Mitchell County, Kansas
Glen Elder is a city in Mitchell County, Kansas. Septic permits inside Glen Elder come from Glen Elder. 10 rules below are quoted from official sources and independently re-checked, most recently on November 9, 2026. Rules for unincorporated land are on the Mitchell County page.
Erecting, enlarging, relocating, or remodeling a building or structure inside Glen Elder city.
“It shall be unlawful for any person to hereafter erect or cause to be erected within the city any building or structure of any kind or enlarge or add to the outside dimension thereof, or relocate any building or structure already erected or which may hereafter be erected or remodel any building or structure within the city without a building permit being first obtained therefor from the city clerk, after approval by the chief building official or his or her duly authorized assistant.”
An owner personally performing building or construction work at the owner's own residence in Glen Elder city.
“Nothing herein contained shall prohibit any property owner from personally performing any building or construction work within and upon his or her own residence and intended for his or her personal use and permanent occupancy; provided, the owner shall satisfy the building inspector as to his or her ability to perform such work, secure a permit, pay required fees, do work in accordance with this article, and apply for an inspection and receive a certificate of approval.”
Buildings and structures in Glen Elder city.
adopted code edition: International Building Code, 2000 Edition
“International Building Code, 2000 Edition”
New construction and additions to existing buildings performed under a city building permit inside Glen Elder city.
initial inspection fee: 5 USD · subsequent inspection fee: 5 USD (for subsequent inspections required)
“Upon the completion of any building construction work covered by this article, it shall be the duty of the person doing such work to notify the building inspector and request that it be inspected; after which such work shall be inspected promptly as hereinafter provided.”
Lots proposed to use a private sewage-disposal system with subsurface soil absorption facilities inside Glen Elder city.
minimum lot area: >= 1 acre (private sewage disposal system employing subsurface soil absorption facilities)
“No permit shall be issued for any private sewage disposal system employing subsurface soil absorption facilities where the area of the lot is less than one acre. No septic tank or cesspool shall be permitted to discharge to any public sewer or natural outlet.”
Private sewage-disposal systems inside Glen Elder city where public sanitary sewer is unavailable under City Code § 15-402.
“Before commencing construction of a private sewage disposal system, the owner shall first obtain a written permit signed by the utility superintendent. The application shall be accompanied by any plans, specifications or other information deemed necessary by the utility superintendent.”
Construction of a private sewage-disposal system inside Glen Elder city.
private sewage disposal system permit and inspection fee: 100 USD
“Before commencing construction of a private sewage disposal system, the owner shall first obtain a written permit signed by the utility superintendent. The application shall be accompanied by any plans, specifications or other information deemed necessary by the utility superintendent. A permit and inspection fee of $100 shall be paid to the city at the time the application is filed.”
Private sewage-disposal-system construction inside Glen Elder city.
inspection response time: <= 48 hours (after receipt of notice by the superintendent)
“The utility superintendent or his or her authorized representative shall be allowed to inspect the work at any stage of construction and the applicant shall notify the superintendent when the work is ready for final inspection or before any underground portions are covered. The inspection shall be made within 48 hours of the receipt of notice by the superintendent.”
Private sewage disposal inside Glen Elder city where public sanitary sewer is unavailable under City Code § 15-402.
minimum lot area for subsurface soil absorption facility: >= 1 acre
“Where a public sanitary sewer is not available under the provisions of section 15-402 the building sewer shall be connected to a private sewage disposal system complying with the provisions of sections 15-411 to 15-416.”
City building permits in Glen Elder city.
building permit minimum fee: 25 USD (or 0.25% of total project cost, whichever is greater) · building permit project-cost percentage: 0.25 percent (minimum $25; whichever is greater)
“The fee for a building permit shall be a minimum of $25 or .25% of the total cost of the project, whichever is greater. The fee shall be paid to the city clerk upon filing an application for a building permit and the same shall be credited to the General Operating fund of the City, provided, however, that in the event a Notice to Proceed is issued, or the improvement or relocation of any structure is commenced before issuance of a permit or under this ordinance, and a building permit is subsequently issued, the fee for a building permit in such instance shall be $25 or .25% of total project cost – whichever is greater.”
We looked and could not find an official answer yet. Silence is not permission; ask Glen Elder or Mitchell County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Glen Elder publishes no rule on the point, not that none exists. Mitchell County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Glen Elder means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.