Mitchell County, Kansas
Hunter is a city in Mitchell County, Kansas. Septic permits inside Hunter come from Hunter. 10 rules below are quoted from official sources and independently re-checked, most recently on November 3, 2026. Rules for unincorporated land are on the Mitchell County page.
Lots inside Hunter city limits that would use a subsurface soil absorption private sewage system. This is a septic-permit threshold, not a zoning minimum lot size; no zoning lot-size rule was found.
lot area minimum for subsurface soil absorption system: >= 45000 square feet (bracketed in source text as [45,000])
“shall comply with all recommendations of the department of public health of the state of kansas.”
Placement of a manufactured home inside the special flood hazard areas of Hunter city limits (unnumbered A zones)
“no person, firm, corporation, or unit of government shall initiate any development”
Private sewage disposal systems on land inside Hunter city limits where no public sanitary or combined sewer is available
“no septic tank or cesspool shall be permitted to discharge any natural outlet.”
Construction of a private sewage disposal system inside Hunter city limits where no public sewer is available
permit and inspection fee: 100 USD (paid at the time the application is filed)
“a permit for a private sewage disposal system shall not become effective until the”
Private sewage disposal systems built inside Hunter city limits under a city permit
inspection response time after notice: 72 hours (bracketed in source text as [72])
“portions are covered. the inspection shall be made within [72] hours of the receipt of notice by”
Private sewage disposal on land inside Hunter city limits where no public sewer is available
“no septic tank or cesspool shall be permitted to discharge any natural outlet.”
Existing or new building inside Hunter city limits when a public sanitary or combined sewer is within 100 feet of the property line
distance from property line to public sewer: <= 100 feet (source gives 100 feet (20.5 meters) in brackets) · connection deadline after official notice: 90 days (bracketed in source text as [ninety (90) days])
“accordance with the provisions of this ordinance, within [ninety (90) days] after date of official notice to do so, provided that said public sewer is within [one hundred (100) feet 20.5 meters] of”
Construction or other development inside the special flood hazard areas (unnumbered A zones on FIRM panels) within Hunter city jurisdiction
“no person, firm, corporation, or unit of government shall initiate any development”
Private sewage disposal system permit and inspection fee inside Hunter city limits. Other city fees (for example the city costs and fees resolution 2024-0001) were not read.
permit and inspection fee for private sewage disposal system: 100 USD (paid at time of filing)
“obtain a written permit signed by the superintendent.”
Private sewage disposal system permit process inside Hunter city limits
“obtain a written permit signed by the superintendent.”
We looked and could not find an official answer yet. Silence is not permission; ask Hunter or Mitchell County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Hunter publishes no rule on the point, not that none exists. Mitchell County’s page lists the county offices to call.