, not that none exists. Osage County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Burlingame means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.