Haskell County, Kansas
Satanta is a city in Haskell County, Kansas. Satanta adopts its own zoning, so inside its limits Satanta’s rules apply, not the county’s. 13 rules below are quoted from official sources and independently re-checked, most recently on November 3, 2026. Rules for unincorporated land are on the Haskell County page.
Erecting, constructing or enlarging buildings or structures in Satanta city, and placing fencing; the permit is issued by the building official
minimum project size: >= 200 square feet
“said permits shall only apply to projects of 200 square feet or more.”
Building construction inside Satanta city limits
“that certain standard code known as the "national building code, 1955 edition, abbreviated," and the january, 1958 amendments thereto, recommended by the national board of fire underwriters, 222 west adams street, chicago, illinois, is hereby incorporated by reference herein and made a part of this article”
Land inside Satanta city limits. The city's code refers to its own zoning ordinances and zoning map; the zoning ordinance text itself was not located.
“(p) any zoning ordinance or ordinances changing the zoning classification of any property within the city or amending the city's zoning map;”
Any structure in Satanta city limits outside the central business district (citywide building-code setback; not district-specific)
street or alley setback: >= 15 feet (Central business district exempt) · neighboring property line setback: >= 5 feet (Fences excluded; central business district exempt) · corner intersection setback: >= 20 feet (Central business district exempt)
“any structure, unless located within the central business district, shall be constructed so that: (1) at no point is it closer than fifteen (15) feet to any city street or alley.”
Living in a recreational vehicle as a residence on land inside Satanta city limits
RV stay without permit: <= 72 hours (Approval may extend to 14 days total) · RV temporary use permit term: <= 60 days (Renewable for an additional 60 days) · RV temporary use permit fee: 75 USD (Per 60-day application)
“the use of recreational vehicles as residential structures within the city limits of satanta, kansas is prohibited except as provided herein.”
Short-term occupancy of a recreational vehicle on land inside Satanta city limits
RV short-term use: <= 72 hours
“the use of recreational vehicles for a period not to exceed 72 hours is allowed whether or not another structure exists on the lot.”
Mobile and manufactured homes placed on land inside Satanta city limits
manufactured date age limit: <= 15 years · location use permit fee: 25 USD
“no mobile home shall be placed upon any property located within the city of satanta unless the owner shall first obtain a location use permit from the city clerk”
“no building or structure of a temporary nature, or trailer, trailer house, mobile home or trailer or structure of other design modified or adapted for the purpose of providing living accommodations shall be permitted to be built, parked, or situated within the fire district described herein”
Mobile homes placed inside Satanta city limits. The general rule for site-built homes was not found.
“each mobile home, whether located in a mobile home park or a single lot, shall have a separate water meter and connection to the city water supply. all mobile homes shall be connected to the city sewage system and be charged the same water and sewage connection and use fees as residential homes.”
Subdividing land inside Satanta city limits
“the governing body of the city, in reviewing all subdivision applications, shall make findings of fact and determine if:”
Construction in flood hazard locations inside Satanta city limits
“the building official in reviewing all applications for construction in flood hazard locations within the city shall require that any such proposed construction must:”
Permits issued by the city in Satanta city limits (fire-limit building permit, RV temporary use permit, mobile home location permit)
fire-limit building permit fee: 1 USD · RV temporary use permit fee: 75 USD (Per 60-day application) · mobile home location use permit fee: 25 USD
“a fee in the amount of $10.00 for each building permit shall be paid to the building official at the time the application for building permit is submitted to the building official.”
Building permit application inside Satanta city limits, filed with the building official
filing lead time: >= 7 days
“such permit application shall be filed at least seven (7) days prior to the actual beginning of work at the construction site.”
We looked and could not find an official answer yet. Silence is not permission; ask Satanta or Haskell County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Satanta publishes no rule on the point, not that none exists. Haskell County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Satanta means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.