Starke County, Indiana
Davis Township is a township in Starke County, Indiana. Septic permits inside Davis Township come from Starke County (Starke County Health Department · (574) 772-9139). 10 rules below are quoted from official sources and independently re-checked, most recently on October 30, 2026. Rules for unincorporated land are on the Starke County page.
Davis Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Owner performing work on a residence inside Davis township (unincorporated) under a Starke County building permit
“the affidavits shall state the type of work and who will be doing the work (owner or contractor)”
Permitted residential construction inside Davis township (outside any incorporated town)
advance notice before inspection: 24 hours (a request received before 8:00 a.m. may be inspected the same day)
“the owner of a permit is required by law to notify this office 24 hours in advance when construction is ready for the following inspections”
Unincorporated land inside Davis township, Starke County, Indiana. The county Z-1 zoning ordinance is the zoning rule; no zoning ordinance adopted by Davis township was located.
“and it meets all other requirements in the starke county z-1 zoning ordinance”
Single-family dwellings on unincorporated land inside Davis township under county Chart #1 (the district is not named in the chart text)
maximum height, single-family dwelling: 35 feet (up to 45 feet if side yards are each 25 feet, minimum)
“maximum height: dwellings 35 feet: or up to 45 feet if side yards are each 25 feet, minumum.”
“residential accessory buildings 18 feet: or up to 25 feet if side yards are each 15, feet, minimum.”
Septic systems for new residential construction inside Davis township; the Starke County Health Department handles approval
“starke county health department if proposed sewage disposal is to be by septic tank”
Residential construction inside Davis township using a septic tank
“starke county health department if proposed sewage disposal is to be by septic tank”
New residential construction inside Davis township that would dispose of sewage by connecting to a sewer utility
“sewer utility company if proposed sewage disposal is to be by connecting to a private utility company.”
New or remodeled residential driveway entrance inside Davis township
driveway width: 12 feet (with 4 inches of pit run gravel to the front line of the house)
“driveways 12' wide with 4 inches of pit run gravel to front line of house to the road.”
Building permit process for residential construction inside Davis township under the Starke County Planning Commission building division
permit pickup window after approval: 30 days (applicant must pick up the permit and pay the fee)
“the applicant has thirty (30) days in which to pick up the permit and pay the fee.”
We looked and could not find an official answer yet. Silence is not permission; ask Davis Township or Starke County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Davis Township publishes no rule on the point, not that none exists. Starke County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Davis Township means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.