Butler County, Kansas
Clifford Township is a township in Butler County, Kansas. Septic permits inside Clifford Township come from Butler County (Butler County Environmental Health Division · 316-322-4325). 13 rules below are quoted from official sources and independently re-checked, most recently on October 30, 2026. Rules for unincorporated land are on the Butler County page.
Clifford Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Construction, demolition and remodeling of structures inside Clifford township, which is unincorporated Butler County territory
“the steps in the process include: plan, site plan, and land use review construction permitting on-site project inspection”
Construction, demolition and remodeling of structures inside Clifford township, which is unincorporated Butler County territory
“butler county has adopted codes applicable to all structures being constructed or remodeled, and this division is responsible for seeing that all construction is done in accordance with those codes.”
Construction, demolition and remodeling of structures inside Clifford township, which is unincorporated Butler County territory
“the steps in the process include: plan, site plan, and land use review construction permitting on-site project inspection”
Rural Residential (RR) district land in unincorporated Butler County, including inside Clifford township if zoned RR
minimum lot size (RR, septic plus public water): >= 3 acre (5 acres if a lagoon is proposed)
“rural residential-rr-article 8 minimum lot size is 3 acres with the use of an alternative waste treatment system or septic system and service supplied by public water.”
Agricultural AG-40 and AG-80 district land in unincorporated Butler County, including inside Clifford township if zoned AG
front setback (residential dwelling): >= 75 feet (measured from front property line) · side setback (residential structure): >= 50 feet (agricultural-purpose structures exempt) · rear setback (residential structure): >= 50 feet (agricultural-purpose structures exempt)
“75 feet from the front property line for any residential dwelling.”
“rural residential-setbacks as measured from property lines and easements: 75 feet from front property line. 50 feet from side and rear property lines for any residential dwelling.”
Manufactured home parks in the county MH district; the MH rule does not state the rule for a single manufactured home on an AG or RR lot
minimum park area: >= 1 acre
“manufactured housing-mh-article 13 regulations and restrictions are intended to accommodate the grouping of manufactured home sites in manufactured housing parks for use under rental or lease arrangement”
On-site wastewater (septic) systems on land inside Clifford township, which is unincorporated Butler County territory
“issues permits for on-site wastewater treatment systems inspects such systems for compliance with the code”
Installing an on-site wastewater treatment system on land inside Clifford township
“issues permits for on-site wastewater treatment systems inspects such systems for compliance with the code”
On-site wastewater treatment systems installed inside Clifford township
“issues permits for on-site wastewater treatment systems inspects such systems for compliance with the code”
Land used for agricultural purposes inside Clifford township, as defined in the county zoning regulations, exempt from those zoning regulations
“all lands used for agricultural purposes, as defined in these regulations, are and shall be exempt from the restrictions and limitations of these regulations.”
Division of land inside Clifford township, which is unincorporated Butler County territory
“the planning and zoning division consults with and advises citizens of the regulations and requirements of the butler county zoning and subdivision regulations (including floodplain regulations) and enforces the regulations.”
Construction permitting for structures inside Clifford township, which is unincorporated Butler County territory
“the steps in the process include: plan, site plan, and land use review construction permitting on-site project inspection”
We looked and could not find an official answer yet. Silence is not permission; ask Clifford Township or Butler County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Clifford Township publishes no rule on the point, not that none exists. Butler County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Clifford Township means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.